Abstract

Construction productivity has been stagnating and declining for decades. Thus, developing continuous improvement processes is crucial. The aim of this research has been to explore if the 3rd step “analyse” in the 5-step activity analysis continuous improvement process could be further developed to, in one workflow, set targets, identify improvement areas, unveil root courses and create motivation for change in an integral way fitting the existing five-step process. An exploratory single case study was used to collect data through the methods of activity sampling, semi structured interviews and observations. The research showed that a workflow called the Feedback Loop, involving craftsmen, foremen and an activity analysis analyst, could set targets, identify improvement areas, unveil root causes and create motivation for change. This was done by empowering craftsmen and foremen, in collaboration with the activity analysis analyst, to analyse the activity sample in a 7-step Feedback Loop fitting the existing 3rd step “analyse”. The implications of this research are that we could adjust the already well proven activity analysis continuous improvement process to improve future results. The conclusion is that the Feedback Loop worked in this project and trade, but further research is needed in other contexts.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Alarcón LF (1993) Modeling waste and performance in construction. In: Proceedings of first annual conference of the international group for lean construction, pp 51–66

    Google Scholar 

  • Ballard G (2000) The last planner system of production control. Ph.D. thesis, School of Civil Engineering, University of Birmingham

    Google Scholar 

  • Byggeri D (2018) Konjukturanalyse [Economic Analysis]

    Google Scholar 

  • Choy E, Ruwanpura JY (2006) Predicting construction productivity using situation-based simulation models. Can J Civ Eng 33(12):1585–1600

    Article  Google Scholar 

  • Christian J, Hachey D (1995) Effects of delay times on production rates in construction. J Constr Eng Manag 121(1):20–26

    Article  Google Scholar 

  • CII (2010) Guide to activity analysis. University of Texas, TX

    Google Scholar 

  • Da Silva SFP (2006) Developing planning best practices to improve construction productivity. M.Sc. thesis, University of Calgary, Calgary, Alta

    Google Scholar 

  • Danish-Government (2014) Strategy for energy renovation of buildings: the route to energy-efficient buildings in tomorrow’s, Denmark. Build Up

    Google Scholar 

  • Farmer M (2016) The farmer review of the UK construction labour model. Construction Leadership Council. Available from: http://www.constructionleadershipcouncil.co.uk

  • Gong J, Borcherding JD, Caldas CH (2011) Effectiveness of craft time utilization in construction projects. Constr Manag Econ 29(7):737–751

    Article  Google Scholar 

  • Gouett MC, Haas CT, Goodrum PM, Caldas CH (2011) Activity analysis for direct-work rate improvement in construction. J Constr Eng Manag 137(12):1117–1124

    Article  Google Scholar 

  • Hajikazemi S, Andersen B, Langlo JA (2017) Analyzing electrical installation labor productivity through work sampling. Int J Product Perform Manag 66(4):539–553

    Article  Google Scholar 

  • Handa VK, Abdalla O (1989) Forecasting productivity by work sampling. Constr Manag Econ 7(1):19–28

    Article  Google Scholar 

  • Hwang BG, Krishnankutty P, Zhu L, Caldas CH, Shounak A, Mulva S (2018) Improving labour productivity in process construction maintenance and shutdown/turnaround projects. Int J Constr Manag 1–15

    Google Scholar 

  • IPPC (2018) Global warming of 1.5 degree celsius. IPPC: Intergovernmental Panel on Climate Changes. Available from: http://ipcc.ch/report/sr15/

  • Josephson PE, Björkman L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. J Eng Constr Archit Manag 20(6):589–603

    Article  Google Scholar 

  • Kaming PF, Olomolaiye PO, Holt GD, Harris FC (1997) Factors influencing craftsmen’s productivity in Indonesia. Int J Project Manag 15(1):21–30

    Article  Google Scholar 

  • Kaplan RS, Cooper R (1998) Cost & effect: using integrated cost systems to drive profitability and performance. Harvard Business School Press, Boston

