Abstract

Ethiopia has proposed different plans and conducted studies for dam projects on the Blue Nile, but the storage capacity required for such large dams is much higher than the capability of the Blue. Ethiopia unilaterally announced its plan to build the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at the very same location of the Border Dam. It increased the storage capacity from 11.1 to 74 billion cubic meter (BCM), which represents 1.5 times the annual flow of the Blue Nile at the Sudanese border and produces 6,450 MW of hydropower. The dam will have negative impacts on the downstream countries, especially shortage in water supply and hydropower generation during filling and operation.

The main purpose of this chapter is to develop a methodology using the GERD-AHD SIM model to determine the best operating policy for the Renaissance Dam on the Blue Nile that achieves minimum impact on the Aswan High Dam (AHD). The main objectives should be achieving a minimum water deficit in the downstream and a maximum power generation from both GERD and AHD.

The results of the model were tabulated and analyzed using the mentioned criteria to obtain the best long-term regulation policies for GERD. The main two factors that affect the management of AHD due to the regulation policy of GERD are the annual total water deficit downstream AHD and the generated energy from AHD. Those two evaluating factors were taken as the most critical criteria for arranging and choosing the best scenarios based on the results of the model.

Different scenarios were selected and tested. Each scenario has the following inputs: the initial levels of both GERD and AHD, the average AHD level, the average inflow to AHD, the annual evaporation of AHD and GERD, the energy produced from the two dams, the maximum water deficit downstream AHD, the number of water deficit downstream AHD, the number of shutdowns of AHD hydropower station, and the total water deficit.

It is clear that the cooperative management scenarios which preserve water storage in GERD for the need of the downstream countries represent the best regulation scenarios. Comparing cooperative and noncooperative scenarios shows this fact explicitly.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 229.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 299.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 449.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Deltares (2004) RIBASIM version 6.32. Deltares, Delft

    Google Scholar 

  2. USBR (United States Bureau of Reclamation) (1964) Land and water resources of the Blue Nile Basin in Ethiopia. United States Department of Interior Bureau of Reclamation, Washington

    Google Scholar 

  3. BCEOM (1999) Abay River Basin integrated development master plan project. Ministry of Water Resources of Ethiopia, Addis Ababa

    Google Scholar 

  4. Ethiopian Ministry of Water and Energy (2013) Water resources of Ethiopia. www.mowie.gov.et/

  5. MIT (2014) The Grand Ethiopian Renaissance Dam: an opportunity for collaboration and shared benefits in the Eastern Nile Basin: an amicus brief to the Riparian Nations of Ethiopia, Sudan and Egypt from the international, non-partisan Eastern Nile working group. Massachusetts Institute of Technology, Boston

    Google Scholar 

  6. Van der Krogt W, Ogink H (2013) Development of the Eastern Nile water simulation model (report no. 1206020-000-VEB-0010). Author Report to Nile Basin Initiative, Delft

    Google Scholar 

  7. Guariso G, Whittington D (1987) Implications of Ethiopian water development for Egypt and Sudan. Int J Water Resour Dev 3(2):105–114

    Article  Google Scholar 

  8. Yao H, Georgakakos AP (2003) The Nile decision support tool, river simulation and management (report no. GCP/INT/752/ITA). Georgia Institute of Technology, Atlanta

    Google Scholar 

  9. Ahmed A (2006) Multipurpose development of the Eastern Nile. One system inventory, ENTRO Report, Sudan

    Google Scholar 

  10. ENTRO (2006) Water atlas of the Blue Nile subbasin.

    Google Scholar 

  11. EDF, Wilson S (2007) Border multipurpose project pre-feasibility study. ENTRO, Addis Ababa

    Google Scholar 

  12. Georgia Water Research Institute (2007) Nile decision support tool. FAO, Atlanta

    Google Scholar 

  13. Blackmore D, Whittington D (2008) Opportunities for cooperative water resources development on the eastern Nile: risks and rewards, final report – an independent report of the Scoping Study Team to the Eastern Nile Council of Ministers. World Bank, Washington

    Google Scholar 

  14. Block PJ, Strzepek K (2010) Economic analysis of large-scale upstream river basin development on the Blue Nile in Ethiopia considering transient conditions, climate variability, and climate change. J Water Resour Plann Manage 136(2):156–166

    Article  Google Scholar 

  15. McCartney MP, Girma MM (2012) Evaluating the downstream implications of planned water resource development in the Ethiopian portion of the Blue Nile River. Water Int 37(4):362–379

    Article  Google Scholar 

  16. Arjoon D, Mohamed Y, Goor Q, Tilmant A (2014) Hydro-economic risk assessment in the Eastern Nile River basin. Water Resour Econ 8:16–31

    Article  Google Scholar 

  17. Bates A, Tuncok K, Barbour T, Klimpt JÉ (2013) First joint multipurpose program identification: strategic perspectives and options assessment on the Blue Nile multipurpose development – working paper 2. Author Report to Nile Basin Initiative, Addis Ababa

    Google Scholar 

  18. Wheeler KG, Tesfaye Z, Mersha A, Ibrahim Y (2013) Reservoir filling option using RiverWare Model. In: New Nile perspectives conference, Sudan

    Google Scholar 

  19. Wheeler KG, Basheer M, Mekonnen ZT, Eltoum SO, Mersha A, Abdo GM, Zagona EA, Hall JW, Dadson SJ (2016) Cooperative filling approaches for the Grand Ethiopian Renaissance Dam. Water Int 41(4):611–624

    Article  Google Scholar 

  20. Sileet TM, El Shamy M, Abdel Aty M, Sharaky AM (2013) The development of the Baro-Akobo-Sobat sub basin and its impact on downstream Nile Basin countries. Nile Water Sci Eng J 6(2):38–53

    Google Scholar 

  21. Sileet TM, El Shamy M, Sharaky AM (2014) Downstream impact of blue development. Nile Water Sci Eng J 7(1):16–33

    Google Scholar 

  22. King A, Block P (2014) An assessment of reservoir filling policies for the Grand Ethiopian Renaissance Dam. J Water Clim Chang 5(2):233–243

    Article  Google Scholar 

  23. Mulat AG, Moges SA (2014) Assessment of the impact of the Grand Ethiopian Renaissance Dam on the performance of the Aswan High Dam. J Water Resour Prot 6(6):583–598

    Article  Google Scholar 

  24. Zhang Y, Block P, Hammond M, King A (2015) Ethiopia’s Grand Renaissance Dam: implications for downstream riparian countries. J Water Resour Plan Manag 141:05015002

    Article  Google Scholar 

  25. Georgakakos AP, Yao H (2013) Assessment of the impact of the Grand Ethiopian Renaissance Dam on Egypt. WREM International, Cairo

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Abbas M. Sharaky .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Springer International Publishing AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Sharaky, A.M., Hamed, K.H., Mohamed, A.B. (2017). Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River. In: Negm, A., Abdel-Fattah, S. (eds) Grand Ethiopian Renaissance Dam Versus Aswan High Dam. The Handbook of Environmental Chemistry, vol 79. Springer, Cham. https://doi.org/10.1007/698_2017_188

Download citation

Publish with us

Policies and ethics