Skip to main content

Analysis of Application of Pre-screwed Auger Wheels for Operative Increasing of Throughput Capacity of Oil Pipelines

  • Conference paper
  • First Online:
Proceedings of the 4th International Conference on Industrial Engineering (ICIE 2018)

Part of the book series: Lecture Notes in Mechanical Engineering ((LNME))

Included in the following conference series:

  • 27 Accesses

Abstract

In the paper, the application of a pre-screwed wheel of centrifugal main oil pumps is observed. The pre-screwed wheel serves as a backup pump for the main impeller and creates a small head. In this case, the cavitations reserve of the main unit is significantly reduced. The increase of throughput capacity is due to two factors: a slight increase in pressure after the station, as well as a significant reduction in the pressure before the pumping station. The application of a pre-screwed wheel is proposed for the operative increase of a throughput capacity at a small value. Economical comparison of the following methods of increase of throughput capacity is made:

  1. (1)

    use of a frequency-controlled drive

  2. (2)

    use of anti-turbulent additives

  3. (3)

    reduction of the settings at the entrance of stations with the help of pre-screwed wheels

  4. (4)

    selective repair of sections

  5. (5)

    restoring the pipeline capacity on the basis of determining the actual remaining life of pipelines without selective repair of sections. It is considered that the application of a pre-screwed wheel is characterized by low economic costs and small time of implementation and this method is perspective in oil industry.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Rakhmatullin ShI (1973) Increasing the productivity of the existing main oil pipeline by improving the suction capacity of the centrifugal pump NM 7000-210. Transp Storage oil oil Prod 4:15–19

    Google Scholar 

  2. Sherbatenko IV, Ivanova EP, Surikov VI (2006) Choosing the parameters of the pump wheel pump with the maximum cavitation quality. Chem Petrol Eng 3:19–23

    Google Scholar 

  3. Sherbatenko IV, Ivanova EP, Surikov VI (2007) Choosing the optimum grating density of the worm blades of the pump. Chem Petrol Eng 6:29–33

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Anvar Valeev .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Surikov, V., Lisin, Y., Valeev, A. (2019). Analysis of Application of Pre-screwed Auger Wheels for Operative Increasing of Throughput Capacity of Oil Pipelines. In: Radionov, A., Kravchenko, O., Guzeev, V., Rozhdestvenskiy, Y. (eds) Proceedings of the 4th International Conference on Industrial Engineering. ICIE 2018. Lecture Notes in Mechanical Engineering. Springer, Cham. https://doi.org/10.1007/978-3-319-95630-5_53

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-95630-5_53

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-95629-9

  • Online ISBN: 978-3-319-95630-5

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics