Abstract
The aim of the present study is to carry out the profit analysis of a computer system by considering the concept of priority to preventive maintenance over different hardware and software repair activities. For this purpose, three stochastic models have been developed under different priority policies. A single repair facility is available to perform all repair activities. The hardware unit undergoes replacement after a pre-specific maximum repair time. The repairman performs the preventive maintenance of the whole system after a pre-fixed maximum operation time. All time-dependent failure rates follow exponential distribution, while the repair rates follow arbitrary distribution. Switch devices, repairs and preventive maintenance are perfect. All random variables are statistically independent. Semi-Markov process and regenerative point technique were used to derive the necessary system effectiveness measure to evaluate the profit function of all the three models. To highlight the importance of the study, graphs for profit difference between models have been depicted for a particular set of values of various parameters with respect to preventive maintenance.
Similar content being viewed by others
References
Friedman, M.A., Tran, P.: Reliability techniques for combined hardware/software systems. In: Reliability and Maintainability Symposium, 1992. Proceedings., Annual (pp. 290–293). IEEE (1992)
Welke, S.R., Johnson, B.W., Aylor, J.H.: Reliability modeling of hardware/software systems. IEEE Trans. Reliab. 44(3), 413–418 (1995)
Lai, C.D., Xie, M., Poh, K.L., Dai, Y.S., Yang, P.: A model for availability analysis of distributed software/hardware systems. Inf. Softw. Technol. 44, 343–350 (2002)
Malik, S.C., Anand, J.: Reliability and economic analysis of a computer system with independent hardware and software failures. Bull. Pure Appl. Sci. 1, 141–153 (2010). Vol. 29 E (Math. & Stat.)
Koutras, V.P., Platis, A.N.: Semi-Markov performance modelling of a redundant system with partial, full and failed rejuvenation. Int. J. Crit. Comput. Based Syst. 1(1–3), 59–85 (2010)
Jain, M., Agrawal, S.C., Preeti, C.: Availability analysis of software–hardware system with common cause shock failure, spare and switching failure. Int. J. Int. Acad. Phys. Sci. 14(1), 1–13 (2010)
Kumar, A., Malik, S.C., Barak, M.S.: Reliability modeling of a computer system with independent H/W and S/W failures subject to maximum operation and repair times. Int. J. Math. Arch. 3(7), 2622–2630 (2012)
Kumar, A., Malik, S.C.: Stochastic modeling of a computer system with priority to PM over S/W replacement subject to maximum operation and repair times. Int. J. Comput. Appl. 43(3), 27–34 (2012)
Kumar, A., Malik, S.C.: Cost-benefit analysis of a computer system with priority to S/W replacement over H/W repair activities subject to maximum operation and repair times. J. Sci. Ind. Res. 73(10), 653–655 (2014)
Malik, S.C., Munday, V.J.: Stochastic modelling of a computer system with hardware redundancy. Int. J. Comput. Appl. 89(7), 26–30 (2014)
Kumar, A., Saini, M., Malik, S.C.: Performance analysis of a computer system with imperfect fault detection of hardware. Proc. Comput. Sci. 45, 602–610 (2015)
Jain, M., Preeti, C.: Availability analysis of software rejuvenation in active/ standby cluster system. Int. J. Ind. Syst. Eng. 19(1), 75–93 (2015)
Ashish, K., Monika, S.: Comparison of various reliability measures of a computer system with the provision of priority. In: Afzalpulkar, N., Srivastava, V., Singh, G., Bhatnagar, D. (eds.) Proceedings of the International Conference on Recent Cognizance in Wireless Communication and Image Processing, Springer, New Delhi (2016)
Kumar, A., Saini, M., Srivastava, D.K.: Profit analysis of a computing machine with priority and s/w rejuvenation. In: Mishra, D., Nayak, M., Joshi, A. (eds.) Information and Communication Technology for Sustainable Development. Lecture Notes in Networks and Systems, vol 9. Springer, Singapore (2017)
Kumar, I., Kumar, A., Saini, M., Devi, K.: Probabilistic analysis of performance measures of redundant systems under weibull failure and repair laws. In: Vishwakarma, H., Akashe, S. (eds.) Computing and Network Sustainability. Lecture Notes in Networks and Systems, vol 12. Springer, Singapore (2017)
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Kumar, A., Saini, M. Profit analysis of a computer system with preventive maintenance and priority subject to maximum operation and repair times. Iran J Comput Sci 1, 147–153 (2018). https://doi.org/10.1007/s42044-018-0011-8
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s42044-018-0011-8