Abstract
Eight years ago, Siemens Transportation Systems accomplished the first successful application of the B Method on an industrial project. The vital software of the METEOR automatic train control system, with very strong dependability and safety needs, was specified and coded in B. Beyond the technological challenge of using such a complex formal method in an industrial context, it is now clear for us that building software using B is not more expensive than using conventional methods. Better, due to our experience in using this method, we can assert that using B is cheaper when considering the whole development process (from specification to validation and sometimes certification). Since METEOR, Siemens Transportation Systems has generalized the use of B for building all vital software of its systems in particular its Communication Based Train Control Systems (CBTC) recently enacted on the New York City Canarsie Line. This short paper shares the Canarsie line experience in the B landscape.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2006 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Essamé, D., Dollé, D. (2006). B in Large-Scale Projects: The Canarsie Line CBTC Experience. In: Julliand, J., Kouchnarenko, O. (eds) B 2007: Formal Specification and Development in B. B 2007. Lecture Notes in Computer Science, vol 4355. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11955757_21
Download citation
DOI: https://doi.org/10.1007/11955757_21
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-68760-3
Online ISBN: 978-3-540-68761-0
eBook Packages: Computer ScienceComputer Science (R0)