Advertisement

Content Management Method of Complex Technical System Development Projects

  • D. N. KritskiyEmail author
  • E. A. Druzhinin
  • A. V. Karatanov
  • O. S. Kritskaya
Conference paper
Part of the Advances in Intelligent Systems and Computing book series (AISC, volume 1080)

Abstract

The article covers unmanned aerial vehicle development project content. To achieve this goal the project stages table was suggested, including technical solutions volumes indicators obtain during their implementation. Further development of the method of mastered volume due to the introduction of such indicators as planned decisions, actual decisions, confirmed decisions; on the basis of this approach, a system of inequalities is proposed, which allows assessing the feasibility of the project to create unmanned aircraft; presented the results obtained during the implementation of the project in the Research Institute of Aircraft Flight Modes of the National Aerospace University “Kharkiv Aviation Institute”.

Keywords

Complex technical systems Earned value method Content management System of inequalities of project indices management 

References

  1. 1.
    Karimov, A.H.: Features of designing unmanned aircraft systems of the new party and special. In: Proceedings of MAI, 47. https://www.mai.ru/science/trudy (2011)
  2. 2.
    Chenarani, A., Druzhinin, E.A., Kritskiy, D.N.: Simulating the impact of activity uncertainties and risk combinations in R&D projects. J. Eng. Sci. Technol. Rev. 10(4), 1–9 (2017)CrossRefGoogle Scholar
  3. 3.
    Mazur, I.I., Shapiro, V.D.: Project Management, 6th edn, p. 960. Omega-L, Moscow (2010)Google Scholar
  4. 4.
    Guide to the Body of Knowledge Project Management American National Standard ANSI: Project Management Institute (2013)Google Scholar
  5. 5.
    P2M: A guidebook of Project and Program Managements for Enterprise Innovation, vol. 1, Revision 3. Project Management Assosiation of Japan (PMJA) (2005)Google Scholar
  6. 6.
    Shakhovska, N., Vovk, O., Hasko, R., Kryvenchuk, Y.: The method of big data processing for distance educational system. In: Conference on Computer Science and Information Technologies, pp. 461–473. Springer, Cham, September 2017Google Scholar
  7. 7.
    Shakhovska, N., Vovk, O., Kryvenchuk, Y.: Uncertainty reduction in Big data catalogue for information product quality evaluation. Eastern Eur. J. Enterp. Technol. 1(2–91), 12–20 (2018)Google Scholar
  8. 8.
    Pavlov, A.N.: Project Management based on the standard PMI PMBOK. Statement of the methodology and experience. BINOM. Laboratory of Knowledge, Moskow (2012)Google Scholar
  9. 9.
    Ayupov, A.I., Plyaskota, S.I.: Testing and quality requirements. Modern approaches to aircraft building. In: Management of development of large-scale systems: Proceedings IV International, pp. 179–180 (2010)Google Scholar
  10. 10.
    Popov, V.L.: Management of innovative projects, p. 336. INFRA-M, Moskow (2009)Google Scholar
  11. 11.
    Kritskiy, D.N., Druzhynin, Y.A., Pohudina, O.K. Krytska, O.S.: Decision making by the analysis of project risks based on the FMEA method. In: Computer Sciences and Information Technologies, CSIT 2018, no. CFP18D36, pp. 187–190 (2018)Google Scholar
  12. 12.
    Kritsky, D.N., Druzhinin, E.A., Pogudina, O.K. Kritskaya, O.S.: A method for assessing the impact of technical risks on the aerospace product development projects. In: Advances in Intelligent Systems and Computing, vol. 871, pp. 504–521. Springer, Switzerland (2019)Google Scholar
  13. 13.
    Kolosov, E.V., Novikov, D.A., Tsvetkov, A.V.: Earned value in operational project management. NIC Apost- REF, Moskow (2000)Google Scholar

Copyright information

© Springer Nature Switzerland AG 2020

Authors and Affiliations

  1. 1.National Aerospace University «KhAI»KharkivUkraine

Personalised recommendations