Orders Loading and Release in Flow Shops including Outsourcing Networks

  • I. P. Tatsiopoulos
  • A. Batsis
  • A. G. Papadopoulos
Part of the IFIP – The International Federation for Information Processing book series (IFIPAICT, volume 257)

Purpose of this paper is to analyse and compare the behavior of workload control models in flow shops of both the MTO (Make-To-Order) and MTS (Make-To-Stock) classes. A simulation model has been built, where a manufacturing cell is loaded through an input control mechanism with shop orders coming from a “pool”. The “pool” itself is fed with planned orders coming from an MRP system. The MRP system releases production orders every planned period and the input control mechanism decides for the actual release of work orders. Conclusions are drawn for the performance of the system with or without an MRP system and with or without the input control mechanism in MTO and MTS environments. Compared to the pure flow shop routing, any set of stations might be excluded from the routing or replaced by subcontractors belonging to an outsourcing network of the manufacturing company. Thus, the general flow shop may still show routing variety with respect to routing lengths, though there is one flow direction with outsourcing interruptions.

Keywords

Lead Time Flow Shop Work Centre Manufacturing Cell Order Release 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

References

  1. 1.
    Baker, K.R., 1984, “The Effects of Input Control In a Simple Scheduling Model”, Journal of Operations Management, Vol. 4, No. 2, pp. 99–112.CrossRefGoogle Scholar
  2. 2.
    Bechte, W., 1988, “Theory and Practice of Load-oriented Manufacturing Control”, International Journal of Production Research, Vol. 26, No. 3, pp. 375–395.CrossRefGoogle Scholar
  3. 3.
    Bechte, W., 1994, “Load-oriented Manufacturing Control, Just-In-Time Production for Job Shops”, Production Planning and Control, Vol. 5, No.3, pp. 292–307.CrossRefGoogle Scholar
  4. 4.
    Bergamaschi et al., 1997, “Order Review and Release Strategies in a Job Shop Environment: A Review and Classification”, Int. Journal of Production Research, Vol. 35, No.2, 339–420.Google Scholar
  5. 5.
    Bertrand, J.W.M. and J.C. Wortmann, 1981, “Production Control and Information Systems for Component Manufacturing Shops”, Elsevier, Amsterdam.Google Scholar
  6. 6.
    Bertrand, J.W.M., Wortmann, J.C. and Wijngaard J., 1990, “Production Control. A Structural and Design Oriented Approach”, Elsevier, Amsterdam.Google Scholar
  7. 7.
    Bertrand, J.W.M. and H.P.G. Van Ooijen, 1991, “Flow Rate Flexibility in Complex Production Departments”, International Journal of Production Research, Vol. 29, No. 4, pp. 713–724.CrossRefGoogle Scholar
  8. 8.
    Bertrand, J.W.M. and H.P.G. van Ooijen, 1996, “Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems”, Intern. J. of Prod. Econ. (46-47) 1-3, pp. 1–12.Google Scholar
  9. 9.
    Bestwick, P.F. and K. Lockyer, 1982, “Quantitative Production Management”, Pitman Publishing, Mass.Google Scholar
  10. 10.
    Enns, S.T., 1995, “An integrated system for controlling shop loading and work flows”, Int. Journal of Production Research, Vol. 33, No. 0, pp. 2801–2820.MATHCrossRefGoogle Scholar
  11. 11.
    Glassey and Resende, 1998, “Closed-loop Job Release Control for VLSI Circuit Manufacturing”, IEEE Transactions on Semiconductor Manufacturing, 1, 1, 36–46.CrossRefGoogle Scholar
  12. 12.
    Henry, L.C. and B.G. Kingsman, 1991, “Job Release: Part of a Hierarchical System to manage manufacturing lead times in make-to-order companies”, J. Opl. Res. Soc., 42, pp. 871–883.CrossRefGoogle Scholar
  13. 13.
    Hopp, W.J. and M.L. Spearman, 2000, “Factory Physics”, McGraw Hill, Boston.Google Scholar
  14. 14.
    Irastorza, J.C. and R.H. Deane, 1974, “A Loading and Balancing Methodology for Job Shop Control”, AIIE Transactions, Vol. 6, No. 4, pp. 302–307.Google Scholar
  15. 15.
    Kingsman, B.G., Tatsiopoulos, I.P. and L.C. Hendry, 1989, “A Structural Methodology for Managing Manufacturing Lead Times In Make-to-Order Companies”, European Journal of Operational Research, Vol. 40, pp. 196–209.CrossRefGoogle Scholar
  16. 16.
    Kingsman, B., 2000, “Modelling Input-Output workload control for dynamic capacity planning in production planning systems”, Int. J. of Production Economics, 68 (1), pp 73–93.CrossRefGoogle Scholar
  17. 17.
    Land, M.J. and Gaalman G.J., 1996, “Workload Control Concepts in Job Shops: A Critical Assessment”, Int. Journal of Production Economics, Vol. 46–47, pp. 535–548.CrossRefGoogle Scholar
  18. 18.
    Melnyk, S.A. and G.L. Ragatz, 1989, “Order Review/Release: Research Issues and Perspectives”, International Journal of Production Research, Vol. 27, No. 7, pp. 1081–1096.CrossRefGoogle Scholar
  19. 19.
    Oosterman, B., Land, M., Gaalman, G., 2000, “The Influence of Shop Characteristics on Workload Control”, Int. J. of Production Economics, 68 (1), pp. 107–119.CrossRefGoogle Scholar
  20. 20.
    Plossl, G. and Wight, O., 1973, Capacity Planning and Control, Production and Inventory Management, 3rd Qtr., pp. 31–67.Google Scholar
  21. 21.
    Plossl, G.W. and W.E. Welch, 1979, “Decision Systems for Inventory Management and Production Planning”, Reston Publ. Co.Google Scholar
  22. 22.
    Tatsiopoulos, I.P. and B.G. Kingsman, 1983, “Lead Time Management”, European Journal of Operational Research, Vol. 14, pp. 351–358.CrossRefGoogle Scholar
  23. 23.
    Tatsiopoulos, I.P, 1986, “Some Aspects of the Input/Output Methods for Managing Work-in-process Inventories”, Engineering Costs and Production Economics, No. 15, pp. 235.CrossRefGoogle Scholar
  24. 24.
    Tatsiopoulos I.P., 1993, “Simplified production management software for the small manufacturing firm”, Production Planning and Control, 15, 25–40.Google Scholar
  25. 25.
    Wein, 1988, Scheduling Semiconuctor in Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1, 3, 115–130.CrossRefMathSciNetGoogle Scholar
  26. 26.
    Welch, P.D., 1983, “The Statistical Analysis of Simulation Results”, in the “Computer Performance Modelling Handbook”, S.S. Lavenberg, ed., pp. 268–232, Academic Press, NY.Google Scholar
  27. 27.
    Wiendhal, H.P., 1995, “Load Oriented Manuacturing Control”, Springer Verlag, Berlin.Google Scholar
  28. 28.
    Wight, O.W., 1970, “Input/Output Control: a Real Handle on Lead -Time”, Production & Inventory Management, Vol. 11, 3rd Quarter.Google Scholar

Copyright information

© International Federation for Information Processing 2008

Authors and Affiliations

  • I. P. Tatsiopoulos
    • 1
  • A. Batsis
  • A. G. Papadopoulos
  1. 1.Industrial ManagementNational Technical University of AthensZografosGreece