Abstract

This study proposes, develops and tests a hybrid neural approach (HNA) for the resource constrained project scheduling problem. The approach is a hybrid of the adaptive-learning approach (ALA) for serial schedule generation and the augmented neural network (AugNN) approach for parallel schedule generation. Both these approaches are based on the principles of neural networks and are very different from Hopfield networks. In the ALA approach, weighted processing times are used instead of the original processing times and a learning approach is used to adjust weights. In the AugNN approach, traditional neural networks are augmented in a manner that allows embedding of domain and problem-specific knowledge. The network architecture is problem specific and a set of complex neural functions are used to (i) capture the constraints of the problem and (ii) apply a priority rule-based heuristic. We further show how forward-backward improvement can be integrated within the HNA framework to improve results. We empirically test our approach on benchmark problems of size J30, J60 and J120 from PSPLIB. Our results are extremely competitive with existing techniques such as genetic algorithms, simulated annealing, tabu search and sampling.

Keywords

Project Management Resource Constrained Project Scheduling Neural Networks Heuristics 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Agarwal, A., Jacob, V.S. and Pirkul, H. (2003). Augmented neural networks for task scheduling, European Journal of Operational Research, 151(3):481–502.CrossRefMathSciNetGoogle Scholar
  2. Agarwal, A., Colak, S. and Eryarsoy, E. (2005). Improvement heuristic for the flow-shop scheduling problem: an adaptive-learning approach, European Journal of Operational Research, 169(3):801–815.CrossRefMathSciNetGoogle Scholar
  3. Alcaraz, J. and Maroto, C. (2001). A robust genetic algorithm for resource allocation in Project Scheduling, Annals of Operations Research. 102:83–109.CrossRefMathSciNetGoogle Scholar
  4. Alcaraz, J., Maroto, C. and Ruiz, R. (2004). Improving the performance of genetic algorithms for the RCPS problem, Proceedings of the Ninth International Workshop on Project Management and Scheduling, pp. 40–43.Google Scholar
  5. Alvares-Valdes, R. and Tamarit, J.M. (1989). Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis, in: Advances in Project Scheduling, R. Slowinski, J. Weglarz (Eds.), Elsevier, Amsterdam, pp. 113–134.Google Scholar
  6. Baar, T., Brucker, P. and Knust, S. (1997). Tabu search algorithms for resource-constrained project scheduling problems, in: Metaheuristics: Advances and Trends in Local Search Paradigms for Optimisation, S. Voss, S. Martello, I. Osman, C. Roucairol (Eds.), Kluwer, pp. 1–18.Google Scholar
  7. Blazewicz, J., Lenstra, J.K. and Rinnooy Kan A.H.G. (1983). Scheduling projects to resource constraints: classification and complexity, Discrete Applied Mathematics. 5:11–24.CrossRefMathSciNetGoogle Scholar
  8. Boctor, F.F. (1990). Some efficient multi-heuristic procedures for resource-constrained project scheduling, European Journal of Operational Research 49:3–13.CrossRefGoogle Scholar
  9. Boctor, F.F. (1996). An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems, International Journal of Production Research. 34:2335–2351.Google Scholar
  10. Bouleimen, K. and Lecocq, H. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version, European Journal of Operational Research. 149:268–281.CrossRefMathSciNetGoogle Scholar
  11. Brucker, P., Knust, S., Schoo, A. and Thiele, O. (1998). A branch & bound algorithm for the resource-constrained project scheduling problem, European Journal of Operational Research 107(2):272–288.CrossRefGoogle Scholar
  12. Brucker, P., Drexl, A., Mohring, R., Neumann, K. and Pesch, E. (1999). Resource-constrained project scheduling: notation, classification, models, and methods, European Journal of Operational Research. 112(1):3–41.CrossRefGoogle Scholar
  13. Christofides, N., Alvarez-Valdes, R. and Tamarit, J.M. (1987). Project scheduling with resource constraints: a branch-and-bound approach, European Journal of Operational Research 29(2): 262–273.CrossRefMathSciNetGoogle Scholar
  14. Cho, J.H. and Kim, Y.D. (1997). A simulated annealing algorithm for resource-constrained project scheduling problems, Journal of the Operational Research Society. 48:736–744.CrossRefGoogle Scholar
  15. Coelho, J. and Tavares, L. (2003). Comparative analysis of meta-heuricstics for the resource constrained project scheduling problem, Technical report, Department of Civil Engineering, Instituto Superior Tecnico, Portugal.Google Scholar
