Advertisement

Using Discrete Event Simulation for Planning Improvement in Small Batch Size Manufacturing System

  • Magdalena Jurczyk-BunkowskaEmail author
Chapter
Part of the Studies in Systems, Decision and Control book series (SSDC, volume 198)

Abstract

The article presents the case study research in planned changes in the manufacturing system of a small company in the furniture sector. The main purpose is to show a systematic approach to determining in which areas of the manufacturing system and what kind of changes will enable the company’s business goals to be achieved. A procedure for planning changes in the manufacturing system was developed and used in the conducted research. The assessment of the potential effects was conducted by means of the model of the manufacturing system developed in the Tecnomatix Plant Simulation programme. Thanks to it, it was possible to test the proposed variants of changes in the form of computer simulations. This allows to confront the expected profits with time, financial resources and risk. Linking the expected effects of changes to the business analysis enables us to rationally manage the development of the manufacturing system in different time frames. In the context of manufacturing system development the issue of sustainable production was also considered.

Keywords

Manufacturing systems Operations management Productivity Lean manufacturing Computer simulation 

Literature

  1. 1.
    Belekoukias, I., Garza-Reyes, J.A., Kumar, V.: The impact of lean methods and tools on the operational performance of manufacturing organizations. Int. J. Prod. Res. 52, 5346–5366 (2014)CrossRefGoogle Scholar
  2. 2.
    Bellgran, M., Safsten, K.: Production development: design and operation of production systems. Springer, London (2010)CrossRefGoogle Scholar
  3. 3.
    Bernolak, I.: Effective measurement and successful elements of company productivity: the basis of competitiveness and world prosperity. Int. J. Prod. Econ. 52(1), 203–213 (1997)CrossRefGoogle Scholar
  4. 4.
    Chase, R.B., Jacobs, F.R., Aquilano, N.J.: Operations Management: For Competitive Advantage, 11th edn. McGraw-Hill, New York (2006)Google Scholar
  5. 5.
    Chinda, T.: Structural equation modelling of productivity enhancement. J. Sci. Technol. 17(3), 259–276 (2010)Google Scholar
  6. 6.
    Gershwin, S.B.: Manufacturing Systems Engineering. Prentice-Hall, Englewood Cliffs, NJ (1994)Google Scholar
  7. 7.
    Kechiche, A., Soparnot, R.: CSR within SMEs: Literature review. Int. Bus. Res. 5(7), 97–104 (2012)CrossRefGoogle Scholar
  8. 8.
    Królczyk, G.M., Niesłony, P., Maruda, R.W., Wojciechowski, S.: Dry cutting effect in turning of a duplex stainless steel as a key factor in clean production. J. Clean. Prod. 142(4), 3343–3354 (2017)CrossRefGoogle Scholar
  9. 9.
    Lucey, J.: Productivity: What´s going on in Europe part II. Manag. Serv. 51(2), 32 (2007)Google Scholar
  10. 10.
    Manzouri, M., Ab-Rahman, M.N., Zain, C.R., Jamsari, E.A.: Increasing production and eliminating waste through lean tools and techniques for Halal food companies. Sustainability 6(12), 9179–9204 (2014)CrossRefGoogle Scholar
  11. 11.
    Melnyk, S., Stewart, D.M., Swink, M.: Metrics and performance measurement in operations management: dealing with the Metris Maze. J. Oper. Manag. 22(3), 209–218 (2004)CrossRefGoogle Scholar
  12. 12.
    Menzel, V., Smagin, J., David, F.: Cancompanies profit from greener manufacturing? Measuring Bus Excellence 14(2), 22–31 (2010)CrossRefGoogle Scholar
  13. 13.
    Mills, J., Neely, A. Platts, K. Richards, H.б Gregory, M.: The manufacturing strategy process: incorporating a learning perspective. Integr. Manuf. Syst. 9(3), 48–55 (1998)CrossRefGoogle Scholar
  14. 14.
    Neely, A., Jarrar, Y.: Extracting value from data the performance planning value chain. Bus. Process Manage. J. 10(5), 506–509 (2004)CrossRefGoogle Scholar
  15. 15.
    Pacheco, D., Pergher, I. et. al.: Strategies for increasing productivity in production systems. Independent J. Manage. Prod. 5(2), 344–359 (2014)Google Scholar
  16. 16.
    Prokopenko, J.: Productivity Management. A Practical Handbook. International Labour Organisation, Geneva (1987)Google Scholar
  17. 17.
    Rodrigues, M., Hatakeyama, K.: Analysis of the fall of TPM in companies. J. Mater. Process. Technol. 179(1–3), 276–279 (2006)CrossRefGoogle Scholar
  18. 18.
    Slack, N., Chambers, S., Johnston, R., Betts, A.: Operations and Process Management: Principles and Practice for Strategic Impact. 2nd ed. Harlow: New York: Prentice Hall (2009)Google Scholar
  19. 19.
    Smith, K.E.: The concept and importance of productivity. Chapter 2.1. Maynard´s. Industrial Engineering Hand Book, McGraw-Hill Professional (2001)Google Scholar
  20. 20.
    Staley, D.R., Kim, D.S.: Experimental results for the allocation of buffers in closed serial production lines. Int. J. Prod. Econ. 137, 284–291 (2012)CrossRefGoogle Scholar
  21. 21.
    Stevenson, W.J.: Operations management, 12th edn. Mc-Graw hill higher education, New York (2015)Google Scholar
  22. 22.
    Webb, A.: Project Management for Successful Product Innovation, 2nd edn. Routlege, New York (2017)CrossRefGoogle Scholar

Copyright information

© Springer Nature Switzerland AG 2020

Authors and Affiliations

  1. 1.Opole University of TechnologyOpolePoland

Personalised recommendations