    Google Scholar 

  • Kenley R, Seppänen O (2010) Location-based management for construction—planning, scheduling and control. Spoon Press, UK

    Google Scholar 

  • Koskela L (2004) Making-do—the eighth category of waste. In: Proceedings of 12th annual conference of the international group for lean construction, Helsingør, Denmark, pp 1–10

    Google Scholar 

  • LCICG (2012) Technology innovation needs assessment (TINA)—non-domestic buildings summary report. LCICG: Low Carbon Innovation Coordination Group

    Google Scholar 

  • Liker JK, Meier D (2006) The Toyota way fieldbook: a practical guide for implementing Toyota’s 4Ps. McGraw-Hill, New York

    Google Scholar 

  • Neve H, Wandahl S (2018) Towards identifying making-do as lead waste in refurbishment projects. In: Proceedings of the 26th annual conference of the international group for lean construction, iglc.net, pp 1354–1364

    Google Scholar 

  • Olomolaiye PO, Wahab KA, Price ADF (1987) Problems influencing craftsmen’s productivity in Nigeria. Build Environ 22(4):317–323

    Article  Google Scholar 

  • Parker N, Lema N, Mlingwa G (1987) An analysis of labour productivity in Tanzania. In: Proceedings of 5th CIB W65 International symposium on the organisation and management of construction: managing construction worldwide. E. & F. N. Spon, pp 835–845

    Google Scholar 

  • Peer S (1986) An improved systematic activity sampling technique for work study. Constr Manag Econ 4(2):151–159

    Article  Google Scholar 

  • Picard HE (2002) Construction process measurement and improvement. In: Proceedings of 10th annual conference of the international group for lean construction, Gramado, Brazil

    Google Scholar 

  • Ravetz J (2008) State of the stock—what do we know about existing buildings and their future prospects? Energy Policy 36(12):4462–4470

    Article  Google Scholar 

  • Ritchie BW, Burns PM, Palmer CA (2005) Tourism research methods: integrating theory with practice. Cabi Publishing

    Google Scholar 

  • Shahtaheri M (2012) Setting target rates for construction activity analysis categories. Master of Applied Science thesis, University of Waterloo

    Google Scholar 

  • Terp BE, Christiansen NM, Lindegaard IM (1987) Metode Styring—Produktionsteknik (Method management—production technology). Erhversskolernes Forlag, Denmark

    Google Scholar 

  • Thomas HR, Daily J (1983) Crew performance measurement via activity sampling. J Constr Eng Manag 109(3):309–320

    Article  Google Scholar 

  • Thune-Holm E, Johansen K (2006) Produktivitetsmålinger i Skanska [Productivity measurement in Skanska]. Internal Skanska Report, Oslo

    Google Scholar 

  • Tippet LHC (1935) A snap reading method of making time studies of machines and operatives in factory surveys. J Br Text Inst Trans 26

    Google Scholar 

  • Winch G, Carr B (2001) Benchmarking on-site productivity in France and the UK: a CALIBRE approach. Constr Manag Econ 19(6):577–590

    Article  Google Scholar 

  • Womack JP, Jones DT (1996) Lean thinking: banish waste and create wealth in your corporation. Simon and Shuster, New York

    Google Scholar 

  • Yin RK (2009) Case study research—design and methods. SAGE, London

    Google Scholar 

Download references

Acknowledgements

This research is part of the REVALUE research project, a USD 3.4 million research project on refurbishment of social housing buildings sponsored by The Innovation Fund Denmark.

Furthermore, the support and openness from the case contractors and sub-contractors, and the help from engineering students to collect data have been highly valuable.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hasse H. Neve .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Neve, H.H., Wandahl, S., Lerche, J. (2020). Feedback Loop—The Missing Link in Activity Analysis. In: Panuwatwanich, K., Ko, CH. (eds) The 10th International Conference on Engineering, Project, and Production Management . Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-1910-9_38

Download citation

  • DOI: https://doi.org/10.1007/978-981-15-1910-9_38

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-15-1909-3

  • Online ISBN: 978-981-15-1910-9

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics