Last train delay management in urban rail transit network: Bi-objective MIP model and genetic algorithm

Transportation Engineering
  • 42 Downloads

Abstract

Train delay is an inevitable phenomenon in urban rail transit system, but it usually has ripple effects by propagating to other trains and lines. In particular, last train delay has serious effect on transfer passengers’ regular trips. Transfer passengers from last trains concretely fall into two types in this paper: passengers transferring from the last train of feeder line to the last train of connecting line (LtoL) or from the last train of feeder line to un-last train of connecting line (LtoU). Then the last train network delay management model is presented with two objectives: maximizing connecting passengers and minimizing Average Transfer Waiting Time (ATWT) of LtoL transfer passengers. To solve large-scale practical problems rapidly, an efficient genetic algorithm is designed based on this model. Finally, the Beijing subway network is taken as a case study to verify the effectiveness of this model. Under various last train delay scenarios, the results show that the bi-objective model can increase the number of connections between last trains and connecting passengers, meanwhile, there is a big decline in the ATWT of LtoL transfer passengers.

Keywords

urban rail transit network last train delay management timetable rescheduling genetic algorithm 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Almodóvar, M. and García-Ródenas, R. (2013). “On-line reschedule optimization for passenger railways in case of emergencies.” Computers & Operations Research, Vol. 40, No. 3, pp. 725–736. DOI: 10.1016/j.cor.2011.01.013.CrossRefMATHGoogle Scholar
  2. Brunner, J. O. (2014). “Rescheduling of flights during ground delay programs with consideration of passenger and crew connections.” Transportation Research Part E: Logistics and Transportation Review, Vol. 72, pp. 236–252. DOI: 10.1016/j.tre.2014.10.004.CrossRefGoogle Scholar
  3. Caprara, A., Fischetti, M., and Toth, P. (2002). “Modeling and soling the train timetabling problem.” Operations Research, Vol. 50, No. 5, pp. 851–861. DOI: 10.1287/opre.50.5.851.362.MathSciNetCrossRefMATHGoogle Scholar
  4. Corman, F., D’Ariano, A., Pacciarelli, D., and Pranzo, M. (2010). “A tabu search algorithm for rerouting trains during rail operations.” Transportation Research Part B: Methodological, Vol. 44, No. 1, pp. 175–192, DOI: 10.1016/j.trb.2009.05.004.CrossRefGoogle Scholar
  5. D’Ariano, A., Pacciarelli, D., and Pranzo, M. (2007). “A branch and bound algorithm for scheduling trains in a railway network.” European Journal of Operational Research, Vol. 183, No. 2, pp. 643–657, DOI: 10.1016/j.ejor.2006.10.034.CrossRefMATHGoogle Scholar
  6. Dollevoet, T., Huisman, D., Schmidt, M., and Schöbel, A. (2012). “Delay management with rerouting of passengers.” Transportation Science, Vol. 46, No. 1, pp. 74–89, DOI: 10.1287/trsc.1110.0375.CrossRefGoogle Scholar
  7. Dollevoet, T., Schmidt, M., and Schöbel, A. (2015). “Delay management including capacities of stations.” Transportation Science, Vol. 49, No. 2, pp. 88–99, DOI: 10.1287/trsc.2013.0506.CrossRefMATHGoogle Scholar
  8. Dündar, S. and Şahin, İsmail. (2013). “Train re-scheduling with genetic algorithms and artificial neural networks for single-track railways.” Transportation Research Part C: Emerging Technologies, Vol. 27, No. 2, pp. 1–15, DOI: 10.1016/j.trc.2012.11.001.CrossRefGoogle Scholar
  9. Fan, B., Roberts, C., and Weston, P. (2012) “A comparison of algorithms for minimising delay costs in disturbed railway traffic scenarios.” Journal of Rail Transport Planning & Management, Vol. 2, pp. 23–33, DOI: 10.1016/j.jrtpm.2012.09.002.CrossRefGoogle Scholar
  10. Gatto, M., Glaus, B., Jacob, R., Peeters, L., and Widmayer, P. (2004). “Railway delay management: Exploring Its Algorithmic Complexity.” Algorithm Theory-Swat, Vol. 3111, pp. 199–211, Springer-Verlag, DOI: 10.1007/978-3-540-27810-8_18.MathSciNetMATHGoogle Scholar
  11. Ibarra-Rojas, O. J. and Rios-Solis, Y. A. (2012). “Synchronization of bus timetabling.” Transportation Research Part B: Methodological, Vol. 46, No. 5, pp. 599–614, DOI: 10.1016/j.trb.2012.01.006.CrossRefGoogle Scholar
  12. Kang, L., Wu, J., Sun, H., Zhu, X., and Gao, Z. (2015b). “A case study on the coordination of last trains for the Beijing subway network.” Transportation Research Part B: Methodological, Vol. 72, pp. 112–127, DOI: 10.1016/j.trb.2014.09.003.CrossRefGoogle Scholar
  13. Kang, L., Wu, J., Sun, H., Zhu, X., and Wang, B. (2015c). “A practical model for last train rescheduling with train delay in urban railway transit networks.” Omega, Vol. 50, pp. 29–42, DOI: 10.1016/j.omega. 2014.07.005.CrossRefGoogle Scholar
  14. Kang, L., Zhu, X., Wu, J., Sun, H., Siriya, S., and Kanokvate, T. (2015a). “Departure time optimization of last trains in subway networks: Mean-variance model and GSA algorithm.” Journal of Computing in Civil Engineering, Vol. 29, No. 6. DOI: 10.1061/(ASCE)CP.1943-5487. 0000407.Google Scholar
  15. Mascis, A. and Pacciarelli, D. (2002). “Job-shop scheduling with blocking and no-wait constraints.” European Journal of Operational Research, Vol. 143, pp. 498–517, DOI: 10.1016/S0377-2217(01)00338-1.MathSciNetCrossRefMATHGoogle Scholar
  16. Meng, X., Jia, L., and Qin, Y. (2010). “Train timetable optimizing and rescheduling based on improved particle swarm algorithm.” Transportation Research Record: Journal of the Transportation Research Board, Vol. 2197, pp. 71–79, DOI: 10.3141/2197-09.CrossRefGoogle Scholar
  17. Schachtebeck, M. and Schöbel, A. (2010). “To wait or not to wait-and who goes first? Delay management with priority decisions.” Transportation Science, Vol. 44, No. 3, pp. 307–321, DOI: 10.1287/trsc.1100.0318.CrossRefGoogle Scholar
  18. Schmöcker, J. D., Fonzone, A., Shimamoto, H., Kurauchi, F., and Bell, M. G. H. (2011). “Frequency-based transit assignment considering seat capacities.” Transportation Research Part B: Methodological, Vol. 45, pp. 392–408, DOI: 10.1016/j.trb.2010.07.002.CrossRefGoogle Scholar
  19. Schöbel, A. (2007). “Integer programming approaches for solving the delay management problem.” Algorithmic Methods for Railway Optimization, Vol. 4359, pp. 145–170, Springer-Verlag, DOI: 10.1007/978-3-540-74247-0_7.CrossRefGoogle Scholar
  20. Schöbel, A. (2009). “Capacity constraints in delay management.” Public Transport, Vol. 1, No. 2, pp. 135–154, DOI: 10.1007/s12469-009-0010-0.CrossRefGoogle Scholar
  21. Shafahi, Y. and Khani, A. (2010). “A practical model for transfer optimization in a transit network: Model formulations and solutions.” Transportation Research Part A: Policy & Practice, Vol. 44, No. 6, pp. 377–389, DOI: 10.1016/j.tra.2010.03.007.Google Scholar
  22. Törnquist, J. (2012). “Design of an effective algorithm for fast response to the re-scheduling of railway traffic during disturbances.” Transportation Research Part C: Emerging Technologies, Vol. 20, No. 1, pp. 62–78, DOI: 10.1016/j.trc.2010.12.004.CrossRefGoogle Scholar
  23. Törnquist, J. and Persson, J. A. (2007). “N-tracked railway traffic rescheduling during disturbances.” Transportation Research Part B: Methodological, Vol. 41, pp. 342–362, DOI: 10.1016/j.trb.2006. 06.001.CrossRefGoogle Scholar
  24. Wong, R. C. W., Yuen, T. W. Y., Fung, K.W., and Leung, J. M. Y. (2008). “Optimizing timetable synchronization for rail mass transit.” Transportation Science, Vol. 42, No. 1, pp. 57–69, DOI: 10.1287/trsc.1070.0200.CrossRefGoogle Scholar
  25. Xu, W., Zhao, P., and Ning L. (2017). “A Passenger-Oriented Model for Train Rescheduling on an Urban Rail Transit Line considering Train Capacity Constraint.” Mathematical Problems in Engineering, Vol. 2017, Article ID 1010745, 9 pages. DOI:10.1155/2017/1010745.Google Scholar
  26. Yang, X., Ning, B., Li, X., and Tang, T. (2014). “A two-objective timetable optimization model in subway systems.” IEEE Transactions on Intelligent Transportation Systems, Vol. 15, No. 5, pp. 1913–1921, DOI: 10.1109/TITS.2014.2303146.CrossRefGoogle Scholar
  27. Zhou, F., Shi, J., and Pan, H. (2013a). “Optimization method for last train coordination plan of urban rail transit based on network operation.” the 13th CICTP, Vol. 96, pp. 2706–2712, Elsevier Science, DOI: 10.1016/j.sbspro.2013.08.304.Google Scholar
  28. Zhou, W., Deng, L., Xie, M., and Yang, X. (2013b). “Coordination optimization of the first and last trains’ departure time on urban rail transit network.” Advances in Mechanical Engineering, Vol. 5, No. 3, DOI: 10.1155/2013/848292.Google Scholar

Copyright information

© Korean Society of Civil Engineers and Springer-Verlag GmbH Germany 2017

Authors and Affiliations

  1. 1.School of Traffic and TransportationBeijing Jiaotong UniversityBeijingChina

Personalised recommendations