Skip to main content
Log in

Entwicklungsprojekte mit Portfolios steuern

  • Schwerpunkt
  • Best Practice
  • Published:
Controlling & Management Review Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Abb. 1
Abb. 2
Abb. 3

Literatur

  • Battenfeld, D. (2001): Behandlung von Komplexitätskosten in der Kostenrechnung, in: Kostenrechnungspraxis, 45 (3), S. 137–143.

    Google Scholar 

  • Baum, H.-G./ Coenenberg, A./ Günther, T. (2007): Strategisches Controlling, 7. Auflage, Stuttgart.

    Google Scholar 

  • Cooper, R. G. (2008): Perspective: The Stage-Gate® Idea-to-Launch-Process — Update, What’s new and NexGen Systems, in: Journal of Product Innovation Management, (25) 3, S. 213–232.

    Article  Google Scholar 

  • Heesen, M. (2009): Innovationsportfoliomanagement, Wiesbaden. www.springerprofessional.de/link/4548504

    Book  Google Scholar 

  • Spieth, P./ Lerch, M. (2014): Augmenting Innovation Project Portfolio Management Performance: The Mediating Effect of Management Perception and Satisfaction, in: R&D Management, 44 (5), S. 498–515.

    Article  Google Scholar 

  • Wendt, S. (2013): Strategisches Portfoliomanagement in dynamischen Technologiemärkten, Wiesbaden. www.springerprofessional.de/link/4508926

    Book  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Sandra Mühlböck.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Mühlböck, S. Entwicklungsprojekte mit Portfolios steuern. Control Manag Rev 61, 44–54 (2017). https://doi.org/10.1007/s12176-017-0018-2

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12176-017-0018-2

Navigation