Advertisement

Challenges in Implementation of Safety Practices for Building Implosion Technique in India

  • Asifali KhanEmail author
  • Herrick Prem
  • Siddesh Pai
Conference paper
  • 36 Downloads
Part of the Advances in Intelligent Systems and Computing book series (AISC, volume 1077)

Abstract

In the controlled demolition industry, building implosion is the strategic placing of explosive material and timing of its detonation so that a structure collapses on itself in a matter of seconds, minimizing the physical damage to its immediate surroundings. Despite its terminology, building implosion also includes the controlled demolition of other structures, such as bridges, smokestacks, towers, and tunnels. Every structure/building after its useful life needs to be taken care of as it poses a threat to the adjacent structures, and as the purpose of the building is fulfilled the structure should be demolished to construct a new structure. The techniques of selective demolition aim to maximize the recovery of reusable and recyclable building materials; however, a being labor-intensive and dilatory process it is mostly adopted in the Indian industry, as the building demolition activity is very complicated and involves high risk in terms of safety and cost. A minute deviation with respect to the timing of successive detonators, placement of detonators, and miscommunication can cause the demolition process to go for a toss. This paper deals with the various challenges faced by the major demolition techniques in India. The study also includes the precautionary measures regarding machinery or equipment, scaffolding, public safety, and worker safety. Various strategies for the demolition of waste have been reported in literature for implementing good practices for demolition of buildings.

Keywords

Controlled demolition Building implosion Safety issues 

References

  1. 1.
    Arie, G.: Health and Safety in Refurbishment Involving Demolition and Structural Instability (2004)Google Scholar
  2. 2.
    Buildings Department: Code of practice for demolition of buildings. Government Logistics Department (2004)Google Scholar
  3. 3.
    Anumba, C.J., Abdullah, A., Ruikar, K.: An integrated system for demolition techniques selection. Arch. Eng. Des. Manag. 130–148Google Scholar
  4. 4.
    Recommended management practices for the removal of hazardous materials from buildings prior to demolition. Department of Environmental Engineering Sciences, Grainesville, Florida (2004)Google Scholar
  5. 5.
    Diven, R.J., Shaurette, M.: Demolition: Practices, Technology, and ManagementGoogle Scholar
  6. 6.
    Dorevitch, S., Demirtas, H., Perksy, V.W., Erdal, S., Conroy, L., Schoonover, T., et al.: Demolition of high-rise public housing increases particulate matter air pollution in communities of high-risk asthmatics. J. Air Waste Manag. Assoc. 56(7), 1022–1032 (2006)CrossRefGoogle Scholar
  7. 7.
    Fauzey, I.H., Nateghi, F., Mohammadi, F., Ismail, F.: Emergent occupational safety & health and environmental issues of demolition work: towards public environment. Proc. Soc. Behav. Sci. 168, 41–51 (2015)CrossRefGoogle Scholar
  8. 8.
    Hecker, S., Gambatese, J., Weinstein, M.: Designing for worker safety. Prof. Saf. (n.d.)Google Scholar
  9. 9.
    Hon, K.H.: Relationships between safety climate and safety performance of repair, maintenance, minor alteration and addition (RMAA) works. Ph.D. dissertation, The Hong Kong Polytechnic University (2012)Google Scholar
  10. 10.
    Patel, R.: Demolination method & techniques. Int. J. Res. Sci. Eng. Manag. (n.d.)Google Scholar
  11. 11.
    Pranav, P., Pitroda, J., Bhavsar, J.J.: Demolition: methods and comparision. Engineering: Issues, Opportunities and Challenges for Development. Umrakh, Bardoli (n.d.)Google Scholar
  12. 12.
    Rathi, S.O., Khandve, P.: Demolition of buildings—an overview. Int. J. Adv. Eng. Res. Dev. (IJAERD) 1(6) (2014)Google Scholar
  13. 13.
    Shaurette, M.: Safety and health training for demolition and reconstruction activities. In: Proceedings of the CIB W99 International Conference, Gainesville, Florida, USAGoogle Scholar
  14. 14.
    Sobotka, A., Radziejowska, A., Czaja, J.: Tasks and problems in the buildings demolition works: a case study. Arch. Civ. Eng. 3–18 (2015)Google Scholar
  15. 15.
    Ulang, N.M., Kadar, N.A.: Study on health and safety aspects of demolition projects in Penang. Jurnal Teknologi 75(5)Google Scholar
  16. 16.
    Yi, K.-J., Langford, D.: Scheduling-based risk estimation and safety planning for construction projects. J. Constr. Eng. Manag. 132(6), 626–635 (2006)CrossRefGoogle Scholar
  17. 17.
    Zhen, C., Abdullah, A.B., Anumba, C.J., Li., H.: ANP experiment for demolition plan evaluation. J. Constr. Eng. Manag. 140(2)Google Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2020

Authors and Affiliations

  1. 1.National Institute of Construction Management and Research (NICMAR)PondaIndia

Personalised recommendations