Skip to main content

Part of the book series: Lecture Notes in Mechanical Engineering ((LNME))

  • 1421 Accesses

Abstract

Formwork is one of major engineering works in reinforced concrete projects. Its performance affects project success and therefore profitability. Formwork engineering could be divided into design and construction phases. Conventional formwork engineering involves unnecessary non-value-adding activities, such as change orders and material movement. The objective of this study is to applying lean thinking in formwork design to reduce unnecessary waste, increase design reliability, and enhance construability. A lean thinking formwork design process is proposed to achieve the goal. Concurrent design and Building Information Modeling (BIM) ideas are used in the process to improve visibility. Design reliability is improved using design correctness reviewed by project stakeholders. Thus, a continuous learning culture is developed. A real building project is used to validate the feasibility of the proposed method. Analysis results demonstrate that the proposed approach could be used to increase design reliability and enhance construability, thus reduce unnecessary waste in formwork design.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Aleisa E, Suresh NC, Lin L (2011) Team formation in concurrent engineering using group technology (gt) concepts. Concur Eng Res Appl 19(3):213–224

    Article  Google Scholar 

  • Bajjou MS, Chafi A, En-Nadi A (2017) A comparative study between lean construction and the traditional production system. Int J Eng Res Afr 29:118–132

    Article  Google Scholar 

  • Choo YS (2008) Reasons and cost for design change during construction and correspondence process analysis. MS thesis, National Cheng Kung University, Tainan, Taiwan (in Chinese)

    Google Scholar 

  • Eriksson PE (2010) Improving construction supply chain collaboration and performance: a lean construction pilot project. Supply Chain Manag Int J 15(5):394–403

    Article  Google Scholar 

  • Kikolski M, Ko CH (2018) Facility layout design—review of current research direction. Eng Manag Prod Serv 10(3):70–79

    Google Scholar 

  • Ko CH (2016) Improving formwork engineering through lean thinking. Research Report, Ministry of Science and Technology, Taiwan

    Google Scholar 

  • Ko CH, Kuo JD (2019) Making formwork design lean. J Eng Proj Prod Manag 9(1):29–47

    Google Scholar 

  • Ko CH, Wang WC, Kuo JD (2011) Improving formwork engineering using the toyota way. J Eng Proj Prod Manag 1(1):13–27

    Google Scholar 

  • Nahmens I, Ikuma LH (2012) Effects of lean construction on sustainability of modular homebuilding. J Arch Eng ASCE 18(2):155–163

    Article  Google Scholar 

  • Ohno T (1988) Toyota production system. Productivity Press, Cambridge

    Book  Google Scholar 

  • Peng YH (1992) Investigation and analysis of taiwan construction energy II. Research Report, Architecture and Building Research Institute, Ministry of the Interior, Taipei, Taiwan (in Chinese)

    Google Scholar 

  • Santilli A, Puente I, Tanco M (2011) A factorial design study to determine the significant parameters of fresh concrete lateral pressure and initial rate of pressure decay. Constr Build Mater 25(4):1946–1955

    Article  Google Scholar 

  • Williams N, Stehling H, Scheurer F, Oesterle S, Kohler M, Gramazio F (2011) A case study of a collaborative digital workflow in the design and production of formwork for ‘non-standard’ concrete structures. Int J Arch Comput 9(3):223–240

    Google Scholar 

Download references

Acknowledgements

This research was sponsor by Ministry of Science and Technology, Taiwan with grant number MOST 103-2221-E-020-027-MY2. Special thanks are due to graduate student Jiun-De Kuo who helped in data collection and data analysis.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chien-Ho Ko .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Ko, CH. (2020). Improving Formwork Design Using Lean Thinking. In: Panuwatwanich, K., Ko, CH. (eds) The 10th International Conference on Engineering, Project, and Production Management . Lecture Notes in Mechanical Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-1910-9_36

Download citation

  • DOI: https://doi.org/10.1007/978-981-15-1910-9_36

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-15-1909-3

  • Online ISBN: 978-981-15-1910-9

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics