Advertisement

Open Pit Mine Scheduling Model Considering Blending and Stockpiling

  • Mojtaba RezakhahEmail author
  • Eduardo Moreno
Conference paper
Part of the Springer Series in Geomechanics and Geoengineering book series (SSGG)

Abstract

Open pit mine production scheduling (OPMPS) is a decision problem which maximizes net present value (NPV) by determining the extraction time and destination of each block of ore and/or waste in a deposit. Stockpiles can be used to maintain low-grade ore for future processing, to store extracted material until processing capacity is available, or to blend material based on single or multiple block characteristics (i.e., metal grade and/or contaminant).

We modify an existing integer-linear program to maximize NPV and provide a schedule and stockpiling strategy for an operational open pit mine, in which the stockpile is used to blend materials based on multiple block characteristics. We compare the schedule of \( \left( {\hat{p}^{la} } \right) \) with that produced by \( (p^{ns} ) \) which does not consider stockpiling, and with \( \left( {\tilde{p}^{la} } \right), \) which controls only the metal content in the stockpile and ignores the contaminant level at the mill and in the stockpile. We show that our model improves the NPV of the project while satisfying operational constraints.

Keywords

Stockpiling Linear and integer programming Mine planning Open pit mining 

References

  1. Akaike, A., Dagdelen, K.: A strategic production scheduling method for an open pit mine. In: Proceedings of the 28th International Symposium on Application of Computers and Operations Research in the Mineral Industry (APCOM 1999), pp. 729–738. Colorado School of Mines (1999)Google Scholar
  2. Bley, A., Boland, N., Froyland, G., Zuckerberg, M.: Solving mixed integer nonlinear programming problems for mine production planning with stockpiling. Optimization Online (2012). http://www.optimization-online.org/DB_HTML/2012/11/3674.html
  3. Hoerger, S., Seymour, F., Homan, L.: Mine planning at newmont’s Nevada operations. Min. Eng. 51(10), 26–30 (1999)Google Scholar
  4. Lerchs, H., Grossmann, I.: Optimum design of open-pit mines. Can. Min. Metall. Bull. LXVIII, 17–24 (1965)Google Scholar
  5. Moreno, E., Rezakhah, M., Newman, A., Ferreira, F.: Linear models for stockpiling in open-pit mine production scheduling problems. Eur. J. Oper. Res. 260(1), 212–221 (2017).  https://doi.org/10.1016/j.ejor.2016.12.014CrossRefGoogle Scholar

Copyright information

© Springer Nature Switzerland AG 2020

Authors and Affiliations

  1. 1.Tarbiat Modares UniversityTehranIran
  2. 2.Faculty of Engineering and SciencesUniversidad Adolfo IbanezSantiagoChile

Personalised recommendations