  16. Cooper, D.F. (1976). Heuristics for scheduling resource-constrained projects: An experimental investigation, Management Science 22:1186–1194.Google Scholar
  17. Davis, E. W. and Heidorn, G.E. (1971). An algorithm for optimal project scheduling under multiple resource constraints, Management Science 17:803–816.Google Scholar
  18. Davis, E.W. and Patterson, J.H. (1975). A comparison of heuristic and optimum solutions in resource-constrained project scheduling, Management Science. 21:944–955.Google Scholar
  19. Debels, D., De Reyck, B., Leus, R. and Vanhoucke, M. (2006). A hybrid scatter search/electromagnetism meta-heuristic for project scheduling, European Journal of Operational Research 169(2):638–653.CrossRefMathSciNetGoogle Scholar
  20. Demeulemeester, E. and Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problems, Management Science. 38(12): 1803–1818.Google Scholar
  21. Demeulemeester, E. and Herroelen, W. (1997). New benchmark results for the resource-constrained project scheduling problem, Management Science 43(11): 1485–92.Google Scholar
  22. Dorndorf, U., Pesch, E. and Phan-Huy, T. (2000). A branch-and-bound algorithm for the resource-constrained project scheduling problem, Mathematical Methods of Operations Research, 52:413–439.CrossRefMathSciNetGoogle Scholar
  23. Drexl, A. (1991). Scheduling of project networks by job assignment, Management Science. 37:1590–1602.Google Scholar
  24. Foo, Y.P.S. and Takefuji, Y. (1988). Stochastic neural networks for solving job-shop scheduling, Proceedings of Joint International Conference on Neural Networks Vol. 2, pp. 275–290.Google Scholar
  25. Hartmann, S. (1998). A competitive genetic algorithm for the resource-constrained project scheduling, Naval Research Logistics, 45:733–750.CrossRefMathSciNetGoogle Scholar
  26. Hartmann, S. (2002). A self-adapting genetic algorithm for project scheduling under resource constraints, Naval Research Logistics. 49:433–448.CrossRefMathSciNetGoogle Scholar
  27. Hartmann, S. and Kolisch, R. (2000). Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem, European Journal of Operational Research 127:394–407.CrossRefGoogle Scholar
  28. Herroelen, W., Demeulemeester, E. and De Reyck, B. (1998). Resource-constrained project scheduling: A survey of recent developments, Computers & Operations Research 25(4):279–302.CrossRefMathSciNetGoogle Scholar
  29. Hindi, K. S., Yang H. and Fleszar, K. (2002). An evolutionary algorithm for resource-constrained project scheduling, IEEE Transactions on Evolutionary Computation. 6:512–518.CrossRefGoogle Scholar
  30. Hopfield, J.J. and Tank, D.W. (1985). Neural computation of decisions in optimization problems, Biological Cybernetics. 52:141–152.PubMedMathSciNetGoogle Scholar
  31. Icmeli, O., Erenguc, S.S. and Zappe, C.J. (1993). Project scheduling problems: A survey, International Journal of Operations & Production Management 13(11):80–91.CrossRefGoogle Scholar
  32. Kolisch, R. (1995). Project scheduling under resource constraints: efficient heuristics for several problem classes, Physica, Heidelberg, Germany.Google Scholar
  33. Kolisch, R. (1996a). Efficient priority rule for the resource-constrained project scheduling problem, Journal of Operations Management. 14(3): 179–192.CrossRefGoogle Scholar
  34. Kolisch, R. (1996b). Serial and parallel resource-constrained project scheduling methods revisited: theory and computation, European Journal of Operational Research 90:320–333.CrossRefGoogle Scholar
  35. Kolisch, R. and Drexl, A. (1996). Adaptive search for solving hard project scheduling problems, Naval Research Logistics. 43:23–40.CrossRefGoogle Scholar
  36. Kolisch, R. and Hartmann, S. (2005). Experimental investigation of heuristics for resource-constrained project scheduling: An update, European Journal of Operational Research, forthcoming.Google Scholar
  37. Kolisch, R. and Padman, R. (2001). An integrated survey of deterministic project scheduling, OMEGA. 29:249–272.CrossRefGoogle Scholar
  38. Kolisch R. and Sprecher, A. (1996). PSPLIB-A project scheduling problem library. European Journal of Operational Research, 96(1):205–216.CrossRefGoogle Scholar
  39. Kolisch, R., Sprecher, A. and Drexl, A. (1995). Characterisation and generation of a general class of resource-constrained project scheduling problem, Management Science, 41(10): 1693–1703.CrossRefGoogle Scholar
