Skip to main content

Integration of Time Management in the Digital Factory

  • Conference paper
  • First Online:
New World Situation: New Directions in Concurrent Engineering

Part of the book series: Advanced Concurrent Engineering ((ACENG))

Abstract

This paper reflects the current work on the integration of Time Management in the Digital Factory. To eliminate deficits in the integration of leading planning tools, a methodical approach was established in order to develop application protocols based on a systematic basis for the Digital Factory. Therefore, a joint project with both industrial and research partners has been initiated. Beside the fundamental methodology for the standardisation in the Digital Factory as further important result an interface between the software products Teamcenter Manufacturing and TiCon will be developed.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. VDI-Richtlinie 4499, Blatt 1: Digitale Fabrik—Grundlagen. Berlin: Beuth-Verlag; 2009.

    Google Scholar 

  2. Petzelt D, Schallow J, Deuse J, Rulhoff S. Anwendungsspezifische Datenmodelle in der Digitalen Fabrik. ProduktDaten J. 2009;16(1):45–8.

    Google Scholar 

  3. Anderl R, Trippner D. STEP standard for the exchange of product model data. Stuttgart, Leipzig: B.G. Teubner; 2000. S. 77–83.

    Google Scholar 

  4. Deuse J, Petzelt D, Schallow J, Reinhart G, Wiedemann M, Magenheimer K. Anwendungsprotokoll zur Prozessharmonisierung in der Digitalen Fabrik. Z Wirtschaft Fabrik 2009;104(1–2):11–5.

    Google Scholar 

  5. ISO 10303-214 Industrial automation systems and integration—Product data representation and exchange—Part 214: Application protocol: Core data for automotive mechanical design processes. Berlin: Beuth-Verlag; 2003.

    Google Scholar 

  6. Product Lifecycle Management (PLM) Services 2.0. http://www.omg.org/spec/PLM/. Accessed 16 Feb 2010.

  7. PLM XML. http://www.plm.automation.siemens.com/en_us/products/open/plmxml/index.shtml. Accessed 24 Mar 2010.

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Stefan Rulhoff .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag London Limited

About this paper

Cite this paper

Eberhardt, U., Rulhoff, S., Stjepandic, J. (2010). Integration of Time Management in the Digital Factory. In: Pokojski, J., Fukuda, S., Salwiński, J. (eds) New World Situation: New Directions in Concurrent Engineering. Advanced Concurrent Engineering. Springer, London. https://doi.org/10.1007/978-0-85729-024-3_4

Download citation

  • DOI: https://doi.org/10.1007/978-0-85729-024-3_4

  • Published:

  • Publisher Name: Springer, London

  • Print ISBN: 978-0-85729-023-6

  • Online ISBN: 978-0-85729-024-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics