Abstract
At present, one can watch fast and extensive changes in the basic conditions for companies which are reflected by the unstable market and by the worldwide competition with internationally operating companies. Because of this, the fundamental problem of the companies is to guarantee a permanent reaction to the reqirements of the market. This results in the demand of reduced planning periods and a demand oriented start of reorganization activities in the current operation. The use of reference models for anticipation and simulation of factory structures and processes is suitable from the planning’s point of view. However, to reach the whole rationalization potentials during the planning by using reference models, they have to be used along the whole logistic chain of order processing including all resources. The intention of the following article is to explain how the employment of reference models during and after the planning process can help to guarantee a high level of competitiveness.
Chapter PDF
Literature
Aggteleky, B. (1990) Fabrikplanung Band 1–3. Carl Hanser Verlag, München. Bissel, D. (1997) Beitrag zur Prozeßorientierten Fabrikplanung. Verlag Praxiswissen, Dortmund 1997.
Bullinger, H.-J. and Warnecke, H.J (1996) Neue Organisationsformen in Unternehmen. Springer-Verlag, Berlin Heidelberg. de Jongh, H. (1991) Neue Anforderungen an die Fabrik-und Organisationsplanung fordern neue Lösungen, Fördertechnik,12/1991.
Fairthlough, G. (1994) Creative Compartments — A Design for Future Organisation. Adammantine Press Limited, London 1994.
Hölken, N. (1995) Referenzmodell für Produktion und Logistik. Interner Bericht, Fraunhofer Institut für Materialflug und Logistik, 07. 1995.
Koller, R. (1985) Konstruktionslehre für den Maschinenbau. 2. Auflage, Springer-Verlag, Berlin, 1985.
König, H. and de Ridder, I.L. (1992) CIMOSA: Architektur für Offene Systeme und
Modellierung von Unternehmensprozessen, CIM-Management,4/1992, 4–11.
Kuhn, A. (1995) Prozeßketten in der Logistik. Verlag Praxiswissen, Dortmund. Lange, W. D. (1992) Simulation von Fertigungsinseln — Verifizierung statischer Planungsergebnisse. gfmt, München.
Martin, J. (1989) Methodik zur Planung und Bewertung gruppentechnologischer Fertigungsstrukturen in der Einzel-und Kleinserienfertigung. TÜV-Rheinland, Köln.
Potyka, S. (1994) Graphisch unterstützte, modulare Systematik zur Selektion von Kommissioniersystemen in der konzeptionellen Planung. Dissertation an der Universität Dortmund, Dortmund.
Warnecke, H.J. (1994) Revolution in der Unternehmenskultur. Springer-Verlag, Berl in Heidelberg.
Zahn, E. (1987) Produktionstechnologien als Element internationaler Wettbewerbsstrategien, Innovation und Wettbewerbsfähigkeit, (ed. Dichtl, E.; Gerke, W.; Kieser, A. ), Wiesbaden.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1998 Springer Science+Business Media Dordrecht
About this chapter
Cite this chapter
Abramowski, M. (1998). Demand oriented factory planning through reference models. In: Schönsleben, P., Büchel, A. (eds) Organizing the Extended Enterprise. IFIP — The International Federation for Information Processing. Springer, Boston, MA. https://doi.org/10.1007/978-0-387-35295-4_17
Download citation
DOI: https://doi.org/10.1007/978-0-387-35295-4_17
Publisher Name: Springer, Boston, MA
Print ISBN: 978-1-4757-6113-9
Online ISBN: 978-0-387-35295-4
eBook Packages: Springer Book Archive