Advertisement

4D and 5D BIM: A System for Automation of Planning and Integrated Cost Management

  • Uğur ÇelikEmail author
Conference paper
  • 69 Downloads
Part of the Communications in Computer and Information Science book series (CCIS, volume 1188)

Abstract

The construction sector has difficulty in catching the rapidly developing technology era. While the sectors are rapidly adapting themselves to the new era, firms that do not invest in innovation lose their value at a fast pace. When we look at the Fortune 500 list, it is seen that the biggest leap is made by companies in the IT sector. However, the situation is observed to be the opposite for construction companies. Despite the enormous investment costs and the huge risks involved, construction companies are unable to compete with the leaders of the digital world and falling down in the list. The losses of time and cost are increasing in the construction sector which lags behind in the digitizing world. The systematic analysis of these losses with analytical methods remains limited and there are problems in project management approaches. The industry today invests into digital transformation with Building Information Modeling (BIM) to deal with these problems in the construction sector and to produce a solution according to their dynamics in the digital world. BIM is the digital twin model of actual construction consisting of data-rich 3D objects. Accurate management of a data-rich model is possible with data management techniques. In order to fully benefit from this digital reflection of construction projects, the sector needs to establish processes based on basic theories of digital data management. This study is designed to provide a methodology in which the BIM 4D and 5D processes are handled as integrated and business intelligence approaches. While approaching Information Modeling from Building perspective, some basic approaches to data science have been integrated with 4D and 5D processes. The main objective of the study is to contribute to the digitalization process and to present a proposal for the application of the business intelligence in BIM processes.

Keywords

4D and 5D BIM Business intelligence Automation of construction 

References

  1. 1.
  2. 2.
  3. 3.
  4. 4.
  5. 5.
    The British Standards Institution: BS EN ISO 19650-1:2018 organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) - information management using building information modelling part 1: concepts and principles (2018)Google Scholar
  6. 6.
    The British Standards Institution: BS EN ISO 19650-2:2018 organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) - information management using building information modelling part 2: concepts and principles (2018)Google Scholar
  7. 7.
  8. 8.
    The British Standards Institution: PAS 1192-2:2013 specification for information management for the capital/delivery phase of construction projects using building information modelling. Incorporating Corrigendum No. 1 (2013)Google Scholar
  9. 9.
    Associated General Contractors of America: The contractors’ guide to BIM, edn 1 (2005)Google Scholar
  10. 10.
    Mitchell, D.: 5D – creating cost certainty and better buildings. In: RICS Cobra Conference, Las Vegas (2012)CrossRefGoogle Scholar
  11. 11.
  12. 12.
    Project Management Institute Standards Committee: The Project Management Body of Knowledge (PMBOK). Project Management Institute, Darby (1987)Google Scholar
  13. 13.
    Norman, E.S., Brotherton, S., Fried, R.T., Ksander, G.: Building high quality work breakdown structures using the practice standard for work breakdown structures—second edition. Paper presented at PMI® Global Congress 2006—North America, Seattle, WA. Project Management Institute, Newtown Square (2006)Google Scholar
  14. 14.
    Akpınar, H.: Data: Veri Madenciliği Veri Analizi, 1st edn. Papatya Yayıncılık, İstanbul (2014)Google Scholar
  15. 15.
    Rowley, J.: The wisdom hierarchy: representations of the DIKW hierarchy. J. Inf. Sci. 33(2), 163–180 (2007)CrossRefGoogle Scholar
  16. 16.
    Çağıltay, N.: İş Zekası ve Veri Ambarı Sistemleri, 1st edn. ODTÜ Yayıncılık, Ankara (2010)Google Scholar
  17. 17.
    Naeem Hasan, A., Rasheed, M.S.: The benefits of and challenges to implement 5D BIM in construction industry. Civil Eng. J. 5, 412 (2019).  https://doi.org/10.28991/cej-2019-03091255CrossRefGoogle Scholar
  18. 18.
    Azhar, S., Hein, M., Sketo, B.: Building Information Modeling (BIM): benefits, risks and challenges. McWhorter School of Building Science, Auburn University, Auburn, Alabama (2011)Google Scholar
  19. 19.
    Aapaoja, A., Haapasalo, H.: The challenges of standardization of products and processes in construction. In: Proceedings of the 22nd Annual Conference of the International Group for Lean, Olso, Norway, 25–27 June 2014, pp. 983–993 (2014)Google Scholar
  20. 20.
    Faisal, S., Sarwar, M., Shahzad, K., Sarwar, S., Jaffry, W., Yousaf, M.M.: Temporal and evolving data warehouse design. Sci. Program. 2017, 18 (2017). Article ID 7392349Google Scholar
  21. 21.
  22. 22.
  23. 23.
  24. 24.
  25. 25.
  26. 26.
  27. 27.
    Liew, A.: DIKIW: data, information, knowledge, intelligence, wisdom and their interrelationships. Bus. Manag. Dyn. 2, 49–62 (2013)CrossRefGoogle Scholar

Copyright information

© Springer Nature Switzerland AG 2020

Authors and Affiliations

  1. 1.EMAY International Engineering and Consultancy Inc.İstanbulTurkey

Personalised recommendations