The premise of this chapter is not to engage in the basic technologies of materials or the varied types of plant available to the principal contractor, but rather it is concerned with the management process of these two valuable resources. Plant, if poorly managed on construction projects, suffers from low utilisation rates, and materials are renowned for their high wastage figures. Therefore the principal contractor needs to concentrate efforts on the removal of non-value-adding activities.

Keywords

Supply Chain Supply Chain Management Senior Management Total Quality Management Construction Management 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Champy J. (1993) In Re-engineering, Organisational Change Must Start from Day One, CSC Insights, No. 4.Google Scholar
  2. Davenport T.H. (1993) Process Innovation — Re-engineering Work through Information Technology. Harvard Business Press, Cambridge, MA, ISBN 0–87584-366-2.Google Scholar
  3. Hammer M. and Champy J. (1993) Re-engineering the Corporation — A Manifesto for Business Revolution. Nicholas Brealey Publishing, ISBN 1–85788-029-3.Google Scholar
  4. Handfield R.B. and Nichols E.L. (1999) Introduction to Supply Chain Management. Prentice-Hall, Englewood Cliffs, New Jersey.Google Scholar
  5. Harrington H.J. (1991) Business Process Improvement — The Breakthrough Strategy for Total Quality, Productivity and Competitivensss. McGraw-Hill Inc., New York, ISBN 0–07-026768-5.Google Scholar
  6. Hellard R.B. (1995) Project Partnering: Principle and Practice. Thomas Telford, London, ISBN 0–7277-2043-0.CrossRefGoogle Scholar
  7. Ibbs C.W., Kartam S.A. and Ballard G. (1995) Re-engineering Construction Planning, Project Management Journal, June.Google Scholar
  8. Koskela L. (1992) Application of the New Production Philosophy to Construction, CIFE, Technical Report, No. 72. Stanford University, USA.Google Scholar
  9. Latham M., Sir (1994) Constructing the Team — Final Report of the Government/Industry Review of Procurement and Contractual Arrangements in the UK Construction Industry. HMSO, London, ISBN 0–11-752994-X.Google Scholar
  10. Miozzo M., Betts M., Clark A. and Grillo A. (1997) An IT-Enabled Process Innovation Strategy for Construction. Department of Surveying, University of Salford, UK.Google Scholar
  11. Mohamed S. and Tucker S. (1996) Options for Applying BPR in the Australian Construction Industry, International Journal of Project Management, 14(6), 279–385. Elsevier Science Ltd and IPMA, Great Britain, ISSN 0263–7863.CrossRefGoogle Scholar
  12. Schimming B.B. (1993) The Comming Competition Forum, Civil Engineering, 53(6), 18.Google Scholar
  13. Soles S. (1995) Work Re-engineering and Workflow — Comparative Methods. Future Strategies Inc., USA, ISBN 0–9640233-2-6.Google Scholar
  14. Vrijhoef R. (1998) Co-makership in Construction: Towards Construction Supply Chain Management, MSc Thesis, Delft University of Technology, The Netherlands [on-line]. Available at URL:http://www.cscm.net. Accessed 11 March 2001.
  15. Vrijhoef R. and Koskela L. (1999) Roles of Supply Chain Management in Construction [on-line]. Available at URL:http://www.ce.berkeley.edu/~tommelein/IGLC-7/PDF/Vrijhoef&Koskela.pdf. Accessed 11 March 2001.
  16. Wafa M.A. and Yasin M.M. (1998) A Concept Framework for Effective Implementation of JIT — An Empirical Investigation. [Cited 19 July 1999.] Available from internet URL:http://www.emerald-library.com/brev/02418kcl.htm.

Copyright information

© Alan Griffith and Paul Watson 2004

Authors and Affiliations

  • Alan Griffith
  • Paul Watson

There are no affiliations available

Personalised recommendations