Evaluation of Factors Affecting the Process of Decision Making in Construction Site

  • Almedina MustafićEmail author
  • Suad Špago
  • Adnan Novalić
  • Ahmed El Sayed
Conference paper
  • 42 Downloads
Part of the Lecture Notes in Networks and Systems book series (LNNS, volume 128)

Abstract

This paper aimed to explore factors that may have significant impact on the decision-making process for engineering at construction site, to analyze the existing decision-making methods for the construction industry worldwide, to gather the factors affecting the decision-making process at construction site, and to list these factors according to their impact and frequency of occurring. Results gained by using qualitative research methods proved that Construction site layout planning, supplier selection process, and materials management practices at the site are the most frequent factors influencing the decision-making process at the site.

Keywords

Decision-making process Effective models Construction site Project management Decision-making support system Layout planning Materials management 

References

  1. 1.
    Scherer, R.J., Schapke, S.E.: A distributed multi-model-based management information system for simulation and decision-making on construction projects. Adv. Eng. Inform. 25(4), 582–599 (2011)CrossRefGoogle Scholar
  2. 2.
    Drucker, P.F.: The Effective Decision. Harvard University, Graduate School of Business Administration (1967)Google Scholar
  3. 3.
    Kerzner, H.: Project Management: A Systems Approach to Planning, Scheduling and Controlling, 10th edn. Wiley, Hoboken (2017)Google Scholar
  4. 4.
    March, J.G.: A Primer on Decision Making: How Decisions Happen. Simon & Schuster, New York (1994)Google Scholar
  5. 5.
    Szafranko, E.: Decision problems in management of construction projects. IOP Conf. Ser. Mater. Sci. Eng. 251, 012048 (2017)CrossRefGoogle Scholar
  6. 6.
    Poon, S., Price, A.D.F.: Decisions Made on Construction Sites. In: 15th Annual ARCOM Conference, Liverpool (1999)Google Scholar
  7. 7.
    Aquad, G., Lee, A., Wu, S.: Constructing the Future: nD Modelling. Taylor & Francis, London (2007)Google Scholar
  8. 8.
    Hartmann, T., Gao, J., Fischer, M.: Areas of application for 3D and 4D models on construction projects. J. Constr. Eng. Manag. 136(8), 931–934 (2008)Google Scholar
  9. 9.
    Chau, K.W., Anson, M., Zhang, J.P.: Four-dimensional visualization of construction scheduling and site utilization. J. Constr. Eng. Manag. 130(4), 598–606 (2004)CrossRefGoogle Scholar
  10. 10.
    Mohemad, R., Hamdan, A.R., Othman, Z.A., Noor, N.M.: Decision support systems (DSS) in construction tendering processes. Int. J. Comput. Sci. Issues (IJCSI) 7(2), 35–45 (2010)Google Scholar
  11. 11.
    Yung, Y., Jeong, M.G., Mills, T.: Identifying the preferred leadership style for managerial position of construction management. Int. J. Constr. Eng. Manag. 3(2), 47–56 (2014)Google Scholar
  12. 12.
    Ning, X., Lam, K.-C., Lam, M.C.-K.: A decision-making system for construction site layout planning. Autom. Constr. 20(4), 459–473 (2011)CrossRefGoogle Scholar
  13. 13.
    Hanak, T., Marović, I.: Selection of adequate site location during early stages of construction project management: a multi-criteria decision analysis approach. IOP Conf. Ser. Mater. Sci. Eng. 251, 012044 (2017)CrossRefGoogle Scholar
  14. 14.
    Jajac, N., Bilić, I., Ajduk, A.: Decision support concept to management of construction projects-problem of construction site selection. Croatian Oper. Res. Rev. 4(1), 235–246 (2013)Google Scholar
  15. 15.
    Dhanure, Y., Pathak, S.: Optimization of site layout planning for multiple construction stages with safety consideration and requirements. Int. Res. J. Eng. Technol. 3(5), 3173–3176 (2016)Google Scholar
  16. 16.
    Mahdjoubi, L., Yang, J.: An intelligent materials routing system on complex construction sites. J. Logistics Inf. Manag. 14(5/6), 337–344 (2001)CrossRefGoogle Scholar
  17. 17.
    Kar, A.K.: Modeling of supplier selection in e-procurement as a multi-criteria decision making problem. Sprouts Working Pap. Inf. Syst. 9(40), 9–40 (2009)Google Scholar
  18. 18.
    Ferrada, X., Serpell, A., Skibniewski, M.: Selection of construction methods: a knowledge-based approach. Sci. World J. 2013, 23 (2013)CrossRefGoogle Scholar
  19. 19.
    Olander, S., Landin, A.: A comparative study of factors affecting the external stakeholder management process. Constr. Manag. Econ. 26(6), 553–561 (2008)CrossRefGoogle Scholar
  20. 20.
    Bizon-Gorecka, J., Gorecki, J.: Influence of selected stakeholders of construction investment projects on the course of project. IOP Conf. Ser. Mater. Sci. Eng. 245, 072018 (2017)CrossRefGoogle Scholar
  21. 21.
    Tilley, P., Mcfallan, S., Tucker, S.: Design and documentation quality and its impact on the construction process. In: Customer Satisfaction: A Focus for Research and Practice in Construction. CIB W55 & W65 Joint Triennial Symposium, Cape Town (1999)Google Scholar
  22. 22.
    Ljevo, Ž., Vukomanović, M.: Characteristic project management model found in construction companies of Bosnia and Herzegovina. Technical Gazette 20(3651), 689–696 (2013)Google Scholar

Copyright information

© Springer Nature Switzerland AG 2020

Authors and Affiliations

  • Almedina Mustafić
    • 1
    Email author
  • Suad Špago
    • 2
  • Adnan Novalić
    • 1
  • Ahmed El Sayed
    • 1
  1. 1.Faculty of Engineering and Natural SciencesInternational Burch UniversityIlidža, SarajevoBosnia and Herzegovina
  2. 2.Faculty of Civil EngineeringUniversity “DžemalBijedić”MostarBosnia and Herzegovina

Personalised recommendations