Optimization of Longwall Parameters in Underground Mining of Thick Methane-Bearing Coal Seam in the Sokolovo Deposit in Kuzbass

  • Mineral Mining Technology
  • Published:
Journal of Mining Science Aims and scope

Abstract

The technical and economic feasibility of increasing the length of longwall 5003 in the the Yalevsky Mine to 400 m and raising output per face to 70 ths t per day in mining thick coal seam is substantiated. It is found that from the condition of the maximum annual profit of the mine, the optimized longwall length is 450 m, and the variants of the longwall lengths of 400 and 512 m are equivalent. The methane release calculations show that at the indicated length and production output of the longwall, it is predicted that methane concentration in return ventilation air is 0.53%, which means null gas criterion constraints.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Tekhnicheskii proekt razrabotki Sokolovskogo kamennougol’nogo mestorozhdeniya. Otrabotka zapasov plastov 50 i 52 v granitsakh shakhtoupravleniya Kotinskaya OAO SUEK-Kuzbass s ob’edineniem seti gornykh vyrabotok shakht im. V.D. Yalevskogo i Kotinskaya. I etap. Dopolnenie no. 3 (Sokolovo Coal Deposit Development Project. Extraction of Coal Reserves from Seams 50 and 52 within Kotinskaya Mine Management limits with integration of underground excavations of the Yalevsky and Kotinskaya Mines. Stage I. Amendment 3), vol. 1, book 1, Kemerovo: NPTS VostNII, 2017.

  2. Plotnikov, V.P., Deriving formulas for screw, drum or crown shearers, Ugol’, 2009, no. 9, pp. 5–7.

  3. Metodicheskoe obespechenie programmy PROZA-4.0 dlya kompleksnoi optimizatsii ochistnykh i podgotovitel’nykh rabot v paneli Shakhty pri podzemnoi otrabotke pologikh i naklonnykh ugol’nykh plastov (Methodological Support for PROZA-4.0 Program for Integrated Optimization of Primary and Secondary Mining Works in Extraction Panels in Flat and Steeply Pitching Coal Seams), Novosibirsk: IGD SO RAN, 2015.

  4. Solod, V.I., Getopanov, V.N., and Metel’kov, A.A., Proektirovanie i konstruirovanie mashin i kompleksov (Design and Construction of Machines and Assemblies), Moscow: Nedra, 1982.

    Google Scholar 

  5. Ordin, A.A., Nikol’skii, A.M., and Metel’kov, A.A., Modeling and Optimization of Preparatory Work and Stoping in a Coal Mine Panel, J. Min. Sci., 2013, vol. 49, no. 6, pp. 941–949.

    Article  Google Scholar 

  6. Vremennye ukazaniya po upravleniyu gornym davleniem v ochistnykh zaboyakh na plastakh moshchnost’yu do 3.5 m i uglom padeniya do 35° (Temporal Guidelines on Ground Control in Longwalls in Seams up to 3.5 m Thick at the Dip Angle to 35°), Leningrad: VNIMI, 1982.

  7. Aleksandrov, B.A., Kozhukhov, L.F., Antonov, Yu.A., et al., Gornye mashiny i oborudovanie podzemnykh otrabotok (Underground Mining Machines and Equipment), Kemerovo: KuzGTU, 2006.

    Google Scholar 

  8. Kondrashin, Yu.A., Koloyarov, V.K., Yastremskii, S.I., et al., Rudnichnyi transport i mekhanizatsiya vspomogatel’nykh rabot: catalog-spravochnik (Mining Transport and Auxiliary Work Mechanization), Moscow: Gornaya Kniga, 2010.

    Google Scholar 

  9. Kossov, V.V., Livshits, V.N., and Shakhnazarov, A.G., Metodicheskie rekomendatsii po otsenke effektivnosti investitsionnykh proektov (Methodical Guidelines on Efficiency Evaluation of Investment Projects), Moscow: Ekonomika, 2000.

    Google Scholar 

  10. Ordin, A.A. and Timoshenko, A.M., Nonlinear Relationship between Coalbed Methane Release, Natural Methane Content and Kinematic Parameters of Cutting Picks of Shearers, J. Min. Sci., 2017, vol. 53, no. 2, pp. 311–316.

    Article  Google Scholar 

  11. Semykin, Yu.A., Improvement of Coal Mining Safety through In-Situ Methane Release Intensification and Longwall Gas Content Prediction Technique Perfection, Cand Tech. Sci. Synopsys, Moscow: NITU MISIS, 2016.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. A. Ordin.

Additional information

Original Russian Text © A.A. Ordin, A.M. Timoshenko, D.V. Botvenko, A.A. Meshkov, M.A. Volkov, 2018, published in Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2018, No. 4, pp. 79–89.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ordin, A.A., Timoshenko, A.M., Botvenko, D.V. et al. Optimization of Longwall Parameters in Underground Mining of Thick Methane-Bearing Coal Seam in the Sokolovo Deposit in Kuzbass. J Min Sci 54, 599–608 (2018). https://doi.org/10.1134/S1062739118044063

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1134/S1062739118044063

Keywords

Navigation