Advertisement

Synthesis of Main Parameters and Experimental Approbation of Test Bench for Study of Working Processes of Intermediate Belt Conveyor Drive

  • K. A. Goncharov
  • A. V. Grishin
Conference paper
Part of the Lecture Notes in Mechanical Engineering book series (LNME)

Abstract

The article considers the state of the study of closed traction circuits used as intermediate drives of main belt conveyors, which showed insufficient experimental investigation of continuous transport vehicles. This circumstance leads to the expediency of developing a test bench for investigating the effect of the intermediate belt drive construction on its working processes. Possible emerging typical defects of belt conveyors, as well as methods for eliminating negative consequences arising during the installation and operation of the machine, are described. On the basis of the resulted defects and operating influences the mathematical model for an estimation of level of the decisions put in design on possible defects of installation and operation of the conveyor belt, approved on the created stand is offered. The procedure for designing a bench to investigate the working processes of an intermediate belt drive of a belt conveyor as well as the manufacturing, assembly, and installation process followed by adjustment are described.

Keywords

Belt conveyor Intermediate belt drive Belt conveyor assembly Test bench 

References

  1. 1.
    Galkin VI (2005) Modern theory of belt conveyors of mining enterprises. MSGU Publishing House, MoscowGoogle Scholar
  2. 2.
    Goncharov KA (2011) Justification of the choice of drive systems for extended belt conveyors with a complex route. Dissertation, BryanskGoogle Scholar
  3. 3.
    Reutov AA (2010) Analysis of the joint work of the end and intermediate drives of the belt conveyor. Bull Bryansk State Tech Univ 2:42–45Google Scholar
  4. 4.
    Shakhmeister LH, Dmitriev VG (1987) Theory and calculation of belt conveyors. Mechanical Engineering, MoscowGoogle Scholar
  5. 5.
    Goncharov KA (2015) Determination of zones relative to slipping and resting of load-carrying and traction belts using intermediate drives of belt conveyors. Sci Tech Her BSU 2:31–36Google Scholar
  6. 6.
    Reutov AA (2011) Modeling of drives of belt conveyors. BSTU, BryanskGoogle Scholar
  7. 7.
    Goncharov KA, Grishin AV (2017) Theoretical study of influence of belt tension of intermediate belt conveyor drive on value of zone of relative slip of traction and carrying belts. IOP Conf Ser Earth Environ Sci 87Google Scholar
  8. 8.
    Sheshko EE (2009) Influence of the stress-strain state of ribbons of a slope-folding conveyor with a clamping belt on its operability. Gorn zh 1:79–82Google Scholar
  9. 9.
    Lagerev AV, Tolkachev EN, Lagerev IA (2016) Modelling of a vertical loop conveyor with suspended belt and distributed drive. Int Rev Model Simul 9:271–279Google Scholar
  10. 10.
    Goncharov KA (2016) Substantiation of the method of choosing rational variants of drive systems of belt conveyors on the basis of the hierarchy analysis method. Sci Tech Her BSU 2:66–70Google Scholar
  11. 11.
    Goncharov KA (2011) Determination of the rational variant of the system of drives of belt conveyor LST-1600. Bull BSTU 4:33–38Google Scholar
  12. 12.
    Goncharov KA (2015) A mathematical model of the distribution of tractive efforts between drives of a belt conveyor with hydraulic couplings at their failure. In: Automation and control systems. IEEE catalog number: CFP1561Y-ART, 02-15-NSAPGoogle Scholar
  13. 13.
    Barabanov VB (1971) Results of the second stage of operational tests of an industrial sample of a multi-drive belt conveyor. In: Continuous transport vehicles: collection of csient works, vol. 11. VNIIPTMASH, Moscow, pp 52–58Google Scholar
  14. 14.
    Dyachkov VK (1971) Results of the investigation of linear friction drives of a multi-drive belt conveyor. In: Continuous transport vehicles: collect of scientific papers, vol. 11. VNIIPTMASH, Moscow, pp 33–51Google Scholar
  15. 15.
    Trufanova IS (2014) Substantiation of rational parameters of intermediate linear drives with clamping elements for belt conveyors. Dissertation, St. PetersburgGoogle Scholar
  16. 16.
    Tarasov YuD, Trufanova IS, Kuzmin AO (2013) Test bench for research of parameters of intermediate linear drive of a belt conveyor. Patent Russian Federation 2498260 MPK7 G01M 17/00, B65G 23, 11.10.2013Google Scholar
  17. 17.
    Goncharov KA, Grishin AV (2016) Experimental study of the effect of installation defects on the traction capacity of the intermediate drive of a belt conveyor. Sci Tech Her BSU 3:289–295Google Scholar
  18. 18.
    Reutov AA (2008) Installation, operation and repair of conveyor belts: textbook, 2nd edn. Revised and addicted. BSTU, BryanskGoogle Scholar
  19. 19.
    Goncharov KA, Grishin AV (2017) Experimental stand for the investigation of the influence of the construction of an intermediate tape drive of a belt conveyor on its working processes. Sci Tech Her BSU 1:52–59Google Scholar
  20. 20.
    Jacobson MO (1972) Unified system of preventive maintenance and rational operation of technological equipment of machine-building enterprises, 6th edn. Revised and addicted. Mechanical Engineering, MoscowGoogle Scholar

Copyright information

© Springer Nature Switzerland AG 2019

Authors and Affiliations

  1. 1.Bryansk State Technical UniversityBryanskRussia

Personalised recommendations