Skip to main content

Ablaufplanung in flexiblen Produktionslinien

  • Chapter
Quantitative Unternehmensführung
  • 1079 Accesses

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 99.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 99.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literatur

  • Crama Y, Kats V, van de Klundert J, Levner E (2000) Cyclic Scheduling in Robotic Flow-shops. Annals of Operations Research 96: 97–1004

    Article  MathSciNet  Google Scholar 

  • Giffler B, Thompson G (1960) Algorithms for Solving Production Scheduling Problems. Operations Research 8: 487–503

    Article  MathSciNet  Google Scholar 

  • Grubbs CA (2002) Surface Treatments — Anodising of Aluminium. Metal Finishing 100: 463–478

    Article  Google Scholar 

  • Lei L, Wang T (1989) Proof: the Cyclic HSP is NP-complete. Technical Report, Rutgers University

    Google Scholar 

  • Lei L, Liu Q (2002) Optimal Cyclic Scheduling of a Robotic Processing Line with two Products and Time-window Constraints. Information Systems and Operational Research 39: 807–816

    Google Scholar 

  • Paul H, Bierwirth C, Kopfer H (2001) Layout Simulation einer Aluminium Galvanik für eine Logistikkette in der Flugzeugindustrie. In: Sebastian HJ, Grünert T (Hrsg) Logistik Management, Stuttgart: 353–364

    Google Scholar 

  • Paul H, Bierwirth C, Kopfer H (2004) A heuristic scheduling procedure for multi-item hoist production lines. Working paper, University of Bremen

    Google Scholar 

  • Phillips L, Unger P (1976) Mathematical Programming Solution for a Hoist Scheduling Program. AIIE Transactions 8: 219–225

    Google Scholar 

  • Shapiro GW, Nuttle HL (1988) Hoist scheduling for PCB electroplating. IIE Transactions 20: 157–167

    Google Scholar 

  • Song W, Zabinsky Z, Storch R (1993) An Algorithm for Scheduling a Chemical Processing Line. Production Planning and Control 4: 323–332

    Google Scholar 

  • Yih Y (1994) An Algorithm for Hoist Scheduling Problems. International Journal of Production Research 32: 501–516

    MATH  Google Scholar 

  • Yin N-C, Yih Y (1992) Crane Scheduling in a Flexible Alectroplating Line: A Tolerance Based Approach. Journal of Electronics Manufacturing 2: 137–144

    Article  CAS  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2005 Physica-Verlag Heidelberg

About this chapter

Cite this chapter

Bierwirth, C. (2005). Ablaufplanung in flexiblen Produktionslinien. In: Steven, M., Sonntag, S. (eds) Quantitative Unternehmensführung. Physica-Verlag HD. https://doi.org/10.1007/3-7908-1602-7_12

Download citation

Publish with us

Policies and ethics