Skip to main content

Constraint based reactive rescheduling in a stochastic environment

  • Conference paper
  • First Online:

Part of the book series: Lecture Notes in Computer Science ((LNAI,volume 1348))

Abstract

The problem of scheduling manufacturing systems where the capacity of a production resource is subject to stochastic change, is the subject of this paper. Resources which are dependent upon labour intensive processes provide typical examples. In the United Kingdom the manufacture of clothing garments is still dominated by the progressive bundle system. Garments are produced on a continuous-flow production line in which garment pieces are passed in succession through a network of workstations where skilled manual workers complete operations on garments using sewing machines. These production systems are subject to numerous perturbations caused by operator absenteeism and machine breakdown necessitating the need for reactive rescheduling to maintain line balance. In the approach described here, line balance is maintained via periodic schedule repair, based upon reassignment heuristics, supported by partial order backtracking.

This is a preview of subscription content, log in via an institution.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Chuter, A.J.: An Introduction to Clothing Production Management, BSP Professional Books, Oxford, 1988.

    Google Scholar 

  2. French, S.: Sequencing and Scheduling, An introduction to the mathematics of the Job-Shop, Ellis Horwood Limited 1990.

    Google Scholar 

  3. Tyler, D., Tennent, L.F., and Lowe, T.J.: Simulation as a Training Medium for Industrial Supervisors, Journal of Clothing Technology and Management, (1994) 11(2), 31–44.

    Google Scholar 

  4. Smith, B.M.: Filling the Gaps: Reassignment Heuristics for Constraint Satisfaction Problems, Report 92.29, School of Computer Studies, University of Leeds, November 1992.

    Google Scholar 

  5. Spragg, J.E. and Kelleher, G.: A Discipline for Reactive Rescheduling, Proceedings of the 3rd International Conference on Artificial Intelligence Planning Systems, Edited Brian Drabble, The AAAI Press, (1996) 199–204.

    Google Scholar 

  6. Ginsberg, M.L. and McAllester, D.A.: GSAT and Dynamic Backtracking, Knowledge Representation and Reasoning Conference, 1994.

    Google Scholar 

  7. Selman, B., Levesque, H., and Mitchell, D.: A New Method for Solving Hard Satisfiability Problems, In Proceedings of the Tenth National Conference on Artificial Intelligence (1992) 440–446.

    Google Scholar 

  8. Minton, S., Johnston, M.D., Philips, A.B., and Laird, P.: Solving Large-Scale Constraint Satisfaction and Scheduling Problems Using a Heuristic Repair Method, In Proceedings of the Eighth National Conference on Artificial Intelligence (1990) 17–24.

    Google Scholar 

  9. Spragg, J.E., Tyler, D. and Fozzard, G.: FLEAS: flow line environment for automated supervision of simulated clothing manufacture. (forthcoming).

    Google Scholar 

  10. Smith, S.: Reactive Scheduling Systems, In Intelligent Scheduling Systems, (eds. D.E. Brown and W.T. Scherer), Kluwer Academic Publishers, Boston (1995) 155–192.

    Google Scholar 

  11. Fozzard, G., Spragg, J.E. and Tyler, D.: Simulation of Flow Lines in Clothing Manufacture, Part 1: model construction, International Journal of Clothing Science and Technology, Vol 8, No. 4, (1996) 17–27.

    Google Scholar 

  12. Fozzard, G., Spragg, J.E. and Tyler, D.: Simulation of Flow Lines in Clothing Manufacture, Part 2: credibility issues and experimentation, International Journal of Clothing Science and Technology, Vol 8, No. 5 (1996) 42–50.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Sam Steel Rachid Alami

Rights and permissions

Reprints and permissions

Copyright information

© 1997 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Spragg, J.E., Fozzard, G., Tyler, D.J. (1997). Constraint based reactive rescheduling in a stochastic environment. In: Steel, S., Alami, R. (eds) Recent Advances in AI Planning. ECP 1997. Lecture Notes in Computer Science, vol 1348. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-63912-8_102

Download citation

  • DOI: https://doi.org/10.1007/3-540-63912-8_102

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-63912-1

  • Online ISBN: 978-3-540-69665-0

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics