Skip to main content

Comparison of Construction Schemes for Constructing Concrete-Filled Steel Tube Tied Arch Bridge in Shallow Water Channel

  • Conference paper
  • First Online:
Proceedings of ARCH 2019 (ARCH 2019)

Part of the book series: Structural Integrity ((STIN,volume 11))

Included in the following conference series:

  • 1358 Accesses

Abstract

To support this paper, the under-construction Wang’anshi Fuhe Bridge (main span 168 m), a mid-through tied arch bridge with concrete-filled steel tube (CFST), is taken as the research object, to discuss the advantages and disadvantages of the two construction procedures of the first-arch-then-girder, and the first-girder-then-arch. In account of construction difficulty, environmental influence, construction period and economy, the advantages and disadvantages of each construction method is revealed from construction methods including tower crane, gantry crane, and island building, which puts forward the optimal construction method and main control points of CFST tied arch bridge in shallow water channel.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Xiang, Z., et al.: Overall working design of main bridge of Shengmi Bridge in Nanchang. World bridge (3) (2005)

    Google Scholar 

  2. Mofcom homepage. http://ningxia.mofcom.gov.cn/aarticle/sjshangwudt/201211/20121108427628.html

  3. Wang, X.: Installation technology of the arch rib floating crane method for the concrete-filled steel tube belted through bridge. Highw. Traffic sci. Technol. Appl. Technol. Version (2) (2017)

    Google Scholar 

  4. Zhulong BBS. http://bbs.zhulong.com/102020_group_200601/detail21084066/

  5. Chen S.: Preliminary study on the application of Island building technology in bridge construction. Jiangxi Build. Mater. 22 (2017)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sheng Zhou .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2020 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Wu, F., Zhou, S., Shu, P., Hua, J., Liu, Q., Huang, G. (2020). Comparison of Construction Schemes for Constructing Concrete-Filled Steel Tube Tied Arch Bridge in Shallow Water Channel. In: Arêde, A., Costa, C. (eds) Proceedings of ARCH 2019. ARCH 2019. Structural Integrity, vol 11. Springer, Cham. https://doi.org/10.1007/978-3-030-29227-0_60

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-29227-0_60

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-29226-3

  • Online ISBN: 978-3-030-29227-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics