Skip to main content

Trial Runs and Restarts of Equipment After Maintenance Work

  • Chapter
  • First Online:
  • 240 Accesses

Abstract

These units shall be carefully run on trial after carrying out checks and repairs during maintenance. Their throughput shall be measured and performance shall be checked by observing operating conditions thereafter. All waste materials shall be disposed safely and without causing environmental pollution.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   39.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   54.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Golwalkar, K.R. (2019). Trial Runs and Restarts of Equipment After Maintenance Work. In: Integrated Maintenance and Energy Management in the Chemical Industries. Springer, Cham. https://doi.org/10.1007/978-3-030-32526-8_9

Download citation

Publish with us

Policies and ethics