Flow Shop Scheduling Problem of Minimizing Makespan with Bounded Processing Parameters

  • Conference paper
  • First Online:

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 1138))

Abstract

A three-machine flow shop scheduling problem of minimum makespan is addressed in this paper. The setup time and transportation time are considered as independent parameters of processing. Further, setup time, processing time and transportation time are considered to be stochastic rather than deterministic. It is observed that the actual value of these cannot be estimated in advance unless the processing of jobs is completed on each of the available machines and only prior information of lower and upper bounds is available. Since the exact value of the time required is not known in advance, there may not exist a unique optimal schedule of jobs. Therefore, it is desired to obtain the set of all dominating schedules and reduce the cardinality of solution set. To meet the claimed objective, the local and global dominance relations have been developed and the use of these relations is represented by numerical illustration.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. S. Aggarwal, A. Gautam, D.K. Chauhan, L.M. Tiwari, S. Kapoor, A flow shop scheduling problem with transportation time and separated setup time of jobs. Procedia Eng. 38, 1327–1332 (2012)

    Google Scholar 

  2. A. Allahverdi, The third comprehensive survey on scheduling problems with setup times/costs. Eur. J. Oper. Res. 246, 345–378 (2015)

    Article  MathSciNet  Google Scholar 

  3. A. Allahverdi, Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times. Decis. Mak. Manuf. Serv. 1(1–2), 5–23 (2017)

    Google Scholar 

  4. A. Allahverdi, F. Al-Anzi, A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. Eur. J. Oper. Res. 169, 767–780 (2006)

    Article  MathSciNet  Google Scholar 

  5. A. Allahverdi, Y.N. Sotskov, Two machine flowshop minimum length scheduling problem with random and bounded processing times. Int. Trans. Oper. Res. 10, 65–76 (2003)

    Article  MathSciNet  Google Scholar 

  6. P.C. Bagga, K. Khurana, Two-machine flowshop with separated sequence-independent setup times: mean completion time criterion. Indian J. Manag. Syst. 2, 47–57 (1986)

    Google Scholar 

  7. A.B. Chandramauli, Heuristic approach for n-job 3 machine flow shop scheduling problem involving transportation time, breakdown and weights of jobs. Math. Comput. Appl. 10(2), 301–305 (2005)

    Google Scholar 

  8. X. Dong, H. Huang, P. Chen, An improved NEH-based heuristic for permutation flow shop problem. Comput. Oper. Res. 35, 3962–3968 (2008)

    Article  Google Scholar 

  9. R. Gangadharan, C. Rajendran, A simulated annealing heuristic for scheduling in a flowshop with bicriteria. Comput. Ind. Eng. 27, 473–476 (1994)

    Article  Google Scholar 

  10. M.R. Garey, J.R. Johnson, R. Sethi, The complexity of flowshop and jobshop scheduling. Math. Oper. Res. 1(2), 117–129 (1986)

    Article  MathSciNet  Google Scholar 

  11. D. Gupta, S. Sharma, S. Sharma, Heuristic approach for n-jobs, 3-machines flow shop scheduling problem, processing time associated with probabilities involving transportation time, break-down interval, weightage of jobs and job block criteria. Math. Theory Model. 1(1), 30–36 (2011)

    Google Scholar 

  12. S.M. Johnson, Optimal two and three stage production schedules with setup time included. Naval Res. Log. Q. 1, 69–81 (1954)

    Article  Google Scholar 

  13. P.J. Kalczynski, J. Kamburowski, An improved NEH heuristic to minimize makespan in permutation flow shops. Comput. Oper. Res. 35, 3001–3008 (2009)

    Article  MathSciNet  Google Scholar 

  14. W. Liu, Y. Jin, M. Price, A new improved NEH heuristic for permutation flowshop scheduling problems. Int. J. Product. Econ. 193, 21–30 (2017)

    Article  Google Scholar 

  15. P.L. Maggu, G. Das, Elements of Advanced Production Scheduling (UPPD, New Delhi, 1980)

    Google Scholar 

  16. A. Mittal, S. Agarwal, S. Prasad, S.R. Ansari, Heuristic approach for n jobs, 3 machines flow shop scheduling problem involving transportation time, equivalent job block, weight of jobs and break down internval. Int. J. Appl. Math. Appl. 3(1), 77–84 (2011)

    Google Scholar 

  17. M. Nawaz, E.E. Enscore, I. Ham, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem. Omega. 11(1), 91–95 (1983)

    Google Scholar 

  18. C. Rajendran, H. Ziegler, Ant colony algorithms for permutation flow shop scheduling to minimize makespan/ total flowtime of jobs. Eur. j. op. Res. 155(2), 426–438 (2004)

    Google Scholar 

  19. R. Ruiz, T. Stutzle. An iterated greedy algorithm for permutation flow shop scheduling problem. Eur. J. Oper. Res. 177(3), 2033-2049 (2007)

    Google Scholar 

  20. Y.N. Sotskov, A. Allahverdi, T.C. Lai, Flowshop scheduling problem to minimize total completion time with random and bounded processing times. J. Oper. Res. Soc. 55, 277–286 (2004)

    Article  Google Scholar 

  21. L. Wang, D.Z. Zheng, An effective hybrid heuristic for flow shop scheduling. Int. J. Adv. Manuf. Tech. 21, 38–44 (2003)

    Article  Google Scholar 

  22. K.C. Ying, S.-W. Lin, A high-performing constructive heuristic for minimizing makespan in permutation flowshops. Int. J. Product. Ind. Eng. 36(6), 355–362 (2014)

    Google Scholar 

Download references

Acknowledgements

One of authors (Meenakshi Sharma) acknowledges the financial support provided by council of scientific and industrial research, New Delhi, India, in the form of SRF through grant number 09/135(0766)/2017-EMR-I.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sameer Sharma .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Sharma, M., Sharma, M., Sharma, S., Kumar, A. (2020). Flow Shop Scheduling Problem of Minimizing Makespan with Bounded Processing Parameters. In: Nagar, A., Deep, K., Bansal, J., Das, K. (eds) Soft Computing for Problem Solving 2019 . Advances in Intelligent Systems and Computing, vol 1138. Springer, Singapore. https://doi.org/10.1007/978-981-15-3290-0_14

Download citation

Publish with us

Policies and ethics