Abstract
These units shall be carefully run on trial after carrying out checks and repairs during maintenance. Their throughput shall be measured and performance shall be checked by observing operating conditions thereafter. All waste materials shall be disposed safely and without causing environmental pollution.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsAuthor information
Authors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this chapter
Cite this chapter
Golwalkar, K.R. (2019). Trial Runs and Restarts of Equipment After Maintenance Work. In: Integrated Maintenance and Energy Management in the Chemical Industries. Springer, Cham. https://doi.org/10.1007/978-3-030-32526-8_9
Download citation
DOI: https://doi.org/10.1007/978-3-030-32526-8_9
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-32525-1
Online ISBN: 978-3-030-32526-8
eBook Packages: Chemistry and Materials ScienceChemistry and Material Science (R0)