Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Wang, X. Tianrun Xia County phase III 99.5 MW wind power engineering technology and green innovation. Front. Eng. Manag. 6, 131–137 (2019). https://doi.org/10.1007/s42524-019-0012-9
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s42524-019-0012-9