Consumer (Co-)Ownership in Renewables in Pakistan

  • Junaid Alam MemonEmail author
  • Anwar Hussain
Chapter

Abstract

In September 2015, the National Electric Power Regulatory Authority (NEPRA) introduced Net Metering Regulations allowing domestic, commercial, or industrial electricity consumers to install up to 1 MW capacity solar and wind power systems for personal use as well as feed them into the national grid. The government furthermore abolished the import tax duty of 32.5 per cent on solar energy equipment announced in the 2014–15 budget to incentivize consumers to install rooftop solar panels and thus acquire ownership of RE installations. Consumer (co-)ownership is not directly conceived as a policy goal except for the indirect mention in off-grid power projects to be commissioned through public sector financing and/or through community/NGO/donor participation. Participation in RE projects is possible via any available type of corporation including cooperatives, partnership, or individual business or institutional activity, similar to those in other countries. Investments in grid-connected solar collectors and PV installations on private buildings, often financed through the owners’ equity are gaining popularity. However, on-grid citizen energy or community projects open to the public are not popular yet. However, off-grid community power projects, mostly hydro, having micro/mini grids have been present in the northern areas of Pakistan for more than two decades. Most of these projects are conceived by general purpose or specialized Village Organizations (VOs) registered with any NGOs such as the Agha Khan Rural Support Program (AKRSP) and Sarhad Rural Support Program (SRSP). Although VOs and NGOs jointly finance these projects usually at 20 and 80 per cent respectively, ownership rests with communities, with the NGO being a mere facilitator to channel government and donor grants.

