Skip to main content

The History of Electric Enterprises and Power Supply Development in Tokyo Since the Meiji Era

  • Chapter
  • First Online:
Tokyo as a Global City

Part of the book series: International Perspectives in Geography ((IPG,volume 8))

  • 1308 Accesses

Abstract

This paper undertakes a detailed study of the history of Tokyo’s electric industry and debates its current problems. On March 11, 2011, Fukushima Daiichi nuclear power plant, located in Fukushima Prefecture, was destroyed by a tsunami that followed the 2011 Tohoku earthquake. Due to the consequential power shortage in the Tokyo Electric Power Company’s supply area, scheduled blackouts were carried out for weeks. Accordingly, Tokyo’s citizens realized that a large share of the electricity they consumed had been produced by the nuclear plants located in rural areas, such as Fukushima Prefecture. Tokyo (formerly Edo) is located in the middle of Kanto Plain and has been one of the centers of Japan since the Tokugawa period (1603–1868). It became the country’s capital in the Meiji era (1868–1912). Since then, as modernization progresses, it has transpired that its location poses inherent difficulties regarding the local consumption of locally produced electricity. Initially, electricity was supplied locally by thermal power generation. However, the base of power generation moved to areas outside Tokyo before World War II, when large-scale hydroelectric power plants were constructed. Moreover, after 1970, nuclear power plants were built in distant places. Consequently, Tokyo’s electricity self-sufficiency rate fell from 14.6% in 1934 to only 3% in 2012.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 139.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 179.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 179.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    In Japanese, “Dento” is the name of a company that supplies electricity. “Denki,” in Table 15.2, has the same meaning, and “Suiryoku” indicates hydro-power.

  2. 2.

    Japanese Government ordered the inhabitant the evacuation on April 22, 2011. The range of the area is as follows: area of 30 km in radius from nu-clear plant, and area with high radiation level which exceeds 30 km in radius. The pollution area by the radioactivity exceeds 8000 km2, among those, the evacuation order area is about 1100 km2, and, the person who had to do the evacuation reached 85,000 people.

References

  • Communication Department (1915) The 7th directory of the electric supply industry (in Japanese)

    Google Scholar 

  • Communication Department (1937) List of permitted locations for hydroelectric power plants (in Japanese)

    Google Scholar 

  • Communication Department (1939) The 30th directory of the electric supply industry (in Japanese)

    Google Scholar 

  • Hanai S (2000) Accumulation of Capital of Light Industry. In: Ishi K, Hara A, Takeda H (eds) Economic history in Japan, vol 2. Industrial Revolution Period. University of Tokyo Press, Tokyo. (in Japanese)

    Google Scholar 

  • Kamibayashi T (1948) Growth of Industry in Japan. Gakuseisyobou, Tokyo. (in Japanese)

    Google Scholar 

  • Kurihara T (Ed.) (1964) The history of Japanese industrial development, Kojunsya. (in Japanese)

    Google Scholar 

  • Miake H (1951) Electric enterprise in Japan. Shunjusha, Tokyo. (in Japanese)

    Google Scholar 

  • Nishino T (2012) History of electric enterprise before World War II in Gunma Prefecture and consideration concerning modern electric business problems in Japan. In Center of Regional Policy Study, Takasaki City University of Economics (ed) Rediscovery of Gunma Prefecture. Jyomo Newspaper Press, Maebashi of Gunma Prefecture (in Japanese)

    Google Scholar 

  • Nishino T (2013) Management and characteristics of electric power industry by union municipality before World War II. Shogaku ronshu (Fukushima University) 81(4):203–223. (in Japanese)

    Google Scholar 

  • Nishino T (2014a) The history of electric utility companies and power supply development in Tokyo since the Meiji Era. J Geogr (Chigaku Zasshi) 123:298–314. (in Japanese with English abstract)

    Article  Google Scholar 

  • Nishino T (2014b) Development and characteristics of a municipal electricity utility in Japan before World War II. Chiiki Seisaku Kenkyu (Takasaki City University of Economics) 16(2):1–19. (in Japanese with English abstract)

    Google Scholar 

  • Nishino T (2016) Development and characteristics of the electric power industry managed by prefectures before World War II. Kyodai keizai ronso (Kyoto University) (forthcoming)

    Google Scholar 

  • Tokyo Electric Power Company (2002) Electric power industry in the Kanto district and Tokyo Electric Power Company (in Japanese)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Toshiaki Nishino .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer Nature Singapore Pte Ltd.

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Nishino, T. (2018). The History of Electric Enterprises and Power Supply Development in Tokyo Since the Meiji Era. In: Kikuchi, T., Sugai, T. (eds) Tokyo as a Global City. International Perspectives in Geography, vol 8. Springer, Singapore. https://doi.org/10.1007/978-981-10-7638-1_15

Download citation

Publish with us

Policies and ethics