Abstract
Ethiopia has proposed different plans and conducted studies for dam projects on the Blue Nile, but the storage capacity required for such large dams is much higher than the capability of the Blue. Ethiopia unilaterally announced its plan to build the Grand Ethiopian Renaissance Dam (GERD) on the Blue Nile at the very same location of the Border Dam. It increased the storage capacity from 11.1 to 74 billion cubic meter (BCM), which represents 1.5 times the annual flow of the Blue Nile at the Sudanese border and produces 6,450 MW of hydropower. The dam will have negative impacts on the downstream countries, especially shortage in water supply and hydropower generation during filling and operation.
The main purpose of this chapter is to develop a methodology using the GERD-AHD SIM model to determine the best operating policy for the Renaissance Dam on the Blue Nile that achieves minimum impact on the Aswan High Dam (AHD). The main objectives should be achieving a minimum water deficit in the downstream and a maximum power generation from both GERD and AHD.
The results of the model were tabulated and analyzed using the mentioned criteria to obtain the best long-term regulation policies for GERD. The main two factors that affect the management of AHD due to the regulation policy of GERD are the annual total water deficit downstream AHD and the generated energy from AHD. Those two evaluating factors were taken as the most critical criteria for arranging and choosing the best scenarios based on the results of the model.
Different scenarios were selected and tested. Each scenario has the following inputs: the initial levels of both GERD and AHD, the average AHD level, the average inflow to AHD, the annual evaporation of AHD and GERD, the energy produced from the two dams, the maximum water deficit downstream AHD, the number of water deficit downstream AHD, the number of shutdowns of AHD hydropower station, and the total water deficit.
It is clear that the cooperative management scenarios which preserve water storage in GERD for the need of the downstream countries represent the best regulation scenarios. Comparing cooperative and noncooperative scenarios shows this fact explicitly.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Deltares (2004) RIBASIM version 6.32. Deltares, Delft
USBR (United States Bureau of Reclamation) (1964) Land and water resources of the Blue Nile Basin in Ethiopia. United States Department of Interior Bureau of Reclamation, Washington
BCEOM (1999) Abay River Basin integrated development master plan project. Ministry of Water Resources of Ethiopia, Addis Ababa
Ethiopian Ministry of Water and Energy (2013) Water resources of Ethiopia. www.mowie.gov.et/
MIT (2014) The Grand Ethiopian Renaissance Dam: an opportunity for collaboration and shared benefits in the Eastern Nile Basin: an amicus brief to the Riparian Nations of Ethiopia, Sudan and Egypt from the international, non-partisan Eastern Nile working group. Massachusetts Institute of Technology, Boston
Van der Krogt W, Ogink H (2013) Development of the Eastern Nile water simulation model (report no. 1206020-000-VEB-0010). Author Report to Nile Basin Initiative, Delft
Guariso G, Whittington D (1987) Implications of Ethiopian water development for Egypt and Sudan. Int J Water Resour Dev 3(2):105–114
Yao H, Georgakakos AP (2003) The Nile decision support tool, river simulation and management (report no. GCP/INT/752/ITA). Georgia Institute of Technology, Atlanta
Ahmed A (2006) Multipurpose development of the Eastern Nile. One system inventory, ENTRO Report, Sudan
ENTRO (2006) Water atlas of the Blue Nile subbasin.
EDF, Wilson S (2007) Border multipurpose project pre-feasibility study. ENTRO, Addis Ababa
Georgia Water Research Institute (2007) Nile decision support tool. FAO, Atlanta
Blackmore D, Whittington D (2008) Opportunities for cooperative water resources development on the eastern Nile: risks and rewards, final report – an independent report of the Scoping Study Team to the Eastern Nile Council of Ministers. World Bank, Washington
Block PJ, Strzepek K (2010) Economic analysis of large-scale upstream river basin development on the Blue Nile in Ethiopia considering transient conditions, climate variability, and climate change. J Water Resour Plann Manage 136(2):156–166
McCartney MP, Girma MM (2012) Evaluating the downstream implications of planned water resource development in the Ethiopian portion of the Blue Nile River. Water Int 37(4):362–379
Arjoon D, Mohamed Y, Goor Q, Tilmant A (2014) Hydro-economic risk assessment in the Eastern Nile River basin. Water Resour Econ 8:16–31
Bates A, Tuncok K, Barbour T, Klimpt JÉ (2013) First joint multipurpose program identification: strategic perspectives and options assessment on the Blue Nile multipurpose development – working paper 2. Author Report to Nile Basin Initiative, Addis Ababa
Wheeler KG, Tesfaye Z, Mersha A, Ibrahim Y (2013) Reservoir filling option using RiverWare Model. In: New Nile perspectives conference, Sudan
Wheeler KG, Basheer M, Mekonnen ZT, Eltoum SO, Mersha A, Abdo GM, Zagona EA, Hall JW, Dadson SJ (2016) Cooperative filling approaches for the Grand Ethiopian Renaissance Dam. Water Int 41(4):611–624
Sileet TM, El Shamy M, Abdel Aty M, Sharaky AM (2013) The development of the Baro-Akobo-Sobat sub basin and its impact on downstream Nile Basin countries. Nile Water Sci Eng J 6(2):38–53
Sileet TM, El Shamy M, Sharaky AM (2014) Downstream impact of blue development. Nile Water Sci Eng J 7(1):16–33
King A, Block P (2014) An assessment of reservoir filling policies for the Grand Ethiopian Renaissance Dam. J Water Clim Chang 5(2):233–243
Mulat AG, Moges SA (2014) Assessment of the impact of the Grand Ethiopian Renaissance Dam on the performance of the Aswan High Dam. J Water Resour Prot 6(6):583–598
Zhang Y, Block P, Hammond M, King A (2015) Ethiopia’s Grand Renaissance Dam: implications for downstream riparian countries. J Water Resour Plan Manag 141:05015002
Georgakakos AP, Yao H (2013) Assessment of the impact of the Grand Ethiopian Renaissance Dam on Egypt. WREM International, Cairo
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this chapter
Cite this chapter
Sharaky, A.M., Hamed, K.H., Mohamed, A.B. (2017). Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River. In: Negm, A., Abdel-Fattah, S. (eds) Grand Ethiopian Renaissance Dam Versus Aswan High Dam. The Handbook of Environmental Chemistry, vol 79. Springer, Cham. https://doi.org/10.1007/698_2017_188
Download citation
DOI: https://doi.org/10.1007/698_2017_188
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-95599-5
Online ISBN: 978-3-319-95600-8
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)