Investigation of the Earned Value Method (EVM) Applicability for Construction Operations Affected by the Learning Phenomenon

  • Christos Stasinos
  • Antonios Panas
  • John-Paris Pantouvakis
  • Panagiota Ralli
  • Dimitrios KaragiannakidisEmail author
Conference paper
  • 61 Downloads
Part of the Lecture Notes in Mechanical Engineering book series (LNME)

Abstract

The Earned Value Method (EVM) has been extensively applied for the analysis of construction projects. However, in cases where the productivity is not constant, but rather varies due to accelerations attributed to the learning phenomenon, it is challenging to assess the implications on productivity estimation and forecasting. In that sense, such an investigation is crucial for the scheduling and coordination of the remaining works in a realistic manner. The purpose of this paper is to compare the progress reporting results using the Earned Value method both for the theoretical project time schedule (without learning) and the actual on-site scheduling following the learning curve. A real, large-scale infrastructure project is used as a case study. The research method involved the “transformation” of productivity data to cost data, with the purpose of quantifying the productivity improvements through the use of statistical learning models. The straight-line model was used, due to its wide acceptance in related studies. An algorithmic approach is developed and assessed via, inter alia, the Schedule Variance (SV) and the Cost Variance (CV) indices. The results of the research indicate that EVM is significantly affected by the learning phenomenon, which, if neglected, leads to ineffective decision making procedures, regarding the deployment of project resources.

Keywords

Earned Value Method Construction productivity Estimation Learning curves 

References

  1. Afshari H, Jaber MY, Searcy C (2019) Investigating the effects of learning and forgetting on the feasibility of adopting additive manufacturing in supply chains. Comput Ind Eng 128:576–590CrossRefGoogle Scholar
  2. Anbari FT (2003) Earned value project management method and extension. Project Manag J 34(4):12–23CrossRefGoogle Scholar
  3. Czarnigowska A (2008) Earned value method as a tool for project control. Budownictwo i Architektura 3:15–32Google Scholar
  4. Everett JG, Farghal S (1994) Learning curve predictors for construction field operations. J Constr Eng Manag 120(3):603–616CrossRefGoogle Scholar
  5. Lee B, Lee H, Park M, Kim H (2015) Influence factors of learning-curve effect in high-rise building constructions. J Constr Eng Manag 141(8):04015019CrossRefGoogle Scholar
  6. Olawale Y, Sun M (2015) Construction project control in the UK: current practice, existing problems and recommendations for future improvement. Int J Project Manage 33(3):623–637CrossRefGoogle Scholar
  7. Panas A, Pantouvakis JP (2010) Evaluating research methodology in construction productivity studies. Built Human Environ Rev 3(1):63–85Google Scholar
  8. Panas A, Pantouvakis JP (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. J Constr Eng Manag 140(1):04013033CrossRefGoogle Scholar
  9. Panas A, Pantouvakis JP (2018) On the use of learning curves for the estimation of construction productivity. Int J Constr Manag.  https://doi.org/10.1080/15623599.2017.1326302CrossRefGoogle Scholar
  10. Pantouvakis JP, Panas A (2013) Computer simulation and analysis framework for floating caisson construction operations. Autom Constr 36:196–207CrossRefGoogle Scholar
  11. Pellegrino R, Costantino N (2018) An empirical investigation of the learning effect in concrete operations. Eng, Constr Archit Manag 25(3):342–357CrossRefGoogle Scholar
  12. Plaza M, Turetken O (2009) A model-based DSS for integrating the impact of learning in project control. Decis Support Syst 47(4):488–499CrossRefGoogle Scholar
  13. Thomas HR (2009) Construction learning curves. Pract Period Struct Des Constr 14(1):14–20CrossRefGoogle Scholar
  14. Thomas HR, Mathews CT, Ward JG (1986) Learning curve models of construction productivity. J Constr Eng Manag 112(2):245–259CrossRefGoogle Scholar
  15. Zayed T, Sharifi MR, Baciu S, Amer M (2008) Slip-form application to concrete structures. J Constr Eng Manag 134:157–168CrossRefGoogle Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2020

Authors and Affiliations

  • Christos Stasinos
    • 1
  • Antonios Panas
    • 2
  • John-Paris Pantouvakis
    • 2
  • Panagiota Ralli
    • 3
  • Dimitrios Karagiannakidis
    • 4
    Email author
  1. 1.Civil Engineer, M.Sc., Democritus University of ThraceTILEKPAIDEYSI S.A.—Engineering-webinars.comIlion, AthensGreece
  2. 2.Centre for Construction InnovationNational Technical University of AthensZografou, AthensGreece
  3. 3.Mechanical Engineer M.Sc., Hellenic Open University, Department of Projects Contracts and ProcurementBuilding Infrastructures S.AGalatsi, AthensGreece
  4. 4.Civil Engineer, M.Sc.Aristotle University of ThessalonikiGalatsi, AthensGreece

Personalised recommendations