Abstract

The Alcoa Fjarðaál smelter in Iceland consumes 4600 GWh annually to produce aluminum. About 50% of the total energy absorbed by the cells is reduced to waste heat of which roughly 40% is currently lost through exhaust gases . The exhaust gases leave the cells at about 110 °C before entering the gas treatment center (GTC). The feasibility of operating heat exchangers upstream of GTCs has been demonstrated at other smelters. Reyðarfjordur, which is 5.5 km from Fjarðaál currently uses electricity for domestic heating, like other surrounding communities. Previous research has shown that the waste heat from Fjarðaál is more than enough to supply space heating for the local community. This paper will address the technical challenges and suggest solutions to deliver heat in a closed-loop heating circuit from the Fjarðaál plant to Reydarfjordur and estimate the total investment cost for the heat regeneration system.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Landvirkjun (2018) Fjótsdalur Power Station https://www.landsvirkjun.com/company/powerstations/fljotsdalurpowerstation/. Accessed 7 Aug 2018

  2. Yu M (2018) Waste heat recovery from aluminium production, M.Sc. thesis, Reykjavík University

    Google Scholar 

  3. Samorka, Flokkur: Hitaveita https://www.samorka.is/category/hitaveita/. Accessed 7 Aug 2018

  4. Email from Sigurjón Kristinn Björgvinsson, Process Technician at Fjarðaál. Received 15 Mar 2018

    Google Scholar 

  5. Wedde G (2012) HEX Retrofit enables smelter capacity expansion

    Google Scholar 

  6. Wedde G (2009) Pot gas heat recovery and emission control

    Google Scholar 

  7. Wedde G (2009) Increased energy efficiency and reduced HF emissions with new heat exchanger

    Google Scholar 

  8. Personal communication during site visit at Alcoa Mosjoen (May 2018)

    Google Scholar 

  9. Email from Geir Wedde, Consulting Engineer. Received 28 Feb 2018

    Google Scholar 

  10. Ingimar HG, Jónas K (2010) Jarðhitanotkun til raforkuvinnslu og beinna nota til ársins 2009 https://orkustofnun.is/gogn/Skyrslur/OS-2010/OS-2010-02.pdf. Accessed 7 Aug 2010

  11. Email from Þorsteinn Sigurjónsson, Director of Municipal Utilities at Fjarðabyggð. Received 14 June 2018

    Google Scholar 

  12. Courau A, Darsy N, Lim C (2015) Balanced GTC’s at the heart of aluminium production, Aluminium International Today

    Google Scholar 

  13. Email from Sigurjón Kristinn Björgvinsson, Process Technician at Fjarðaál. Received 28 May 2018

    Google Scholar 

  14. Orkustofnun (2018) http://map.is/os/. Accessed 12 July 2018

  15. Landsvirkjun (2018) Energy Generation in Harmony with the Environment and Society, https://www.landsvirkjun.com/societyenvironment/. Accessed 16 Aug 2018

  16. Email from Ómar Bjarki Smárason, Engineer at STAPI ehf, Received 14 June 2018

    Google Scholar 

  17. Ómar SB (2015) Hitaveita Eskifjarðar Framtíðarsýn 2015, STAPI ehf

    Google Scholar 

  18. RUV (2017) Hitaveitan á Eskifirði hefur kólnað, http://www.ruv.is/frett/hitaveitan-a-eskifirdi-hefur-kolnad. Accessed 15 Aug 2018

Download references

Acknowledgements

The authors are grateful to the Alcoa Foundation for financial support for this project and to Geir Wedde for valuable advice. The authors also gratefully acknowledge the interest and input from Alcoa Fjarðaál, Fjarðabyggð, and EFLA Consulting Engineers.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Leo Blaer Haraldsson .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 The Minerals, Metals & Materials Society

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Haraldsson, L.B., Saevarsdottir, G., Gudjonsdottir, M.S., Valgardsson, G. (2019). Feasibility of a District Heating System in Fjardabyggd Using Waste Heat from Alcoa Fjardaal. In: Wang, T., et al. Energy Technology 2019. The Minerals, Metals & Materials Series. Springer, Cham. https://doi.org/10.1007/978-3-030-06209-5_3

Download citation

Publish with us

Policies and ethics