Evolution and New Source of Motivation

  • Chapter
  • First Online:
  • 874 Accesses

Part of the book series: Springer Tracts in Civil Engineering ((SPRTRCIENG))

Abstract

This chapter goes through the history of the floatover concept development and briefly summarizes the process of technology evolution. The success of the execution of floatover projects since its early invention is accompanied with continuous technology improvement. The HIDECK floatover started by using selected barges towed by tugs/OCVs. To handle the floatover installation of the ever enlarged platforms in open sea with long transportation journey, self-propelled HLVs and DP technology have been introduced to make the project execution more cost-effective. Catamaran floatover technology has also been seriously considered for the platform decommissioning. New vessel concepts stemmed from floatover technology such as the Pioneering Spirit, DISV, etc. show the efforts of making the floatover operations safer, faster, less hindered by environmental conditions and cost-effective have never been spared.

The original version of this chapter was revised: See the “Chapter Note” section at the end of this chapter for details. The erratum to this chapter is available at 10.1007/978-981-10-3617-0_11

This is a preview of subscription content, log in via an institution.

References

  1. Zoontjes, R.: “Preparation for a world record float-over project”, Presentation for the center for offshore research and engineering and department of Civil and environmental engineering of National University of Singapore, Singapore April 2014

    Google Scholar 

  2. News: “Transport and installation of Piltun-Astokhskoye-B platform”, Poshterasea 5 Jul 2007

    Google Scholar 

  3. Bokhorst, J., et al.: “Float-over analysis for world’s largest float-over barge”. OMAE2011-49462, pp. 679–686, Rotterdam, Netherlands June 2011

    Google Scholar 

  4. Beerendonk, M., et al.: “Float-over operations using dynamically positioned vessels”. Marine Heavy Transport & Lift II, London, UK, February 2008

    Google Scholar 

  5. Palmer, R.: “No Strings Attached: The Magical Powers of DP”, pp. 13–15, Energize. January 2009

    Google Scholar 

  6. Zu, Y. et al.: “DP Conversion for a Successful Float-over Installation”. ISOPE paper, ISBN 978-1-880653-88-3, Rhodes, Greece June–July 2016

    Google Scholar 

  7. Bai, X., et al.: “Research and Application of Floatover Operations Using Dynamically Positioned Vessels in South China Sea”. ISOPE-I-14-411. Busan, South Korea (2014)

    Google Scholar 

  8. OVERDICK Press Release: “Successful installation of MOAB® Helwin Alpha—latest of our line of self-installing platforms worldwide”, 03 Sept 2013

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2017 Science Press, Beijing and Springer Nature Singapore Pte Ltd.

About this chapter

Cite this chapter

Liu, G., Li, H. (2017). Evolution and New Source of Motivation. In: Offshore Platform Integration and Floatover Technology. Springer Tracts in Civil Engineering . Springer, Singapore. https://doi.org/10.1007/978-981-10-3617-0_10

Download citation

  • DOI: https://doi.org/10.1007/978-981-10-3617-0_10

  • Published:

  • Publisher Name: Springer, Singapore

  • Print ISBN: 978-981-10-3616-3

  • Online ISBN: 978-981-10-3617-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics