Abstract
Roller compacted concrete (RCC) dam projects are generally initiated in dynamic environment, where space conflicts occur frequently. Construction workers are often exposed to dangers posed by activities performed by teams other than their own. Therefore, it’s critical for construction security to conduct fairly precise exposure assessment. Several research studies have been proposed to address this site safety issue. Despite their valuable contributions, few of them have noticed that, for some construction processes, their hazard scope may exceed the work space. Another limitation is that most traditional methods expound space factor and time factor separately rather than comprehensively. Accordingly, the present paper proposes a novel method to quantify exposure frequency integrated with the real-time location information of three-dimensional cross activities. Combined with the construction process cycle and the operation time characteristics, conflicts between impact space and work space are determined in real time, which is more accurate as the interaction between construction activities is certain at each moment. With a reliable assessment of hazard exposure levels, construction managers will be able to provide solutions to reduce hazards to acceptable levels.
Similar content being viewed by others
Change history
14 April 2021
A retraction note to this paper has been published: https://doi.org/10.1007/s12205-020-7163-4.
References
Akinci B, Fischer M, Levitt R, Carlson R (2002) Formalization and automation of time-space conflict analysis. Journal of Computing in Civil Engineering 16(2):124–134, DOI: https://doi.org/10.1061/(asce)0887-3801(2002)16:2(124)
Al Bahnassi H, Hammad A (2012) Near real-time motion planning and simulation of cranes in construction: Framework and system architecture. Journal of Computing in Civil Engineering 26(1):54–63, DOI: https://doi.org/10.1061/(ASCE)CP.1943-5487.0000123
Antonio LA, Juan Carlos RR, Gibb AGF, Gambatese JA (2013) Safety risk assessment for vertical concrete formwork activities in civil engineering construction. Work 49(2):183–192, DOI: https://doi.org/10.3233/WOR-131724
Bansal VK (2011) Use of GIS and topology in the identification and resolution of space conflicts. Journal of Computing in Civil Engineering 25(2):159–171, DOI: https://doi.org/10.1061/(asce)cp.1943-5487.0000075
Behzadan AH, Aziz Z, Anumba CJ, Kamat VR (2008) Ubiquitous location tracking for context-specific information delivery on construction sites. Automation in Construction 17(6):737–748, DOI: https://doi.org/10.1016/j.autcon.2008.02.002
Carter G, Smith SD (2006) Safety hazard identification on construction projects. Journal of Construction Engineering and Management 132(2):197–205, DOI: https://doi.org/10.1091/(ASCE)0733-9364(2006)132:2(197)
Cheng T, Teizer J (2013) Real-time resource location data collection and visualization technology for construction safety and activity monitoring applications. Automation in Construction 34:3–15, DOI: https://doi.org/10.1016/j.autcon.2012.10.017
Choe S, Leite F (2017a) Assessing safety risk among different construction trades: Quantitative approach. Journal of Construction Engineering and Management 143(5), DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001237
Choe S, Leite F (2017b) Construction safety planning: Site-specific temporal and spatial information integration. Automation in Construction 84:335–344, DOI: https://doi.org/10.1016/j.autcon.2017.09.007
Dharmapalan V, Gambatese JA, Fradella J, Vahed AM (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management 141(4), DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000952
Guo SJ, Asce M (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering & Management 128(4):287–295, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(287)
Hallowell MR, Gambatese JA (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management 135(10):990–998, DOI: https://doi.org/10.1061/(asce)co.1943-7862.0000071
Hammad A, Zhang C, Al-Hussein M, Cardinal G (2007) Equipment workspace analysis in infrastructure projects. Canadian Journal of Civil Engineering 34(10):1247–1256, DOI: https://doi.org/10.1139/l07-048
Hao W, Yin Y, Wang S, Shi W, Clarke KC, Miao Z (2017) Optimizing GPS-guidance transit route for cable crane collision avoidance using artificial immune algorithm. GPS Solutions 21(2):1–12, DOI: https://doi.org/10.1007/s10291-016-0573-6
