Skip to main content

Joint Optimization of Flexible Periodic Preventive Maintenance and Nonidentical Parallel Machines Scheduling with Consideration of Delivery on Time

  • Conference paper
  • First Online:
Proceeding of the 24th International Conference on Industrial Engineering and Engineering Management 2018

Abstract

This paper targeted at multiobjective integration optimization of equipment maintenance and production scheduling. We take all speed parallel machines as an example, providing that flexible periodic preventive maintenance and repair maintenance is adopted as the maintenance strategy. A mixed integrated mathematical model is constructed simultaneously including makespan, maintenance cost, total tardiness time and considering JIT strategy. A Pareto-based multiobjective hybrid variable neighborhood genetic algorithm is designed to solve the model. The computational results show that it is efficient, and is advantageous over standard genetic algorithms. Finally, the effectiveness of the model and the algorithm are validated via a given case.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Y. Yin, Y. Wang, T.C.E. Cheng, W. Liu, J. Li, Parallel-machine scheduling of deteriorating jobs with potential machine disruptions. Omega 69, 17–28 (2017)

    Article  Google Scholar 

  2. L. Xiao, S. Song, X. Chen, D.W. Coit, Joint optimization of production scheduling and machine group preventive maintenance. Reliab. Eng. Syst. Saf. 146, 68–78 (2016)

    Article  Google Scholar 

  3. M. Shahriari et al., JIT single machine scheduling problem with periodic preventive maintenance. J. Ind. Eng. Int. 12(3), 299–310 (2016)

    Article  Google Scholar 

  4. J.-Y. Lee, Y.-D. Kim, Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance. Comput. Oper. Res. 39(9), 2196–2205 (2012)

    Article  Google Scholar 

  5. K. Sun, H. Li, Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines. IJPEconomics 124(1), 151–158 (2010)

    Google Scholar 

  6. J. He, Q. Li, X. Dehua, Scheduling two parallel machines with machine-dependent availabilities. Comput. Oper. Res. 72, 31–42 (2016)

    Article  Google Scholar 

  7. C. Low, M. Ji, C.-J. Hsu, S. Chwen-Tzeng, Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Appl. Math. Model. 34(2), 334–342 (2010)

    Article  Google Scholar 

  8. M.-C. Fitouhi, M. Nourelfath, Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems. Reliab. Eng. Syst. Saf. 121, 175–186 (2014)

    Article  Google Scholar 

  9. W.-W. Cui, L. Zhiqiang, Minimizing the makespan on a single machine with flexible maintenances and jobs’ release dates. Comput. Oper. Res. 80, 11–22 (2017)

    Article  Google Scholar 

  10. C. Low, C.-J. Hsu, S. Chwen-Tzeng, A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance. Expert Syst. Appl. 37(9), 6429–6434 (2010)

    Article  Google Scholar 

  11. E. Lalla-Ruiz, S. Voß, Modeling the parallel machine scheduling problem with step deteriorating jobs. EJOR 255(1), 21–33 (2016)

    Article  Google Scholar 

  12. J. Yoo, I. Lee, Parallel machine scheduling with maintenance activities. Comput. Ind. Eng. 101, 361–371 (2016)

    Article  Google Scholar 

  13. D.T. Nguyen, Y. Dijoux, M. Fouladirad, Analytical properties of an imperfect repair model and application in preventive maintenance scheduling. EJOR 256(2), 439–453 (2017)

    Article  Google Scholar 

  14. H. Mokhtari, A. Hasani, An energy-efficient multi-objective optimization for flexible job-shop scheduling problem. Comput. Chem. Eng. 104, 339–352 (2017)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ji-shan Zhang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Singapore Pte Ltd.

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Zhang, Js., Lou, Hy., Liu, Yr. (2019). Joint Optimization of Flexible Periodic Preventive Maintenance and Nonidentical Parallel Machines Scheduling with Consideration of Delivery on Time. In: Huang, G., Chien, CF., Dou, R. (eds) Proceeding of the 24th International Conference on Industrial Engineering and Engineering Management 2018. Springer, Singapore. https://doi.org/10.1007/978-981-13-3402-3_9

Download citation

Publish with us

Policies and ethics