Abstract
The NB System is an inner-excavation pile installation method for steel pipe pile and steel pipe sheet pile using vibration equipment. The NB System drastically increases pile installation speed, as the vibration motion temporarily reduces the frictional resistance between the surface of pile and the surrounding soil. The NB System can be used to load-bearing layers that include rocks and boulders and to soft rock layers; it can be used to a maximum depth of about 90 m. The advantages of the NB System include improved installation accuracy, since it has possibility of extracting/correcting of install errors. Furthermore, the NB System can be used in areas where have environmental limitations, since its low vibration and noise emissions, and vibro can be operated only when needed. The NB System has been used for more than 50 projects in Japan. In this paper, we report a construction case of steel pipe piles with a length of 87.5 m and steel pipe sheet piles with a length of 43.5 m both using the NB system in bridge foundation work.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Harada, O., Itabashi, M., Komazawa, T., and Nomaki, M. (2019), Example of steel pile sheet pile installation method for deep steel pile in the ground with hard middle strata. The 74th JSCE Annual academic lecture.
Komazawa, T., Shimada, Y., and Terui, T.(2017), An application of a pile installation method combining inner excavation with vibration for steel pipe piles(NB System). International Conference on advancement pile technology and pile case histories (PILE 2017).
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Komazawa, T., Harada, O., Inazumi, K. (2020). Installation of steel pipe piles and steel pipe sheet pile for bridge foundation using vibratory inner-excavation method (NB SYSTEM). In: Duc Long, P., Dung, N. (eds) Geotechnics for Sustainable Infrastructure Development. Lecture Notes in Civil Engineering, vol 62. Springer, Singapore. https://doi.org/10.1007/978-981-15-2184-3_59
Download citation
DOI: https://doi.org/10.1007/978-981-15-2184-3_59
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-2183-6
Online ISBN: 978-981-15-2184-3
eBook Packages: EngineeringEngineering (R0)