Abstract

Some of the most challenging issues that arise in the domain of distributed manufacturing technology and management include manufacturability analysis, validation and evaluation of process plans, partnership in virtual enterprises, process design, and optimization of production plans and schedules. These issues are easily unified within a framework of a project-driven manufacturing concept which is focusing on small and medium size enterprises (SMEs) where products are manufactured based on make-to-order or build-to-order principle.

Regardless of character and scope of business activities a modern enterprise, has to build a project-driven development strategy in order to respond to challenges imposed by growing complexity and globalization. Managers need to be able to utilize a modern decision support tools as to undertake optimal business decisions in further strategic perspective of enterprise operation. In this context this contribution covers various issues of project management engineering while focusing in the field of Project-Driven Manufacturing, particularly in domains regarding the development of novel constraint programming based mathematical models and related decision-making methods as well as their implementation into the task oriented decision support systems aimed at project-driven SMEs management.

Keywords

Decision support constraint logic programming production planning modeling scheduling 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Anavi-Isakow, S. and Golany, B. (2003). Managing multi-project environments through constant work-in-process, International Journal of Project Management 21:9–18.CrossRefGoogle Scholar
  2. Banaszak, Z., Zaremba, M., Muszyński, W. (2005). CP-based decision making for SME, in: Preprints of the 16th IFAC World Congres, P. Horacek, M. Simandl and P. Zitek, eds, 3–8 July, 2005, Prague, Czech Republic, DVD.Google Scholar
  3. Banaszak, Z., and Zaremba, M. (2004a). CLP-based project-driven manufacturing, Prep, of the 7th IFAC Symposium on Cost Oriented Automation, June 6–9, 2004, Gatineau, Quebec, Canada, pp. 269–274.Google Scholar
  4. Banaszak, Z., and Zaremba, M. (2004b). Project-driven management support for web-enabled manufacturing, in: Prep, of the 11th IFAC Symposium on Information Control Problems in Manufacturing, C.E. Pereira, ed, Salvador, Brasil, 5–7 April, 2004, CD-ROM.Google Scholar
  5. Banaszak, Z., Skolud, B. and Zaremba, M. (2003). Computer-aided prototyping of production flows for a virtual enterprise. Journal of Intelligent Manufacturing 14:83–106.CrossRefGoogle Scholar
  6. Banaszak, Z. (2003). Workflows management for project-driven manufacturing. Prep. the 7th IFAC Workshop on Intelligent Manufacturing Systems, 6–8 April, 2003, Budapest, Hungary, pp. 149–154.Google Scholar
  7. Banaszak, Z. and Pisz, I. (2003). Project-driven production flow management, in: Project-Driven Manufacturing, Z. Banaszak and J. Józefowska, eds, WNT, Warsaw, pp. 53–71.Google Scholar
  8. Banaszak, Z. and Józefczyk, J. (2005). Towards CLP-based task oriented DSS for SME, Applied Computer Science and Production Management 1:161–180.Google Scholar
  9. Barták, R. (2004). Incomplete depth-first search techniques: a short survey, in: Proceedings of the 6th Workshop on Constraint Programming for Decision and Control, J. Figwer, ed, June 29, 2004, Gliwice, Poland, pp. 7–14.Google Scholar
  10. Barták, R. (2003). Constraint-based scheduling: an introduction for newcomers, Prep. of the 7th IFAC Workshop on Intelligent Manufacturing Systems, 6–8 April, 2003, Budapest, Hungary, pp. 75–80.Google Scholar
  11. Bartak, R. (1998). On-line guide to constraint programming, Prague, http://kti.mff.cuni.cz/~bartak/constraints/.Google Scholar
  12. Blazewicz, J., Lenstra, J.K. and Rinnooy Kan, A.H.G. (1983). Scheduling subject to resource constraints, Discrete Applied Mathematics 5:11–24.CrossRefMathSciNetGoogle Scholar
  13. Brucker, P., Drexl, A., Möhring, R., Neumann, K. and Pesch, E. (1999). Resource-constrained project scheduling: notation, classification, models and methods, European Journal of Operational Research 112:3–41.CrossRefGoogle Scholar
  14. Chin-Yin, H. (2002). Distributed manufacturing execution systems: A workflow perspective, Journal of Intelligent Manufacturing 13:485–497.CrossRefGoogle Scholar
  15. Kis, T., Ërdos, G., Màrkus, A. and Vàncza, J. (2004). A Project-Oriented Decision Support Systems for Production Planning in Make-to-Order Manufacturing, ERCIN News, Bo.58.Google Scholar
  16. Lamma, E., Mello, P. and Milano, M. (1997). A distributed constraint-based scheduler, Artificial Intelligence 11:91–105.CrossRefGoogle Scholar
  17. Leach, L.P. (2000). Critical chain project management, Artech House, London.Google Scholar
  18. Lova A., Maroto, C. and Tormos, P. (2000). A multicriteria heuristic method to improve resource allocation in multiproject scheduling, European Journal of Operational Research 127:408–424.CrossRefGoogle Scholar
  19. Payne, J.H. (1995). Management of multiple simultaneous projects: State-of-art review, International Journal of Project Management 13:163–168.CrossRefGoogle Scholar
  20. Ratchev, S. M., Shiau, J. and Valtchanov, G. (2000). Distributed product and facility prototyping in extended manufacturing enterprises, International Journal of Production Research 38:4495–4506.CrossRefGoogle Scholar
  21. Rossi, F. (2000). Constraint (Logic) programming: A Survey on Research and Applications, in: New Trends in Constraints, K.R. Apt et al, eds, LNAI 1865, Springer-Verlag, Berlin, pp. 40–74.Google Scholar
  22. Tomczuk, I. and Banaszak, Z. (2005). Production flow planning based on CLP approach, Computer Integrated Management, R. Knosala, ed, WNT, Warszawa, pp. 589–600. (in Polish)Google Scholar
  23. Tomczuk, I. and Banaszak, Z. (2004). Constraint programming approach for production flow planning, Proceedings of the 6th Workshop on Constraint Programming for Decision and Control, June 29, 2004, Gliwice, Poland, pp. 47–54.Google Scholar
  24. Tomczuk, I., Bzdyra, K. and Banaszak, Z. (2005). Towards CLP-based task-oriented DSS for SME, Applied Computer Science and Production Management 1:181–200.Google Scholar
  25. Van Henteryck, P., Perron, L. and Puge, J. (2000). Search and Strategies in OPL, ACM Transactions on Computational Logic 1:1–36.Google Scholar
  26. Wallace, M. (2000). Constraint Logic Programming, In Kakas A.C., and Sadri F., editors, Computational Logic, LNAI 2407, Springer-Verlag, Berlin, Heidelberg, pp. 512–532.Google Scholar
  27. Wei, C. C., Liu, P.-H. and Tsai, Y.-C. (2002). Resource-constrained project management using enhanced theory of constraint, International Journal of Project Management 20:561–567.CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC 2006

Authors and Affiliations

  • Zbigniew A. Banaszak
    • 1
  1. 1.Faculty of Electronics and Computer ScienceTechnical University of KoszalinKoszalinPoland

Personalised recommendations