Abstract
In this paper, metaheuristic approaches for the weighted late work minimization in the two-machine flow shop problem with a common due date (F2 | d j =d | Y w ) are presented. The late work performance measure estimates the quality of a solution with regard to the duration of the late parts of jobs not taking into account the quantity of the delay for the fully late activities. Since, the problem mentioned is known to be NP-hard, three trajectory based methods, namely simulated annealing, tabu search and variable neighborhood search were designed and compared to an exact approach and a list scheduling algorithm.
Keywords
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Barr, R.S., Golden, B.L., Kelly, J.P., Resende, M.G.C., Stewart Jr., W.R.: Designing and Reporting on Computational Experiments with Heuristic Methods. Journal of Heuristics 1, 9–32 (1995)
Blazewicz, J.: Scheduling Preemptible Tasks on Parallel Processors with Information Loss. Recherche Technique et Science Informatiques 3/6, 415–420 (1984)
Blazewicz, J., Ecker, K., Pesch, E., Schmidt, G., Weglarz, J.: Scheduling Computer and Manufacturing Processes, 2nd edn. Springer, Berlin (2001)
Blazewicz, J., Finke, G.: Minimizing Mean Weighted Execution Time Loss on Identical and Uniform Processors. Information Processing Letters 24, 259–263 (1987)
Blazewicz, J., Pesch, E., Sterna, M., Werner, F.: Revenue Management in a Job-shop: a Dynamic Programming Approach. Preprint Nr. 40/03. Otto-von-Guericke-University, Magdeburg (2003)
Blazewicz, J., Pesch, E., Sterna, M., Werner, F.: Open Shop Scheduling Problems with Late Work Criteria. Discrete Applied Mathematics 134, 1–24 (2004)
Blazewicz, J., Pesch, E., Sterna, M., Werner, F.: The Two-Machine Flow-Shop Problem with Weighted Late Work Criterion and Common Due Date. European Journal of Operational Research 165/2, 408–415 (2005)
Błażewicz, J., Pesch, E., Sterna, M., Werner, F.: Flow Shop Scheduling with Late Work Criterion – Choosing the Best Solution Strategy. In: Manandhar, S., Austin, J., Desai, U., Oyanagi, Y., Talukder, A.K. (eds.) AACC 2004. LNCS, vol. 3285, pp. 68–75. Springer, Heidelberg (2004)
Blum, C., Roli, A.: Metaheuristics in Combinatorial Optimization: Overview and Conceptual Comparison. ACM Computing Surveys 35/3, 268–308 (2003)
Brucker, P.: Scheduling Algorithms, 2nd edn. Springer, Berlin (1998)
Crama, Y., Kolen, A., Pesch, E.: Local Search in Combinatorial Optimization. In: Braspenning, P.J., Weijters, A.J.M.M.T., Thuijsman, F. (eds.) Neural Network School 1999. LNCS, vol. 931, pp. 157–174. Springer, Heidelberg (1995)
Dorndorf, U., Pesch, E.: Variable Depth Search and Embedded Schedule Neighbourhoods for Job Shop Scheduling. In: Proceedings of the 4th International Workshop on Project Management and Scheduling, pp. 232–235 (1994)
Garey, M.R., Johnson, D.S.: Computers and Intractability. W.H. Freeman and Co., San Francisco (1979)
Glover, F., Laguna, M.: Tabu Search. Kluwer Academic Publishers, Boston (1997)
Hansen, P., Mladenović, N.: Variable Neighbour Search. Principles and Applications. European Journal of Operational Research 130, 449–467 (2001)
Haupt, R.: A Survey of Priority Rule–Based Scheduling. OR Spektrum 11, 3–16 (1989)
Hooker, J.N.: Testing Heuristics: We Have It All Wrong. Journal of Heuristics 1, 33–42 (1995)
Kirkpatrick, S., Gelatt, C.D., Vecchi, M.P.: Optimization by Simulated Annealing. Science 220/4598, 671–680 (1983)
Johnson, S.M.: Optimal Two- and Three-Stage Production Schedules. Naval Research Logistics Quarterly 1, 61–68 (1954)
Leung, J.Y.T.: Minimizing Total Weighted Error for Imprecise Computation Tasks and Related Problems. In: Leung, J.Y.T. (ed.) Handbook of Scheduling: Algorithms, Models, and Performance Analysis, ch. 34, pp. 1–16. CRC Press, Boca Raton (2004)
Pesch, E., Glover, F.: TSP Ejection Chains. Discrete Applied Mathematics 76, 165–181 (1997)
Pinedo, M., Chao, X.: Operation Scheduling with Applications in Manufacturing and Services. Irwin/McGraw-Hill, Boston (1999)
Potts, C.N., Van Wassenhove, L.N.: Single Machine Scheduling to Minimize Total Late Work. Operations Research 40/3, 586–595 (1991)
Potts, C.N., Van Wassenhove, L.N.: Approximation Algorithms for Scheduling a Single Machine to Minimize Total Late Work. Operations Research Letters 11, 261–266 (1991)
Sterna, M.: Problems and Algorithms in Non-Classical Shop Scheduling. Scientific Publishers of the Polish Academy of Sciences, Poznan (2000)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2005 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Blazewicz, J., Pesch, E., Sterna, M., Werner, F. (2005). Metaheuristics for Late Work Minimization in Two-Machine Flow Shop with Common Due Date. In: Furbach, U. (eds) KI 2005: Advances in Artificial Intelligence. KI 2005. Lecture Notes in Computer Science(), vol 3698. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11551263_19
Download citation
DOI: https://doi.org/10.1007/11551263_19
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-28761-2
Online ISBN: 978-3-540-31818-7
eBook Packages: Computer ScienceComputer Science (R0)