Table 8 The performances of various methods

From: A fuzzy mid-term capacity and production planning model for a manufacturing system with cloud-based capacity

Method Total costs (USD) Unmet demand (pieces)
The zero outsourcing by considering uncertainty policy 705,675 0
The zero outsourcing without considering uncertainty policy 687,525 110
The complete outsourcing policy 1,078,509 0
The proposed methodology 655,295 0