Advertisement

Implementation of a Software Program for the Optimization of an Oil Pump Assembly Line

  • Leonardo F. M. Lemos
  • Radu Godina
  • João C. O. MatiasEmail author
Conference paper
Part of the Springer Proceedings in Mathematics & Statistics book series (PROMS, volume 281)

Abstract

Automotive companies are constantly facing new challenges and new demands such as international competition and increasing pressure to reduce costs and increase their performance. In this context, the use of certain types of software becomes a very important tool as a factor of differentiation of performance and quality compared to other companies. In this paper, a case study of a Portuguese automotive enterprise is considered in order to optimize the performance associated to a variable displacement oil pump assembly line. The objective is to implement and exploit the SAM (Suivi Arrêts Machine, in French, system for improving the means) software, a mechanism of control and monitoring of efficiency, in order to analyze which operations are more detrimental and which do not allow a determined production objective to be met. After the implementation phase, it will be necessary to define the indicators to be deduced from the software and to define the standard data collection and analysis. Afterwards, in order to disclose all the data, it will be necessary to create an animation board based on the Plan-Do-Check-Act Cycle (PDCA) to start monitoring the performance of the line and consequently increase its performance.

Keywords

Performance increase Standard work Visual management Information system Automotive industry 

Notes

Acknowledgements

This work was financially supported by the research unit on Governance, Competitiveness and Public Policy (project POCI-01-0145-FEDER-006939), funded by FEDER funds through COMPETE2020—POCI and by national funds through FCT—Fundação para a Ciência e a Tecnologia. Radu Godina would like to acknowledge financial support from Fundação para a Ciência e Tecnologia (UID/EMS/00667/2019).

