Skip to main content

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 582))

Abstract

In order to solve the problem of combined Distribution of molds on the mold table in the production line of Prefabricated component, this paper proposes a method that combined improved Bottom-Left (BL) Placement Policy with the improved Electromagnetism-like Mechanism (EM) algorithm to solve the problem. Firstly, the mathematical model of the combined distribution of the mold on the mold table is established. The improved EM algorithm is used to optimize the order of the Prefabricated components. Secondly, according to the size of mold and mold table, the molds are distributed to the mold tables. An improved BL Placement Policy is proposed to determine the angle and position of molds on the mold tables. Finally, through the simulation test of the actual production enterprise’s instance data, the effectiveness of the proposed new method is verified to solve the problem of combined distribution problem of mold on the mold table.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 299.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 379.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 379.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Chen, F., Ren, C., Lu, Z., Guo, S., Wang, Z.: Application of ERP and MES system in intelligent manufacturing of prefabricated building components. J. Concrete World, 103, 39–41 (2018)

    Google Scholar 

  2. Wu, T., Yang, J., Liu, Z., Jiang, X.: Optimization of two-dimensional layout problem based on improved discrete firefly algorithm. J. Chin. Sci. Pap. 13(2), 153–156 (2018)

    Google Scholar 

  3. Song, P., Cui, Y., Chen, X., Yang, Y.: Discrete particle swarm optimization algorithm for solving rectangular components layout problem. J. Mech. Eng. 1, 86–87 (2007)

    Google Scholar 

  4. Wang, Z., Chen, X.: Optimization of die arrangement in the production of preformed panels based on genetic algorithm. J. Eng. Manage. 33(1), 45–49 (2019)

    Google Scholar 

  5. Zhang, L., Wang, Y.: Construction and quality control of small concrete precast members of high speed railway. J. Sichuan Hydropower 37(1), 99–101 (2018)

    Google Scholar 

  6. Liu, M., et al.: Research on production scheduling optimization model of precast concrete members based on MILP algorithm. J. Eng. Manage. 32(6), 121–126 (2018)

    Google Scholar 

  7. Healy, P., Creavin, M., Kuusik, A.: An optimal algorithm for rectangle placement. Oper. Res. 24, 73–80 (1999)

    MathSciNet  MATH  Google Scholar 

  8. Jiang, Y., Pan, F.: Improved heuristic algorithm for modern industrial production scheduling. J. IJMIC 30(4), 284–292 (2018)

    Article  Google Scholar 

  9. Han, Z., Sun, Y., Lin, S.: Research on electromagnetic algorithms for solving LBFFSP. J. Control Eng. 24(8), 1–8 (2015)

    Google Scholar 

  10. Liu, A., Yang, Y., Li, F., Xing, Q., Lu, H., Zhang, Y.: Chaotic simulated annealing particle swarm optimization research and its application. J. Zhejiang Univ. (Eng. Sci.) 47(10), 1722–1730 (2013)

    Google Scholar 

  11. Zhang, J., Chen, J., Zhang, H.: Job-shop schedule modelling and parents-crossover evolutionary optimization for integrated production schedules. J. IJCAT 58(4), 288–295 (2018)

    Article  Google Scholar 

  12. Li, Y.: Discussion on the production process of fabricated building components. J. Concr. Cem. Prod. 12, 65–68 (2017)

    Google Scholar 

  13. Liu, H., He, Y.: Two-dimensional irregular shape layout algorithm based on center NFP. J. China Mech. Eng. 18(6), 723–731 (2007)

    Google Scholar 

  14. Bilel, N., Mohamed, N.: A novel multi-criteria self-organising migrating algorithm for engineering problems. IJCAT 57(3), 219–227 (2018)

    Article  Google Scholar 

Download references

Acknowledgements

Shenyang Science and Technology Bureau Double Hundred Project “Transformation of Digital Factory Technology in Lean Production Mode in Prefabricated Building Prefabricated component Manufacturing Enterprises” (Z18-5-015) January 2018–December 2019.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Shuai Wang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Luan, F., Wang, S., Han, Z., Cui, H. (2020). EM Algorithm-Based Combined Distribution of Mold on the Mold Table. In: Wang, R., Chen, Z., Zhang, W., Zhu, Q. (eds) Proceedings of the 11th International Conference on Modelling, Identification and Control (ICMIC2019). Lecture Notes in Electrical Engineering, vol 582. Springer, Singapore. https://doi.org/10.1007/978-981-15-0474-7_120

Download citation

Publish with us

Policies and ethics