  40. Lee, J.K. and Kim, Y.D., 1996, Search heuristics for resource-constrained project scheduling, Journal of the Operational Research Society. 47:678–689.CrossRefGoogle Scholar
  41. Leon, V.J. and Ramamoorthy, B. (1995). Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling, OR Spektrum. 17:173–182.CrossRefGoogle Scholar
  42. Mingozzi, A., Maniezzo, V., Ricciardelli, S. and Bianco, L. (1998). An exact algorithm for project scheduling with resource constraints based on new mathematical formulation, Management Science, 44(5):714–29.Google Scholar
  43. Merkle, D., Middendorf, M. and Schmeck H. (2002). Ant colony optimization for resource-constrained project scheduling, IEEE Transactions on Evolutionary Computation. 6:333–346.CrossRefGoogle Scholar
  44. Nonobe, K. and Ibaraki, T. (2002). Formulation and tabu search algorithm for the resource constrained project scheduling problem, in: Essays and Surveys in Metaheuristics, C. C. Ribeiro and P. Hansen, eds, Kluwer Academic Publishers, pp. 557–588.Google Scholar
  45. Ozdamar, L. and Ulusoy, G., (1994). A local constraint based analysis approach to project scheduling under general resource constraints, European Journal of Operational Research. 79:287–298.CrossRefGoogle Scholar
  46. Ozdamar, L. and Ulusoy, G. (1995). A survey on the resource-constrained project scheduling problem, HE Transactions. 27:574–586.Google Scholar
  47. Patterson, J.H. and Huber, W.D. (1974). A horizon-varying, zero-one approach to project scheduling, Management Science 20:990–998.Google Scholar
  48. Patterson, J.H. and Roth, G.W., 1976, Scheduling a project under multiple resource constraints: a zero-one programming approach, AIIE Transactions. 8:449–55.Google Scholar
  49. Pinson, E., Prins, C. and Rullier, F. (1994). Using tabu search for solving the resource-constrained project scheduling problem, in: Proceedings of the 4th International Workshop on Project Management and Scheduling, Leuven, Belgium, pp. 102–106.Google Scholar
  50. Pritsker, A.A.B., Watters, L.J. and Wolfe, P.M. (1969). Multiproject scheduling with limited resources: a zero-one programming approach, Management Science 16: 93–107.Google Scholar
  51. Sabuncuoglu, I. and Gurgun, B. (1996). A neural network model for scheduling problems, European Journal of Operational Research 93:288–299.CrossRefGoogle Scholar
  52. Schirmer, A. and Riesenberg, S. (1998). Class-based control schemes for parameterized project scheduling heuristics, Manuskripte aus den Instituten für Betriebswirtschaftslehre 471, Universitat Kiel, Germany.Google Scholar
  53. Schirmer, A. (2000). Case-based reasoning and improved adaptive search for project scheduling, Naval Research Logistics. 47:201–222.CrossRefMathSciNetGoogle Scholar
  54. Talbot, F.B. and Patterson, J.H. (1978). An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems, Management Science, 24(11):1163–74.Google Scholar
  55. Thomas, P. R. and Salhi, S. (1998). A tabu search approach for the resource constrained project scheduling problem, Journal of Heuristics, 4:123–139.CrossRefGoogle Scholar
  56. Toklu, Y.C. (2002). Application of genetic algorithms to construction scheduling with or without resource constraints, Canadian Journal of Civil Engineering. 29:421–429.CrossRefGoogle Scholar
  57. Tormos, P. and Lova, A., 2001, A competitive heuristic solution technique for resource constrained project scheduling, Annals of Operations Research. 102:65–81.CrossRefMathSciNetGoogle Scholar
  58. Tormos, P. and Lova, A. (2003). An efficient multi-pass heuristic for project scheduling with constrained resources, International Journal of Production Research. 41(5): 1071–1086.CrossRefGoogle Scholar
  59. Ulusoy, G. and Ozdamar, L. (1989). Heuristic performance and network/ resource characteristics in resource-constrained project scheduling, Journal of the Operational Research Society. 40:1145–1152.CrossRefGoogle Scholar
  60. Valls, V., Ballestin, F. and Quintanilla, M. S. (2003). A hybrid genetic algorithm for the RCPSP, Technical report, Department of Statistics and Operations Research, University of Valencia.Google Scholar
  61. Valls, V., Ballestin, F. and Quintanilla M. S. (2005). Justification and RCPSP: A technique that pays, European Journal of Operational Research. 165(2):375–386.CrossRefMathSciNetGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC 2006

Authors and Affiliations

  • Selcuk Colak
    • 1
  • Anurag Agarwal
    • 1
  • Selcuk S. Erenguc
    • 1
  1. 1.Department of Decision and Information Sciences, Warrington College of Business AdministrationUniversity of FloridaGainesvilleUSA

Personalised recommendations