Skip to main content
Log in

Tianrun Xia County phase III 99.5 MW wind power engineering technology and green innovation

  • Super Engineering
  • Published:
Frontiers of Engineering Management Aims and scope Submit manuscript

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Xiaobo Wang.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Wang, X. Tianrun Xia County phase III 99.5 MW wind power engineering technology and green innovation. Front. Eng. Manag. 6, 131–137 (2019). https://doi.org/10.1007/s42524-019-0012-9

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s42524-019-0012-9

Keywords

Navigation