Skip to main content

Scheduling Models

  • Chapter
Book cover Complex Scheduling

Part of the book series: GOR ■ Publications ((GOR))

  • 860 Accesses

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 99.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Reference Notes

  1. Błlazewicz, J., Ecker, K., Pesch, E., Schmidt, G., Weglarz, J. (2001): Scheduling Computer and Manufacturing Processes, 2nd ed., Springer, Ber

    Google Scholar 

  2. Böttcher, J., Drexl, A., Kolisch, R., Salewski, F. (1999): Project scheduling under partially renewable resource constraints, Management Science 45, 543–559.

    Google Scholar 

  3. Brucker, P. (2004): Scheduling Algorithms, 4th ed., Springer, Berlin.

    Google Scholar 

  4. Brucker, P., Drexl, A., Möhring, R.H., Neumann, K., Pesch, E. (1999): Resource-constrained project scheduling: notation, classification, models and methods, European Journal of Operational Research 112, 3–14.

    Article  Google Scholar 

  5. Brucker, P., Knust, S. (2001): Resource-constrained project scheduling and timetabling, in: E. Burke, W. Erben (ed.): The Practice and Theory of Automated Timetabling III, Springer Lecture Notes in Computer Science 2079, 277–293.

    Google Scholar 

  6. Brucker, P., Schumacher, D. (1999): A new tabu search procedure for an audit-scheduling problem, Journal of Scheduling 2, 157–173.

    Article  MathSciNet  Google Scholar 

  7. Demeulemeester, E., Herroelen, W. (2002): Project Scheduling, A Research Handbook, Kluwer, Dordrecht.

    Google Scholar 

  8. Dodin, B., Elimam, A.A., Rolland, E. (1998): Tabu search in audit scheduling, European Journal of Operational Research 106, 373–392.

    Article  Google Scholar 

  9. Drexl, A., Knust, S. (2004): Sports league scheduling: graph-and resource-based models, Osnabrücker Schriften zur Mathematik, No. 255, to appear in OMEGA — The International Journal of Management Science.

    Google Scholar 

  10. Hartmann, S. (2000): Packing problems and project scheduling models: an integrating perspective, Journal of the Operational Research Society 51, 1083–1092.

    Article  MATH  Google Scholar 

  11. Herroelen, W., Demeulemeester, E., De Reyck, B. (1998): Resource-constrained project scheduling — A survey of recent developments, Computers & Operations Research 25, 279–302.

    Article  MathSciNet  Google Scholar 

  12. Kolisch, R., Padman, R. (2001): An integrated survey of deterministic project scheduling, OMEGA — International Journal of Management Science 29, 249–272.

    Google Scholar 

  13. Leung, J.T. (2004): Handbook of Scheduling, CRC Press.

    Google Scholar 

  14. Neumann, K., Schwindt, C., Zimmermann, J. (2003): Project Scheduling with Time Windows and Scarce Resources — Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions, Springer, Berlin.

    Google Scholar 

  15. Özdamar, L., Ulusoy, G. (1995): A survey on the resource-constrained project scheduling problem, IIE Transactions 27, 574–586.

    Google Scholar 

  16. Pinedo, M. (2001): Scheduling: Theory, Algorithms, and Systems, 2nd ed., Prentice Hall.

    Google Scholar 

  17. Pinedo, M. (2005): Planning and Scheduling in Manufacturing and Services, Springer, Berlin.

    Google Scholar 

  18. Schaerf, A. (1995): A survey of automated timetabling, CWI-Report CS-R 9567, Amsterdam.

    Google Scholar 

  19. Schirmer, A., Drexl, A. (2001): Allocation of partially renewable resources: Concept, capabilities, and applications, Networks 37, 21–34.

    Article  MathSciNet  Google Scholar 

  20. Weglarz, J. (1998): Project Scheduling: Recent Models, Algorithms and Applications, Kluwer, Dordrecht.

    Google Scholar 

Download references

Rights and permissions

Reprints and permissions

Copyright information

© 2006 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

(2006). Scheduling Models. In: Complex Scheduling. GOR ■ Publications. Springer, Berlin, Heidelberg. https://doi.org/10.1007/3-540-29546-1_1

Download citation

Publish with us

Policies and ethics