References

  1. Aized, T., Mehmood, S., & Anwar, Z. (2017). Building energy consumption analysis. Energy Saving Measurements and Verification by Applying HAP Software, 21, 1–10.Google Scholar
  2. Ali, S. M. H., Zuberi, M. J. S., Tariq, M. A., Baker, D., & Mohiuddin, A. (2015). A study to incorporate renewable energy technologies into the power portfolio of Karachi, Pakistan. Renewable and Sustainable Energy Reviews, 47, 14–22.  https://doi.org/10.1016/j.rser.2015.03.009.CrossRefGoogle Scholar
  3. Ashfaq, Z. (2016). Accelerating wind power deployment in Pakistan: Capacity building and policy options. Islamabad: World Wind Energy Association and Heinrich Böll Stiftung.Google Scholar
  4. Aziz, R., & Ahmad, M. B. (2015). Special report: Pakistan’s power crisis—The way forward. Washington, DC: United States Institute of Peace.Google Scholar
  5. Bakhtiar, F., & Ahmed, A. (2017). A review of solar energy in Pakistan: Current status and future prospects. Science, Technology, and Development, 36, 189–195.  https://doi.org/10.3923/std.2017.189.195.CrossRefGoogle Scholar
  6. Baloch, M. H., Kaloi, G. S., & Memon, Z. A. (2016). Current scenario of the wind energy in Pakistan challenges and future perspectives: A case study. Energy Reports, 2, 201–210.  https://doi.org/10.1016/j.egyr.2016.08.002.CrossRefGoogle Scholar
  7. Chitraltoday. (2015). Three more villages in Laspur light up through community initiatives [WWW Document]. Retrieved March 18, 2018, from https://goo.gl/2Qr4MH.
  8. Co-operative Housing International. (n.d.). Pakistan [WWW Document]. Hous. Co-operatives Worldw. Retrieved April 22, 2018, from http://www.housinginternational.coop/co-ops/pakistan/.
  9. Enclude, Foresight Research. (2016). Electricity access in Pakistan summary slides. Islamabad: The World Bank.Google Scholar
  10. Federal Board of Revenue. (2011, October). Income tax manual part I—Income tax ordinance, 2001 (amended upto June 30, 2011). Government of Pakistan.Google Scholar
  11. Finclusion. (2017). Financial inclusion insights: Wave 4 report FII tracker survey 2016—Pakistan. Retrieved from www.finclusion.org.
  12. Government of Pakistan. (2016). Multidimensional poverty in Pakistan. Islamabad: Government of Pakistan, UNDP, Oxford University.Google Scholar
  13. Government of Pakistan. (2006). Policy for development of renewable energy for power generation, 2006 (employing small hydro, wind, and solar technologies). Islamabad: Government of Pakistan.Google Scholar
  14. HDIP. (2017). Pakistan energy yearbook 2016. Hydrocarbon development institute of Pakistan. Islamabad: Ministry of Petroleum and Natural Resources, Government of Pakistan.Google Scholar
  15. IEA. (2017). Energy access outlook 2017. International Energy Agency.Google Scholar
  16. IFC. (2016). A solar developer’s guide to Pakistan. International Finance Corporation (MENA).Google Scholar
  17. Imran, M. (2016). Energy dependence of Pakistan and its impact on the economy: Implications under CPEC. PERI Policy Brief, Lahore.Google Scholar
  18. INTEGRATION. (2014). External review of water and energy security through microhydel (MHP). Swiss Agency for Development and Cooperation SDC Embassy of Switzerland Swiss Cooperation Office Pakistan.Google Scholar
  19. Kamran, M. (2018). Current status and future success of renewable energy in Pakistan. Renewable and Sustainable Energy Reviews, 82, 609–617.  https://doi.org/10.1016/j.rser.2017.09.049.CrossRefGoogle Scholar
  20. Mahmood, R., & Shah, A. (2017). Deprivation counts: An assessment of energy poverty in Pakistan. Lahore Journal of Economics, 1, 109–132.Google Scholar
  21. Maier, C. (2007). Decentralised rural electrification by means of collective action. The Sustainability of Community-Managed Micro Hydels in Chitral, Pakistan, Occasional Papers Geographie. Zentrum für Entwicklungsländerforschung (ZELF), Institut für Geographische Wissenschaften, Freie Universität Berlin.Google Scholar
  22. Mirza, B. (2015). Energy poverty and the perception of, and satisfaction with, renewable energy technologies: The case of solar villages in Pakistan. In S. Hostettler, A. Gadgil, & E. Hazboun (Eds.), Sustainable access to energy in the global South: Essential technologies and implementation approaches (pp. 113–128). Heidelberg: Springer Cham.  https://doi.org/10.1007/978-3-319-20209-9Google Scholar
  23. Mirza, U. K., Ahmad, N., Harijan, K., & Majeed, T. (2009). Identifying and addressing barriers to renewable energy development in Pakistan. Renewable and Sustainable Energy Reviews, 13, 927–931.  https://doi.org/10.1016/j.rser.2007.11.006.CrossRefGoogle Scholar
  24. Mohsin, M., Rasheed, A. K., & Saidur, R. (2018). Economic viability and production capacity of wind generated renewable hydrogen. International Journal of Hydrogen Energy 1–10.  https://doi.org/10.1016/j.ijhydene.2017.12.113.CrossRefGoogle Scholar
