Table. 4 Model estimation results
From: Industrial efficiency analysis based on the spatial panel model
Variable | \({W}^{0-1}\) | \({W}^{d}\) |
---|---|---|
\(HLQ\) |
0.0382* (0.234) |
0.0608*** (0.0221) |
\(Ln R\&D\) |
0.0402 (0.0316) |
0.0815* (0.0341) |
\(Ln FDI\) |
0.0114 (0.0104) |
– 0.0009 (0.0103) |
\(MS\) |
0.0528*** (0.0129) |
0.0547*** (0.0108) |
\(IND\) |
– 0.5713*** (0.1480) |
– 0.2543* (0.1425) |
\(URB\) |
– 0.3482 (0.2586) |
– 1.2265*** (0.3410) |
\(W\times HLQ\) |
0.1539*** (0.0450) |
0.1991* (0.1101) |
\(W\times Ln R\&D\) |
0.1965*** (0.0463) |
0.4278** (0.1879) |
\(W\times Ln FD\) I |
– 0.0115 (0.0226) |
– 0.3345*** (0.0912) |
\(W\times MS\) |
– 0.0359** (0.0155) |
– 0.0827*** (0.0158) |
\(W\times IND\) |
– 0.0937 (0.2365) |
– 1.4621*** (0.5455) |
\(W\times URB\) |
– 2.4975*** (0.6895) |
– 1.7864 (2.4341) |
\(\rho\) |
0.1329** (0.0752) |
1.1144*** (0.3252) |
like-hood | 558.7845 | 558.7845 |