Advertisement

Define Phase and Strategy

  • Theodore T. Allen
Chapter

Abstract

This chapter focuses on the definition of a project, including the designation of who is responsible for what progress by when. By definition, those applying six sigma methods must answer some or all of these questions in the first phase of their system improvement or new system design projects. Also, according to what may be regarded as a defining principle of six sigma, projects must be cost-justified or they should not be completed. Often in practice, the needed cost justification must be established by the end of the “define” phase.

References

  1. Clausing D (1994) Total quality development: a step-by-step guide to world-class concurrent engineering. ASME Press, New YorkGoogle Scholar
  2. Goldratt EM, Cox J (2016) The goal: a process of ongoing improvement. RoutledgeGoogle Scholar
  3. Lee W, Mulliss C, Chiu HC (2000) On the Standard rounding rule for addition and subtraction. Chin J Phys 38:36–41Google Scholar
  4. Martin P, Oddo F, Tate K (1997) The project management memory jogger: a pocket guide for project teams. Goal/Qpc, Salem, NHGoogle Scholar
  5. Mullis C, Lee W (1998) On the standard rounding rule for multiplication and division. Chin J Phys 36:479–487Google Scholar
  6. Robert SC, Robert HM III, Robert GMH (2000) Robert’s rules of order, 10th edn. In: Robert HM III, Evans WJ, Honemann DH, Balch TJ (eds). Perseus Publishing, Cambridge, MAGoogle Scholar
  7. Streibel BJ (2002) The manager’s guide to effective meetings. McGraw-Hill, New YorkGoogle Scholar

Copyright information

© Springer-Verlag London Ltd., part of Springer Nature 2019

Authors and Affiliations

  1. 1.Industrial and Systems EngineeringThe Ohio State UniversityColumbusUSA

Personalised recommendations