Advertisement

Trial Runs and Restarts of Equipment After Maintenance Work

  • Kiran R. Golwalkar
Chapter

Abstract

These units shall be carefully run on trial after carrying out checks and repairs during maintenance. Their throughput shall be measured and performance shall be checked by observing operating conditions thereafter. All waste materials shall be disposed safely and without causing environmental pollution.

Keywords

Mechanical trials Various pumps Filter press Oil firing Air pollution control WESP Rotary screen Ball mill ID fan 

Copyright information

© Springer Nature Switzerland AG 2019

Authors and Affiliations

  • Kiran R. Golwalkar
    • 1
  1. 1.Consulting Chemical EngineerNagpurIndia

Personalised recommendations