Jia N, Xie M, Chai X (2012) Development and implementation of a GIS-based safety monitoring system for hydropower station construction. Journal of Computing in Civil Engineering 26(1):44–53, DOI: https://doi.org/10.1061/(ASCE)CP.1943-5487.0000105
Kamat VR, Martinez JC (2008) Software mechanisms for extensible and scalable 3D visualization of construction operations. Advances in Engineering Software 39(8):659–675, DOI: https://doi.org/10.1016/j.advengsoft.2007.07.001
Luo X, Li H, Huang T, Skitmore M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management 142(8), DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001139
Mallasi Z (2006) Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation. Automation in Construction 15(5):640–655, DOI: https://doi.org/10.1016/j.autcon.2005.08.005
Moon HS, Dawood N, Kang LS (2014) Development of workspace conflict visualization system using 4D object of work schedule. Advanced Engineering Informatics 28(1):50–65, DOI: https://doi.org/10.1016/j.aei.2013.12.001
Rozenfeld O, Sacks R, Rosenfeld Y (2009) ‘CHASTE’: Construction hazard assessment with spatial and temporal exposure. Construction Management and Economics 27(7):625–638, DOI: https://doi.org/10.1080/01446190903002771
Sacks R, Rozenfeld O, Rosenfeld Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management 135(8):726–736, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2009)135:8(726)
Shao B, Hu Z, Liu Q, Chen S, He W (2019) Fatal accident patterns of building construction activities in China. Safety Science 111(1):253–263, DOI: https://doi.org/10.1016/j.ssci.2018.07.019
Song Y, Chua DKH (2005) Detection of spatio-temporal conflicts on a temporal 3D space system. Advances in Engineering Software 36(11): 814–826, DOI: https://doi.org/10.1016/j.advengsoft.2005.03.025
Sun Y, Fang DP, Wang SQ, Dai MD, Lv XQ (2008) Safety risk identification and assessment for beijing olympic venues construction. Journal of Management in Engineering 24(1):40–47, DOI: https://doi.org/10.1061/(ASCE)0742-597X(2009)25:2(97)
Tao S, Wu C, Sheng Z, Wang X (2018) Space-time repetitive project scheduling considering location and congestion. Journal of Computing in Civil Engineering 32(3), DOI: https://doi.org/10.1061/(ASCE)CP.1943-5487.0000745
Taroun A (2014) Towards a better modelling and assessment of construction risk: Insights from a literature review. International Journal of Project Management 32(1):101–115, DOI: https://doi.org/10.1016/j.ijproman.2013.03.004
Taylan O, Bafail AO, Abdulaal RMS, Kabli MR (2014) Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing Journal 17(4):105–116, DOI: https://doi.org/10.1016/j.asoc.2014.01.003
Yi K-J, Langford D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management 132(fi):626–635, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(626)
Zheng X-Z, Wang F, Zhou J-L (2017) A hybrid approach for evaluating faulty behavior risk of high-risk operations using ANP and Evidence Theory. Mathematical Problems in Engineering, DOI: https://doi.org/10.1155/2017/7908737
Zheng X, Zhou J, Wang F, Chen Y (2018) Routes to faliure and prevention recommendations in work systems of hydropower construction. Journal of Civil Engineering and Management 24(3):206–222, DOI: https://doi.org/10.3846/jcem.2018.1647
Zhu Z, Park M-W, Koch C, Soltani M, Hammad A, Davari K (2016) Predicting movements of onsite workers and mobile equipment for enhancing construction site safety. Automation in Construction 68:95–101, DOI: https://doi.org/10.1016/j.autcon.2016.04.009
Acknowledgements
This study is supported by the National Natural Science Foundation of China (No.51609128; No.51878385) and China Scholarship Council (No. 20180842018).
Author information
Authors and Affiliations
Corresponding author
Additional information
This article has been retracted. Please see the retraction notice for more detail: https://doi.org/10.1007/s12205-020-7163-4
About this article
Cite this article
Zheng, X., Zhou, J., Chen, G. et al. RETRACTED ARTICLE: Exposure Assessment for Roller Compacted Concrete Dam Construction Integrated Real-Time Location Information. KSCE J Civ Eng 24, 703–714 (2020). https://doi.org/10.1007/s12205-020-1163-2
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-020-1163-2