Abstract
The M-machine problem with interval job time formulated in Part I is solved by the method of interval logical determinants.
Similar content being viewed by others
REFERENCES
Levin, V.I., An M-Stage System with Indeterminate Processing Time. Part I: Schedule Optimization, Avtom. Telemekh., 2002, no. 1.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Levin, V.I. An M-Stage System with Indeterminate Processing Time: Schedule Optimization. Automation and Remote Control 63, 289–295 (2002). https://doi.org/10.1023/A:1014203809808
Issue Date:
DOI: https://doi.org/10.1023/A:1014203809808