An Effective Heuristic for a Single-Machine Scheduling Problem with Family Setups and Resource Constraints

  • Júlio C. S. N. Pinheiro
  • José E. C. ArroyoEmail author
  • Ricardo G. Tavares
Conference paper
Part of the Lecture Notes in Computer Science book series (LNCS, volume 11353)

Abstract

This paper presents a simple and effective iterated greedy heuristic to minimize the total tardiness in a single-machine scheduling problem. In this problem the jobs are classified in families and setup times are required between the processing of two jobs of different families. Each job requires a certain amount of resource that is supplied through upstream processes. The total resource consumed must not exceed the resource supply up. Therefore, jobs may have to wait and the machine has to be idle due to an insufficient availability of the resource. The iterated greedy heuristic is tested over an extensive computational experience on benchmark of instances from the literature and randomly generated in this work. Results show that the developed heuristic significantly outperforms a state-of-the-art heuristic in terms of solution quality.

Keywords

Single machine scheduling Family setup-times Resource constraints Total tardiness Meta-heuristics 

Notes

Acknowledgments

The authors thanks the financial support of FAPEMIG, CAPES and CNPq, Brazilian research agencies.

References

  1. 1.
    Allahverdi, A., Ng, C., Cheng, T.E., Kovalyov, M.Y.: A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187(3), 985–1032 (2008)MathSciNetzbMATHGoogle Scholar
  2. 2.
    Bigras, L.-P., Gamache, M., Savard, G.: The time-dependent traveling salesman problem and single machine scheduling problems with sequence dependent setup times. Discret. Optim. 5(4), 685–699 (2008)MathSciNetzbMATHGoogle Scholar
  3. 3.
    Briskorn, D., Choi, B.-C., Lee, K., Leung, J., Pinedo, M.: Complexity of single machine scheduling subject to nonnegative inventory constraints. Eur. J. Oper. Res. 207(2), 605–619 (2010)MathSciNetzbMATHGoogle Scholar
  4. 4.
    Briskorn, D., Jaehn, F., Pesch, E.: Exact algorithms for inventory constrained scheduling on a single machine. J. Sched. 16(1), 105–115 (2013)MathSciNetzbMATHGoogle Scholar
  5. 5.
    Du, J., Leung, J.Y.-T.: Minimizing total tardiness on one machine is np-hard. Math. Oper. Res. 15(3), 483–495 (1990)MathSciNetzbMATHGoogle Scholar
  6. 6.
    Emmons, H.: One-machine sequencing to minimize certain functions of job tardiness. Oper. Res. 17(4), 701–715 (1969)MathSciNetzbMATHGoogle Scholar
  7. 7.
    Fanjul-Peyro, L., Ruiz, R.: Iterated greedy local search methods for unrelated parallel machine scheduling. Eur. J. Oper. Res. 207(1), 55–69 (2010)MathSciNetzbMATHGoogle Scholar
  8. 8.
    Gupta, J.N., Chantaravarapan, S.: Single machine group scheduling with family setups to minimize total tardiness. Int. J. Prod. Res. 46(6), 1707–1722 (2008)zbMATHGoogle Scholar
  9. 9.
    Gupta, S.R., Smith, J.S.: Algorithms for single machine total tardiness scheduling with sequence dependent setups. Eur. J. Oper. Res. 175(2), 722–739 (2006)zbMATHGoogle Scholar
  10. 10.
    Herr, O., Goel, A.: Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints. Eur. J. Oper. Res. 248(1), 123–135 (2016)MathSciNetzbMATHGoogle Scholar
  11. 11.
    Koulamas, C.: The single-machine total tardiness scheduling problem: review and extensions. Eur. J. Oper. Res. 202(1), 1–7 (2010)MathSciNetzbMATHGoogle Scholar
  12. 12.
    Lawler, E.L.: A “pseudopolynomial” algorithm for sequencing jobs to minimize total tardiness. Ann. Discret. Math. 1, 331–342 (1977)MathSciNetzbMATHGoogle Scholar
  13. 13.
    Liao, C.-J., Juan, H.-C.: An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups. Comput. Oper. Res. 34(7), 1899–1909 (2007)zbMATHGoogle Scholar
  14. 14.
    Lin, S., Ying, K.: A hybrid approach for single-machine tardiness problems with sequence-dependent setup times. J. Oper. Res. Soc. 59(8), 1109–1119 (2008)Google Scholar
  15. 15.
    Potts, C.N., Kovalyov, M.Y.: Scheduling with batching: a review. Eur. J. Oper. Res. 120(2), 228–249 (2000)MathSciNetzbMATHGoogle Scholar
  16. 16.
    Potts, C.N., Van Wassenhove, L.N.: Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. J. Oper. Res. Soc. 43(5), 395–406 (1992)zbMATHGoogle Scholar
  17. 17.
    Ruiz, R., Stützle, T.: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. Eur. J. Oper. Res. 177(3), 2033–2049 (2007)zbMATHGoogle Scholar
  18. 18.
    Schaller, J.: Scheduling on a single machine with family setups to minimize total tardiness. Int. J. Prod. Econ. 105(2), 329–344 (2007)Google Scholar
  19. 19.
    Schaller, J.E., Gupta, J.N.: Single machine scheduling with family setups to minimize total earliness and tardiness. Eur. J. Oper. Res. 187(3), 1050–1068 (2008)MathSciNetzbMATHGoogle Scholar
  20. 20.
    Sen, T., Sulek, J.M., Dileepan, P.: Static scheduling research to minimize weighted and unweighted tardiness: a state-of-the-art survey. Int. J. Prod. Econ. 83(1), 1–12 (2003)Google Scholar
  21. 21.
    Sioud, A., Gravel, M., Gagné, C.: A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times. Comput. Oper. Res. 39(10), 2415–2424 (2012)MathSciNetzbMATHGoogle Scholar
  22. 22.
    Subramanian, A., Battarra, M., Potts, C.N.: An iterated local search heuristic for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times. Int. J. Prod. Res. 52(9), 2729–2742 (2014)Google Scholar
  23. 23.
    Tanaka, S., Araki, M.: An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times. Comput. Oper. Res. 40(1), 344–352 (2013)MathSciNetzbMATHGoogle Scholar
  24. 24.
    Jacob, V.V., Arroyo, J.E.C.: ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness. J. Appl. Math. 2016 (2016)Google Scholar
  25. 25.
    Ying, K.-C., Lin, S.-W., Huang, C.-Y.: Sequencing single-machine tardiness problems with sequence dependent setup times using an iterated greedy heuristic. Exp. Syst. Appl. 36(3), 7087–7092 (2009)Google Scholar

Copyright information

© Springer Nature Switzerland AG 2019

Authors and Affiliations

  • Júlio C. S. N. Pinheiro
    • 1
  • José E. C. Arroyo
    • 1
    Email author
  • Ricardo G. Tavares
    • 1
  1. 1.Department of Computer ScienceUniversidade Federal de ViçosaViçosaBrazil

Personalised recommendations