  25. MPDR. (2014). Pakistan 2025: One nation—One vision. Planning Commission, Government of Pakistan.Google Scholar
  26. Mustafa, U., Tobias, G., & Dreesmann, G. (2016a). Roadmap for the rollout of net metering regulations in Pakistan. Lahore: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH and Alternate Energy Development Board (AEDB).Google Scholar
  27. Mustafa, U., Tobias, G., & Dreesmann, G. (2016b). Business Case for Implementation of Net Metering Regulations 2015. Lahore: Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH and Alternate Energy Development Board (AEDB).Google Scholar
  28. NEPRA. (2017a). State of industry report 2016. Islamabad.Google Scholar
  29. NEPRA. (2017b). (ARE) Distributed Generation and Net Metering Regulations, 2015, Amendment-1 vide S.R.O. 1025(1)/2017 (Date: October 10), and, Amendment-2 vide S.R.O. 1261(J)/2017 (Date: December 20).Google Scholar
  30. NEPRA. (2017c). Review motions against abolishment of upfront tariff regime in favor of competitive bid-ding vide notification: No. NEPRA/SPVPGT-2017/15770-1577 (Date: September 20) for Solar; and, No. NEPRA/TRF-WPT/2017/8179-8181 (Date: May 30) for Wind.Google Scholar
  31. NEPRA. (2015, September 1). (ARE) Distributed Generation and Net Metering Regulations, 2015—Notification No.: S.R.O 892 (1)/2015.Google Scholar
  32. NTDC. (2016). Power system statistics 2015–2016. National Transmission and Dispatch Company.Google Scholar
  33. PakistanToday. (2017). Ten Discos fail to recover Rs. 632 billion electricity bills [WWW Document]. Pakistan Today (Profit). Retrieved March 15, 2018, from https://goo.gl/uRkk9j.
  34. PBC. (2018). Pakistan economic forum IV, Energy Panel Report. Pakistan Business Council.Google Scholar
  35. PPIB. (2008). National policy for power co-generation by sugar industry and guidelines for investors. Islamabad: Government of Pakistan, Ministry of Water and Power Private Power and Infrastructure Board.Google Scholar
  36. Raheem, A., Abbasi, S. A., Memon, A., Samo, S. R., Taufiq-Yap, Y. H., Danquah, M. K., et al. (2016). Renewable energy deployment to combat energy crisis in Pakistan. Energy, Sustainability and Society, 6.  https://doi.org/10.1186/s13705-016-0082-z.
  37. Riccardo, A. (2014). Presentation on “sustainable energy finance opportunities in Pakistan” in Karachi [WWW Document]. Retrieved March 20, 2018, from https://goo.gl/WnfwVe.
  38. Sahir, M. H., & Qureshi, A. H. (2008). Assessment of new and renewable energy resources potential and identification of barriers to their significant utilization in Pakistan. Renewable and Sustainable Energy Reviews, 12, 290–298.  https://doi.org/10.1016/j.rser.2006.07.002.CrossRefGoogle Scholar
  39. SBP. (2017a). Annual report 2016–2017 (State of the Economy). Islamabad: State Bank of Pakistan.Google Scholar
  40. SBP. (2017b). Policy for promotion of SME finance State Bank of Pakistan. Islamabad: Infrastructure, Housing & SME Finance Department, State Bank of Pakistan.Google Scholar
  41. Shaikh, F., Ji, Q., & Fan, Y. (2015). The diagnosis of an electricity crisis and alternative energy development in Pakistan. Renewable and Sustainable Energy Reviews, 52, 1172–1185.  https://doi.org/10.1016/j.rser.2015.08.009.CrossRefGoogle Scholar
  42. Tahir, Z. R., & Asim, M. (2018). Surface measured solar radiation data and solar energy resource assessment of Pakistan: A review. Renewable and Sustainable Energy Reviews, 81, 2839–2861.  https://doi.org/10.1016/j.rser.2017.06.090.CrossRefGoogle Scholar
  43. The News. (2018). Pak power—Progress and way forward (Special Report). National Seminar March 5, 2018, Jang Media Group.Google Scholar
  44. Wakeel, M., Chen, B., & Jahangir, S. (2016). Overview of energy portfolio in Pakistan. Energy Procedia, 88, 71–75.  https://doi.org/10.1016/j.egypro.2016.06.024.CrossRefGoogle Scholar
  45. Walker, T. F., Canpolat, E., Khan, F. K., & Kryeziu, A. (2016). Residential electricity subsidies in Pakistan: Targeting, welfare impacts, and options for reform. No. Policy Research Working Paper 7912, World Bank Group—Social Protection and Labor Global Practice Group.Google Scholar
  46. Yazdanie, M. (2010). Renewable energy in Pakistan: Policy strengths, challenges & the path forward, selected term papers. Centre for Energy Policy and Economics (CEPE).Google Scholar
  47. Zameer, H., & Wang, Y. (2018). Energy production system optimization: Evidence from Pakistan. Renewable and Sustainable Energy Reviews, 82.  https://doi.org/10.1016/j.rser.2017.09.089.CrossRefGoogle Scholar

Copyright information

© The Author(s) 2019

Authors and Affiliations

  1. 1.Department of Public PolicyPakistan Institute of Development EconomicsIslamabadPakistan
  2. 2.Department of Environmental EconomicsPakistan Institute of Development EconomicsIslamabadPakistan

Personalised recommendations