Skip to main content
Log in

Rockfill dam compaction quality evaluation based on cloud-fuzzy model

基于云-模糊模型的堆石坝施工质量评估

  • Published:
Journal of Zhejiang University-SCIENCE A Aims and scope Submit manuscript

Abstract

The quality of compaction is key to the safety of dam construction and operation. However, because of incomplete information about the construction process and the unknown relationship between compaction quality and the factors that influence it, traditional evaluation methods such as neural networks and multivariate linear regression models fail to take uncertainty fully into account. This paper proposes a cloud-fuzzy method for assessing compaction quality by considering randomness, fuzziness, and incomplete information. The compaction parameters and material source parameters are the key parameters in the assessment of compaction quality. A five-layer neural-network model of compaction quality assessment is established that considers compacted dry density and its classification membership and probability as the criteria, and the rolling speed, rolling passes, and compacted layer thickness as alternatives. Because of uncertainties in the criteria and alternatives, the cloud-fuzzy method, in which a fuzzy neural network is extended with a cloud model to handle uncertain and fuzzy problems more effectively, is introduced to determine the compaction quality. A case study is presented to evaluate the compaction quality of a hydropower project in China. The results indicate that the cloud-fuzzy model is feasible in relation to precision and makes up for the sole focus on precision by traditional methods. The proposed method provides a triple index for understanding compaction quality, which facilitates assessment of the compaction quality of an entire dam surface.

概要

目的

施工质量对于大坝建设期及运行期的安全至关重 要。由于施工过程中的信息不完备及碾压质量与 影响因素之间的关系并不是完全确定等原因,传 统的评估方法很少考虑不确定性对施工质量的 影响。本文旨在探讨考虑不确定性影响的碾压质 量评估方法,改善施工质量评估的可信性。

创新点

1. 通过研究模糊神经网络与径向基神经网络,结 合云模型建立云-模糊模型;2. 建立施工质量三指 标体系评价方法。

方法

1. 通过碾压质量实时监控系统和现场试坑试验获 取参数数据;2. 通过云分析,建立云-模糊模型; 3. 对比不同的模型,验证云-模糊模型的可行性; 4. 利用验证的云-模糊模型对大坝施工仓面进行 压实干密度预测;5. 计算评价体系的三指标,对 施工质量进行评估。

结论

1. 云-模糊模型不但能在精度上满足预测要求,而 且能够综合考虑施工质量与影响因素之间的不 确定性关系;2. 云-模糊评价方法弥补了传统评价 方法仅追求精度的单一性,使得施工质量评价更 符合客观规律;3. 提出的施工质量三指标评价体 系充实了传统的评价方法,能够更客观地指导实 际工程建设。

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Anderegg R, Kaufmann K, 2004. Intelligent compaction with vibratory rollers. Transportation Research Record: Journal of the Transportation Research Board, 1868(1): 124–134. https://doi.org/10.3141/1868-13

    Article  Google Scholar 

  • Anderegg R, von Felten DA, Kaufmann K, 2006. Compaction monitoring using intelligent soil compactors. Proceedings of the GeoCongress 2006: Geotechnical Engineering in the Information Technology Age, p.41-46.

    Book  Google Scholar 

  • Bas MC, Ortiz J, Ballesteros L, et al., 2017. Evaluation of a multiple linear regression model and SARIMA model in forecasting 7Be air concentrations. Chemosphere, 177: 326–333. https://doi.org/10.1016/j.chemosphere.2017.03.029

    Article  Google Scholar 

  • Fu B, Li DG, Wang MK, 2011. Review and prospect on research of cloud model. Application Research of Computers, 28(2):420–426 (in Chinese). https://doi.org/10.3969/j.issn.1001-3695.2011.02.004

    Google Scholar 

  • Kaufmann K, Anderegg R, 2008. 3D-construction applications III: GPS-based compaction technology. Proceedings of the 1st International Conference on Machine Control & Guidance, p.1-10.

    Google Scholar 

  • Komandi G, 1999. An evaluation of the concept of rolling resistance. Journal of Terramechanics, 36(3):159–166. https://doi.org/10.1016/S0022-4898(99)00005-1

    Article  Google Scholar 

  • Li DR, Wang SL, Li DY, 2006. The Theory of Space Data Dating and Application. Science Press, Beijing, China, p.330-331 (in Chinese).

    Google Scholar 

  • Li DY, Du Y, 2014. Artificial Intelligence with Uncertainty. National Defense Industry Press, Beijing, China, p.105-106 (in Chinese).

    MATH  Google Scholar 

  • Liu DH, Wang GF, 2014. Compaction quality evaluation of the entire rolled unit of earth dam based on real-time monitoring. Journal of Hydraulic Engineering, 41(6):720–726 (in Chinese).

