Abstract

Building enclosure and supporting system has been widely used for the construction of soft soil foundation. To improve the deformation of envelope system and stratum, this paper presents a novel pre-supporting excavation method (PEM). Unlike traditional construction methods, the new method proposes supporting system be installed completely before excavation and one of the key problems is the stability of over-length trench supported by slurry. Aiming at the stability analysis, this paper does an in-depth research by a numerical simulation analysis and a model of slurry-filled trench wall in the actual excavation environment is analyzed based on the elasto-plastic finite-element method (FEM). Various factors influencing on the stability of trench wall and the settlement of ground surface are considered, especially the groundwater as an important point is of key consideration. The analysis results show that the stability of over-length slurry trench could be ensured in the condition of dewatering under the bottom of foundation pit.

Keywords

Pre-supporting Excavation Pit foundation FEM 

Notes

Acknowledgments

The financial support of this work by Shanghai Urban Construction Group is gratefully acknowledged by the authors.

References

  1. Clough, G. W., & Duncan, J. M. (1971). Finite element analyses of retaining wall behavior. Journal of Geotechnical Engineering, ASCE, 97(12), 1657–1673.Google Scholar
  2. Fen, Y. (2010). Diaphragm wall recessed into the wall stage slot wall stability and deformation of thress-dimensional numerical analysis. Structure Construction, 32(5), 415–418.Google Scholar
  3. George, M. F., Tiffany, A., & Richard, R. D. (2004). Stability of long trenches in sand supported by Bentonite-water slurry. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 130(9), 915–921.CrossRefGoogle Scholar
  4. Liu, G., & Lu, H. (2005). Settlement study of diaphragm wall trench construction. Journal of Geotechnical Engineering, 27(2), 287–289.Google Scholar
  5. Patrick, J. F. (2004). Analytical solutions for stability of slurry trench. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 130(7), 749–758.CrossRefGoogle Scholar
  6. Pavol, O., Keizo, U., Masaaki, K., et al. (2001). A design method for slurry trench wall stability in sandy ground based on the elasto-plastic FEM. Computers and Geotechnics, 28(2001), 145–159.Google Scholar
  7. Shi, S., & Zhang, W. (2006). Stability study in deep pit diaphragm slurry trench. Journal of Geotechnical Engineering, 28, 1418–1421.Google Scholar
  8. Tsai, J. S., & Chang, J. C. (1996). Three-dimensional stability analysis for slurry-filled trench wall in cohesionless soil. Canadian Geotechnical Journal, 33, 798–808.CrossRefGoogle Scholar
  9. Zhang, H., & Xia, M. (2000). Three-dimensional analysis of stability in diaphragm wall slurry trench construction. Journal of Civil Engineering, 33(1), 73–76.Google Scholar
  10. Zhen, Y. (2007). Stability study of diaphragm wall trench. Geotechnical Engineering, 21(1), 36–38.Google Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2013

Authors and Affiliations

  1. 1.Department of Geotechnical EngineeringSchool of Civil Engineering Tongji UniversityShanghaiChina
  2. 2.Shanghai Urban Construction (Group) CorporationShanghaiChina

Personalised recommendations