References

  1. 1.
    Tan, Y., Zhang, Y., Khodaverdi, R.: Service performance evaluation using data envelopment analysis and balance scorecard approach: an application to automotive industry. Ann. Oper. Res. 248, 449–470 (2017)MathSciNetCrossRefGoogle Scholar
  2. 2.
    Bidarra, T., Godina, R., Matias, J.C.O., Azevedo, S.G.: SMED methodology implementation in an automotive industry using a case study method. Int. J. Ind. Eng. Manag. 9, 1–16 (2018)Google Scholar
  3. 3.
    Winkelhake, U.: The Digital Transformation of the Automotive Industry: Catalysts, Roadmap Practice. Springer, New York (2017)Google Scholar
  4. 4.
    Seethamraju, R., Marjanovic, O.: Role of process knowledge in business process improvement methodology: a case study. Bus. Process Manag. J. 15, 920–936 (2009)CrossRefGoogle Scholar
  5. 5.
    Schloßer, A., Schnitzler, J., Sentis, T., Richenhagen, J.: Agile processes in automotive industry – Efficiency and quality in software development. In: 16. Internationales Stuttgarter Symposium, pp. 489–503. Springer, Wiesbaden (2016)Google Scholar
  6. 6.
    Ferràs-Hernández, X., Tarrats-Pons, E., Arimany-Serrat, N.: Disruption in the automotive industry: a cambrian moment. Bus. Horiz. 60, 855–863 (2017)CrossRefGoogle Scholar
  7. 7.
    Wedeniwski, S.: Strategy, business model and architecture in today’s automotive industry. In: The Mobility Revolution in the Automotive Industry, pp. 75–238. Springer, Berlin (2015)Google Scholar
  8. 8.
    “Dana” Vanier, D.J.: Why industry needs asset management tools. J. Comput. Civ. Eng. 15, 35–43 (2001)CrossRefGoogle Scholar
  9. 9.
    Lai, S.-Y., Tsai, C.-H., Wei, L.-Y., Li, R.-K., Lu, M.-J.: The dilemma of Toyota production system implementation: a case study of Taiwan machine tool industries. Int. J. Acad. Res. Account. Financ. Manag. Sci. 5, 1–12 (2015)Google Scholar
  10. 10.
    Khanna, V.K., Shankar, R.: Journey to implement Toyota production system – a case studynull. J. Adv. Manag. Res. 5, 80–88 (2008)CrossRefGoogle Scholar
  11. 11.
    Majava, J., Ojanperä, T.: Lean production development in SMEs: a case study. Manag. Prod. Eng. Rev. 8, 41–48 (2017)Google Scholar
  12. 12.
    D’Antonio, G., Bedolla, J.S., Chiabert, P.: A novel methodology to integrate manufacturing execution systems with the lean manufacturing approach. Procedia Manuf. 11, 2243–2251 (2017)CrossRefGoogle Scholar
  13. 13.
    Pinto, J.L.Q., Matias, J.C.O., Pimentel, C., Azevedo, S.G., Govindan, K.: Just in Time Factory: Implementation Through Lean Manufacturing Tools. Springer, Cham (2018)Google Scholar
  14. 14.
    Berger, A.: Continuous improvement and kaizen: standardization and organizational designs. Integr. Manuf. Syst. 8, 110–117 (1997)CrossRefGoogle Scholar
  15. 15.
    de Vries, H.J.: Standardization: A Business Approach to the Role of National Standardization Organizations. Springer Science & Business Media, New York (2013)Google Scholar
  16. 16.
    Pereira, A., Abreu, M.F., Silva, D., Alves, A.C., Oliveira, J.A., Lopes, I., Figueiredo, M.C.: Reconfigurable standardized work in a lean company—a case study. In: Procedia CIRP, pp. 239–244. Elsevier (2016)Google Scholar
  17. 17.
    De Souza, C., De Souza, L., Migowski, S., Duarte, F.D.: Visual management in manufacturing companies: case study in brazilian market. In: Semana de la Ingeniería de Producción Sudamericana, pp. 1–8. Brasil (2013)Google Scholar
  18. 18.
    Koskela, L.: Application of the new production philosophy to construction. Stanford University (1992)Google Scholar
  19. 19.
    Tezel, B.A., Koskela, L.J., Tzortzopoulos, P.: The functions of visual management. In: International Research Symposium, pp. 201–219. Manchester, UK (2009)Google Scholar
  20. 20.
    Paul, R.J.: Challenges to information systems: time to change. Eur. J. Inf. Syst. 16, 193–195 (2007)CrossRefGoogle Scholar
  21. 21.
    O’Brien, J.: Introduction to information systems in business. In: Management Information Systems: A Managing Information Technology in the Internetworked Enterprise, pp. 4–35. Irwin/McGraw-Hill, Boston (1999)Google Scholar
  22. 22.
    Laudon, K., Laudon, J.P.: Organizations, management, and the networked enterprise. In: Management Information Systems, Global edn. pp. 31–69. Pearson (2013)Google Scholar
  23. 23.
    Alter, S.: Defining information systems as work systems: implications for the IS field. Eur. J. Inf. Syst. 17, 448–469 (2008)CrossRefGoogle Scholar
  24. 24.
    Alter, S.: Basic concepts for understanding systems. In: Information Systems: A Management Perspective, pp. 36–68. Addison-Wesley (1999)Google Scholar
  25. 25.
    Beynon-Davies, P.: Information Technology System. In: Information Systems: An Introduction to Informatics in Organisations. pp. 158–170. Palgrave Macmillan, Basingstoke (2002)Google Scholar
  26. 26.
    Dresch, A., Lacerda, D.P., Miguel, P.A.C.: A distinctive analysis of case study, action research and design science research. Rev. Bras. Gest. Neg. 17, 1116–1133 (2015)Google Scholar

Copyright information

© Springer Nature Switzerland AG 2019

Authors and Affiliations

  • Leonardo F. M. Lemos
    • 1
  • Radu Godina
    • 2
  • João C. O. Matias
    • 1
    • 3
    Email author
  1. 1.DEGEITUniversity of AveiroAveiroPortugal
  2. 2.Research and Development Unit in Mechanical and Industrial Engineering (UNIDEMI), Faculty of Science and Technology (FCT), Department of Mechanical and Industrial EngineeringUniversidade NOVA de LisboaCaparicaPortugal
  3. 3.GOVCOPP, University of AveiroAveiroPortugal

Personalised recommendations