Abstract
The Lunar Roving Vehicle had eight primary subsystems. These subsystems were engineered and tested concurrently. It is extraordinary that the design, testing, production and delivery of the flight units was achieved in less than eighteen months.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Rights and permissions
Copyright information
© 2007 Praxis Publishing Ltd.
About this chapter
Cite this chapter
(2007). The Lunar Roving Vehicle subsystems. In: Lunar and Planetary Rovers. Springer Praxis Books. Springer, New York, NY. https://doi.org/10.1007/978-0-387-68547-2_2
Download citation
DOI: https://doi.org/10.1007/978-0-387-68547-2_2
Publisher Name: Springer, New York, NY
Print ISBN: 978-0-387-30774-9
Online ISBN: 978-0-387-68547-2
eBook Packages: Physics and AstronomyPhysics and Astronomy (R0)