Abstract
Construction productivity has been stagnating and declining for decades. Thus, developing continuous improvement processes is crucial. The aim of this research has been to explore if the 3rd step “analyse” in the 5-step activity analysis continuous improvement process could be further developed to, in one workflow, set targets, identify improvement areas, unveil root courses and create motivation for change in an integral way fitting the existing five-step process. An exploratory single case study was used to collect data through the methods of activity sampling, semi structured interviews and observations. The research showed that a workflow called the Feedback Loop, involving craftsmen, foremen and an activity analysis analyst, could set targets, identify improvement areas, unveil root causes and create motivation for change. This was done by empowering craftsmen and foremen, in collaboration with the activity analysis analyst, to analyse the activity sample in a 7-step Feedback Loop fitting the existing 3rd step “analyse”. The implications of this research are that we could adjust the already well proven activity analysis continuous improvement process to improve future results. The conclusion is that the Feedback Loop worked in this project and trade, but further research is needed in other contexts.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Alarcón LF (1993) Modeling waste and performance in construction. In: Proceedings of first annual conference of the international group for lean construction, pp 51–66
Ballard G (2000) The last planner system of production control. Ph.D. thesis, School of Civil Engineering, University of Birmingham
Byggeri D (2018) Konjukturanalyse [Economic Analysis]
Choy E, Ruwanpura JY (2006) Predicting construction productivity using situation-based simulation models. Can J Civ Eng 33(12):1585–1600
Christian J, Hachey D (1995) Effects of delay times on production rates in construction. J Constr Eng Manag 121(1):20–26
CII (2010) Guide to activity analysis. University of Texas, TX
Da Silva SFP (2006) Developing planning best practices to improve construction productivity. M.Sc. thesis, University of Calgary, Calgary, Alta
Danish-Government (2014) Strategy for energy renovation of buildings: the route to energy-efficient buildings in tomorrow’s, Denmark. Build Up
Farmer M (2016) The farmer review of the UK construction labour model. Construction Leadership Council. Available from: http://www.constructionleadershipcouncil.co.uk
Gong J, Borcherding JD, Caldas CH (2011) Effectiveness of craft time utilization in construction projects. Constr Manag Econ 29(7):737–751
Gouett MC, Haas CT, Goodrum PM, Caldas CH (2011) Activity analysis for direct-work rate improvement in construction. J Constr Eng Manag 137(12):1117–1124
Hajikazemi S, Andersen B, Langlo JA (2017) Analyzing electrical installation labor productivity through work sampling. Int J Product Perform Manag 66(4):539–553
Handa VK, Abdalla O (1989) Forecasting productivity by work sampling. Constr Manag Econ 7(1):19–28
Hwang BG, Krishnankutty P, Zhu L, Caldas CH, Shounak A, Mulva S (2018) Improving labour productivity in process construction maintenance and shutdown/turnaround projects. Int J Constr Manag 1–15
IPPC (2018) Global warming of 1.5 degree celsius. IPPC: Intergovernmental Panel on Climate Changes. Available from: http://ipcc.ch/report/sr15/
Josephson PE, Björkman L (2013) Why do work sampling studies in construction? The case of plumbing work in Scandinavia. J Eng Constr Archit Manag 20(6):589–603
Kaming PF, Olomolaiye PO, Holt GD, Harris FC (1997) Factors influencing craftsmen’s productivity in Indonesia. Int J Project Manag 15(1):21–30
Kaplan RS, Cooper R (1998) Cost & effect: using integrated cost systems to drive profitability and performance. Harvard Business School Press, Boston
Kenley R, Seppänen O (2010) Location-based management for construction—planning, scheduling and control. Spoon Press, UK
Koskela L (2004) Making-do—the eighth category of waste. In: Proceedings of 12th annual conference of the international group for lean construction, Helsingør, Denmark, pp 1–10
LCICG (2012) Technology innovation needs assessment (TINA)—non-domestic buildings summary report. LCICG: Low Carbon Innovation Coordination Group
Liker JK, Meier D (2006) The Toyota way fieldbook: a practical guide for implementing Toyota’s 4Ps. McGraw-Hill, New York
Neve H, Wandahl S (2018) Towards identifying making-do as lead waste in refurbishment projects. In: Proceedings of the 26th annual conference of the international group for lean construction, iglc.net, pp 1354–1364
Olomolaiye PO, Wahab KA, Price ADF (1987) Problems influencing craftsmen’s productivity in Nigeria. Build Environ 22(4):317–323
Parker N, Lema N, Mlingwa G (1987) An analysis of labour productivity in Tanzania. In: Proceedings of 5th CIB W65 International symposium on the organisation and management of construction: managing construction worldwide. E. & F. N. Spon, pp 835–845
Peer S (1986) An improved systematic activity sampling technique for work study. Constr Manag Econ 4(2):151–159
Picard HE (2002) Construction process measurement and improvement. In: Proceedings of 10th annual conference of the international group for lean construction, Gramado, Brazil
Ravetz J (2008) State of the stock—what do we know about existing buildings and their future prospects? Energy Policy 36(12):4462–4470
Ritchie BW, Burns PM, Palmer CA (2005) Tourism research methods: integrating theory with practice. Cabi Publishing
Shahtaheri M (2012) Setting target rates for construction activity analysis categories. Master of Applied Science thesis, University of Waterloo
Terp BE, Christiansen NM, Lindegaard IM (1987) Metode Styring—Produktionsteknik (Method management—production technology). Erhversskolernes Forlag, Denmark
Thomas HR, Daily J (1983) Crew performance measurement via activity sampling. J Constr Eng Manag 109(3):309–320
Thune-Holm E, Johansen K (2006) Produktivitetsmålinger i Skanska [Productivity measurement in Skanska]. Internal Skanska Report, Oslo
Tippet LHC (1935) A snap reading method of making time studies of machines and operatives in factory surveys. J Br Text Inst Trans 26
Winch G, Carr B (2001) Benchmarking on-site productivity in France and the UK: a CALIBRE approach. Constr Manag Econ 19(6):577–590
Womack JP, Jones DT (1996) Lean thinking: banish waste and create wealth in your corporation. Simon and Shuster, New York
Yin RK (2009) Case study research—design and methods. SAGE, London
Acknowledgements
This research is part of the REVALUE research project, a USD 3.4 million research project on refurbishment of social housing buildings sponsored by The Innovation Fund Denmark.
Furthermore, the support and openness from the case contractors and sub-contractors, and the help from engineering students to collect data have been highly valuable.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Neve, H.H., Wandahl, S., Lerche, J. (2020). Feedback Loop—The Missing Link in Activity Analysis. In: Panuwatwanich, K., Ko, CH. (eds) The 10th International Conference on Engineering, Project, and Production Management . Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-1910-9_38
Download citation
DOI: https://doi.org/10.1007/978-981-15-1910-9_38
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-1909-3
Online ISBN: 978-981-15-1910-9
eBook Packages: EngineeringEngineering (R0)