    Google Scholar 

  • Liu DH, Sun J, Zhong DH, et al., 2012. Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9):1085–1094. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000510

    Article  Google Scholar 

  • Mao YY, Zhang XG, Wang LS, 2006. Fuzzy pattern recognition method for assessing groundwater vulnerability to pollution in the Zhangji area. Journal of Zhejiang University-SCIENCE A, 7(11):1917–1922. https://doi.org/10.1631/jzus.2006.A1917

    Article  Google Scholar 

  • Mirinejad H, Inanc T, 2017. An RBF collocation method for solving optimal control problems. Robotics and Autonomous Systems, 87:219–225. https://doi.org/10.1016/j.robot.2016.10.015

    Article  Google Scholar 

  • Mooney MA, Rinehart RV, 2007. Field monitoring of roller vibration during compaction of subgrade soil. Journal of Geotechnical and Geoenvironmental Engineering, 133(3): 257–265. https://doi.org/10.1061/(ASCE)1090-0241(2007)133:3(257)

    Article  Google Scholar 

  • Qin K, Wang P, 2008. New method of curve fitting based on cloud transform. Computer Engineering and Applications, 44(23):56–58 (in Chinese). https://doi.org/10.3778/j.issn.1002-8331.2008.23.017

    Google Scholar 

  • Rinehart RV, Mooney MA, 2008. Instrumentation of a roller compactor to monitor vibration behavior during earthwork compaction. Automation in Construction, 17(2): 144–150. https://doi.org/10.1016/j.autcon.2006.12.006

    Article  Google Scholar 

  • Sandstrom A, Pettersson JC, 2004. Intelligent systems for QA/QC in soil compaction. Proceedings of the 83rd Annual Transportation Research Board Meeting, p.1-17.

    Google Scholar 

  • Song JJ, Du XP, Wang Q, et al., 2011. A method of multiattribute synthetic evaluation based on cloud model. Key Engineering Materials, 480–481:805–809. https://doi.org/10.4028/www.scientific.net/KEM.480-481.805

    Article  Google Scholar 

  • Wang DY, Luo HY, Grunder O, et al., 2017. Multi-step ahead electricity price forecasting using a hybrid model based on two-layer decomposition technique and BP neural network optimized by firefly algorithm. Applied Energy, 190:390–407. https://doi.org/10.1016/j.apenergy.2016.12.134

    Article  Google Scholar 

  • Wang GY, Xu CL, 2012. Cloud model–a bidirectional cognition model between concept’s extension and intension. International Conference on Advanced Machine Learning Technologies and Applications (AMLTA 2012), p.391-400. https://doi.org/10.1007/978-3-642-35326-0_39

    Google Scholar 

  • Wang GY, Xu CL, Li DY, 2014. Generic normal cloud model. Information Sciences, 280:1–15. https://doi.org/10.1016/j.ins.2014.04.051

    Article  MathSciNet  MATH  Google Scholar 

  • Wang R, Zhong DH, Wu BP, et al., 2015. Compaction quality evaluation of rockfill dam based on compaction and material parameters. Journal of Hydroelectric Engineering, 34(9):146–152 (in Chinese). https://doi.org/10.11660/slfdxb.20150919

    Google Scholar 

  • Wang XL, Zhou L, Ren BY, et al., 2015. Dual evaluation on rolling compaction quality of rock-fill dam based on realtime monitoring. Journal of Hydroelectric Engineering, 34(2):164–170 (in Chinese).

    Google Scholar 

  • White DJ, Rupnow TD, Ceylan H, 2004. Influence of subgrade/subbase non-uniformity on PCC pavement performance. GeoTrans 2004-Geotechnical Engineering for Transportation Projects, p.1058-1065.

    Book  Google Scholar 

  • Zeng QH, Liu Y, Zhao HT, et al., 2017. Comparison of models for predicting the changes in phytoplankton community composition in the receiving water system of an interbasin water transfer project. Environmental Pollution, 223:676–684. https://doi.org/10.1016/j.envpol.2017.02.001

    Article  Google Scholar 

  • Zhong DH, Cui B, Liu DH, 2009. Theoretical research on construction quality real-time monitoring and system integration of core rock-fill dam. Science in China Series E: Technological Sciences, 52(11):3406–3412. https://doi.org/10.1007/s11431-009-0343-6

    Article  Google Scholar 

  • Zhong DH, Liu DH, Cui B, 2011. Real-time compaction quality monitoring of high core rockfill dam. Science China Technological Sciences, 54(7):1906–1913. https://doi.org/10.1007/s11431-011-4429-6

    Article  Google Scholar 

  • Zhong DH, Hu W, Wu BP, et al., 2017. Dynamic time-costquality tradeoff of rockfill dam construction based on real-time monitoring. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 18(1): 1–19. https://doi.org/10.1631/jzus.A1600564

    Article  Google Scholar 

  • Zhu Q, Xu X, Gao CH, et al., 2015. Qualitative and quantitative uncertainties in regional rainfall frequency analysis. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 16(3):194–203. https://doi.org/10.1631/jzus.A1400123

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Bin-ping Wu.

Additional information

Project supported by the National Natural Science Foundation of China (No. 51439005), the National Basic Research Program (973 Program) of China (No. 2013CB035906), and the National Natural Science Foundation of Innovation Group (No. 51621092), China

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Wang, F., Zhong, Dh., Yan, Yl. et al. Rockfill dam compaction quality evaluation based on cloud-fuzzy model. J. Zhejiang Univ. Sci. A 19, 289–303 (2018). https://doi.org/10.1631/jzus.A1600753

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1631/jzus.A1600753

Keywords

关键词

CLC number

Navigation