Advertisement

Study of a New Method of Traffic Organization in Reconstruction and Extension of Chang-Zhang Expressway

  • Yazhen ChenEmail author
Conference paper
  • 6 Downloads
Part of the Lecture Notes in Electrical Engineering book series (LNEE, volume 617)

Abstract

Through the study of a new method of traffic organization to reconstruction and extension plan for the reconstruction and extension of the Chang zhang Expressway, from the aspects of program design, emergency response and security measures in the implementation process, the system summarizes the advantages and disadvantages of the transportation organization management for the reconstruction and expansion of the Chang zhang Expressway, and provides reference cases for the subsequent reconstruction and extension of similar highways.

Keywords

Chang zhang expressway Reconstruction and extension Four-lane traffic flow Traffic organization 

References

  1. 1.
    Zhang H (2015) With the “three guarantees” as the core concept of highway reconstruction and expansion of traffic organization managementGoogle Scholar
  2. 2.
    Zhen Wu T (2006) The analysis and experimental study of the simple-continuous beam bridge. Master’s thesis of Zhejiang universityGoogle Scholar
  3. 3.
    Zhang ZC (2015) The study of traffic organization of highway interchange. Master degree thesis of Changsha university of science and technologyGoogle Scholar

Copyright information

© Springer Nature Singapore Pte Ltd. 2020

Authors and Affiliations

  1. 1.Wuhan Zhongjiao Traffic Engineering Co., LtdWuhanChina
  2. 2.CCCC Second Expressway Consultant Co. LtdWuhanChina

Personalised recommendations